Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 24 241983 WET 01 SA (Proposed redevelopment of the subject site with two 1-storey large format industrial bu..., 2024).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Development application24 241983 WET 01 SAUnder Review
Proposed redevelopment of the subject site with two 1-storey large format industrial buildings.The buildings are proposed to contain approximately 104,002 square metres of nonresidentialgross floor area, consisting primarily of warehousing space, with accessory office space.
Nov 22, 2024 · 1910 ALBION RD · City file - Zoning review11 235359 ZPRClosedJul 11, 2011 · 1910 ALBION RD
Check before you build
Site-specific exception 900.20.10(82)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The minimum building setback from a lot line abutting the following streets : (i) Highway 27 must be 26 metres; (ii) Albion Rd. must be 30.0 metres; (iii) Fourth Line must be 20.5 metres; and (iv) Royalcrest Rd. must be 30.5 metres. Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
The minimum building setback from a lot line abutting the following streets : (i) Highway 27 must be 26 metres; (ii) Albion Rd. must be 30.0 metres; (iii) Fourth Line must be 20.5 metres; and (iv) Royalcrest Rd. must be 30.5 metres. Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 12,118 m²
- Frontage
- 71.3 m
- Depth
- 170.6 m
- Street
- Albion Rd
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert the existing building into a restaurant with office use.
1839 ALBION RD · Mar 23, 2021 · 394 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to create office space for capasity of 9 people in Unit 6.
1917-1919 ALBION RD · Sep 28, 2026 · 164 m away - Zoning review
Closed
1917-1919 ALBION RD · Feb 5, 2025 · 164 m away - Zoning review
Closed
1870 ALBION RD · Jan 24, 2025 · 134 m away - Development application
Proposed redevelopment of the subject site with two 1-storey large format industrial buildings.The buildings are proposed to contain approximately 104,002 square metres of nonresidentialgross floor area, consisting primarily of warehousing space, with accessory office space.
1910 ALBION RD · Nov 22, 2024 · 51 m away · City file - Building permit
Proposing Kitchen Hood for the potato boiler equipment operated electrically.
1850 ALBION RD · Aug 12, 2024 · 268 m away - Zoning review
Closed
1860 ALBION RD · Mar 25, 2022 · 226 m away - Building permit
Proposal for interior alterations to the existing Samosa & Sweet Factory.
1850 ALBION RD · Mar 2, 2021 · 268 m away - Building permit
Proposal to construct a new steel building for enclosed storage on new concrete pad floor at the back of an existing office building.
1935 ALBION RD · Sep 9, 2020 · 199 m away - Zoning review
Closed
1935 ALBION RD · Aug 28, 2020 · 199 m away - Building permit
Proposal to replace the underground watermain in an existing warehouse - PHASE 1
1920 ALBION RD · Aug 25, 2020 · 182 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Westmore Station32 min walk
- Nearest TTC stop
- Opposite 1921 Albion Rd2 min walk
- Nearest traffic count
- 20,779 vehicles in 14 hAlbion Rd / Humberline Dr, 280 m away, Nov 9, 2024
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.