HousePrecheckCheck an address

191 Mill StToronto · zoning, lot size and permit records

52.1 × 133.6 m6,282 m²on Tannery Rdcorner, also on Mill St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 24 128570 (REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wal..., 2026); 24 224024 (Construction of an Emergency Services Building (ESB) along the Metrolinx Railway corrid..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 34 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
N50 m
52.1 m frontage133.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (13% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 143248 (HVAC - Construction of a temporary site office for the Lower Don Enabling Works 3 proje..., 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (97% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 128570 (REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wal..., 2026); 24 224024 (Construction of an Emergency Services Building (ESB) along the Metrolinx Railway corrid..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 34 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 224951 LGW 00 IVNotice Issued

    Notice Issued Long Grass

    Jul 10, 2026 · 191 MILL ST
  • By-law investigation26 199489 LGW 00 IRNotice Issued

    Long Grass and Weeds

    Jul 10, 2026 · 191 MILL ST
  • Building permit24 128570Revision Issued

    REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wall barrier along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

    May 27, 2026 · 191 MILL ST
  • Building permit24 224024Under Reviewnew building

    Construction of an Emergency Services Building (ESB) along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

    Oct 9, 2024 · 191 MILL ST
  • Building permit24 143248Permit Issued

    HVAC - Construction of a temporary site office for the Lower Don Enabling Works 3 project located at 191 Mill St. This temporary site office will be comprised of mobile site trailers. The temporary site office is required to support the construction project that will be on going for the next 5 years.

    Aug 16, 2024 · 191 MILL ST
  • Development application11 253735 STE 28 PLClosed

    Part lot control exemption - West Don Lands - Phase 2 - to facilitate the future conveyance of the development blocks within Phase 2 into their individual ownership/development parcels. Refer to related Plan of Subdivision application for the creation of the 16 larger development blocks from which the individual parcels will be created.

    Aug 9, 2011 · 225 MILL ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,282 m²
Frontage
52.1 m
Depth
133.6 m
Street
Tannery Rd
Corner lot
Yes, also on Mill St133.6 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    13

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

      425 CHERRY ST · Oct 21, 2020 · 314 m away
    • Minor varianceApproved

      To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.

      457 FRONT ST E · Feb 5, 2020 · 242 m away
    • Minor varianceApproved

      To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.

      391 CHERRY ST · Jun 26, 2019 · 299 m away
    • Minor varianceApproved

      To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.

      475 FRONT ST E · Aug 29, 2018 · 162 m away
    • Minor varianceApproved

      To alter the redevelopment plan for the 11-storey residential building containing 369 units approved under the Site-Specific By-law 4-2011 by reducing the requirement for residential and visitor parking as well as indoor amenity space.

      455 FRONT ST E · Feb 24, 2016 · 249 m away

    Latest activity nearby

    • Zoning review

      Closed

      455 FRONT ST E · Oct 29, 2026 · 249 m away
    • Zoning review

      Closed

      470 FRONT ST E · Jun 17, 2026 · 215 m away
    • Building permit

      REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wall barrier along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

      191 MILL ST · May 27, 2026 · 12 m away
    • Building permit

      1 Wall Sign

      460 FRONT ST E · Mar 3, 2026 · 228 m away
    • Building permit

      1 Wall Sign

      460 FRONT ST E · Feb 27, 2026 · 228 m away
    • Building permit

      Proposal interior alterations for restaurant (no change of use) - UNIT 16C

      460 FRONT ST E · Feb 5, 2026 · 228 m away
    • Building permit

      1 Wall Sign

      75 COOPERAGE ST · Aug 21, 2025 · 287 m away
    • Development application

      Combined Official Plan & Zoning By-law Amendment for four development blocks consisting of 14 mixed-use buildings. Tower heights range from 28-storeys to 53-storeys. The proposed total gross floor area ("GFA") is 325,000 m2 (9.31 FSI for the net site area) of which 311,401 m2 will be residential GFA and 13,599 m2 of non-residential GAF and a total of 4,994 new dwelling units.A revised draft plan of subdivision is likely required in a future application.

      324 CHERRY ST · Jun 10, 2025 · 260 m away · City file
    • Zoning review

      Application On Hold

      475 FRONT ST E · Apr 29, 2025 · 162 m away
    • Building permit

      Minor interior and exterior retro-fitting of exterior insulated spandrel panels to swap the existing banking equipment with new banking equipment.

      457 FRONT ST E · Oct 17, 2024 · 242 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    King Station32 min walk
    Nearest TTC stop
    Front St East at Bayview Ave2 min walk
    Nearest cycling route
    Mill StBi-Directional Cycle Track, 1 min walk
    Nearest traffic count
    413 vehicles in 8 hBayview Ave / Mill St, 90 m away, Mar 24, 2022
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Corktown Common1 min walk
    Diamond Jubilee Promenade3 min walk
    Lawren Harris Square5 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 6 min walk
    • INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
    • VOICE INTEGRATIVE PRIVATE SCHOOL Private 9 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 14 min walk
    • MARKET LANE JR & SR PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.