Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 72017 building permits open, the oldest since 1993
Needs a closer lookStill open in the City's records: 24 182085 (Installation of backflow preventers providing premise isolation for domestic and fire w..., 2024, status Permit Issued); 23 160530 (Existing diesel generator at McBrien Building will be replaced with a new diesel genera..., 2023, status Permit Issued); 21 127631 (Revision 01 - Roof rehabilitation with fluid applied overlay membrane. Include some acc..., 2022, status Revision Issued); and 14 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 155228 (Upgrades to the fire alarm system of TTC McBrien Building, 2026); 23 225961 (Revision 01 - new pit safetygrating, davit arms, fall arrest anchors and updated detail..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications18 development applications open within 300 m
Good to know18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
52 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 155228Permit Issued
Upgrades to the fire alarm system of TTC McBrien Building.
May 29, 2026 · 1900 YONGE ST - Building permit23 225961Revision Issued
Revision 01 - new pit safetygrating, davit arms, fall arrest anchors and updated detailsConstruction of new pit ladders at various locations at TTC's Davsiville Station
Aug 12, 2025 · 1900 YONGE ST - Building permit24 182085Permit Issued
Installation of backflow preventers providing premise isolation for domestic and fire water services serving TTC's Davisville Subway Station.
Aug 19, 2024 · 1900 YONGE ST - Building permit23 160530Permit Issued
Existing diesel generator at McBrien Building will be replaced with a new diesel generator and will match the capacity of existing, and be rated at 350KW, 600VAC, 3 phase equipment.
Jul 24, 2023 · 1900 YONGE ST - Building permit21 127631Revision Issued
Revision 01 - Roof rehabilitation with fluid applied overlay membrane. Include some accessory work (new guardrails, exterior metal stairs).Proposal for full roof replacement with minor mechanical work (rooftop hvac units) at existing TTC subway station - W C McBrien Building
Jul 6, 2022 · 1900 YONGE ST - Building permit21 211825Closed
New wall mounted guardrails at roof level of Toronto Transit Commission's Davisville Substation
Sep 30, 2021 · 1900 YONGE ST - Building permit19 214113Closed
Construct interior alterations for TTC - McBrien Building to the existing 4th floor office/data centre space, including replacment of existing associated mechancial units
Nov 4, 2019 · 1900 YONGE ST - Building permit19 101843Closed
Remove asphalt pavement and mill down bus driveway structural slabs; construct concrete overlay and new waterproofing system; construct new approach slabs; concrete repair to slabs; replace tile floor finishing; replace damaged sidewalk; construct and remove upon completion of the construction the work platform; remove and reconstruct bridge window enclosure and bridge deck, recoat existing steel beams, concrete patch repair to slabs.
Feb 1, 2019 · 1900 YONGE ST
Show 44 older records
- Building permit18 238206Inspection
Proposed interior alterations to north portion of 7th floor.
Oct 23, 2018 · 1900 YONGE ST - Building permit17 209568Closed
Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC Davisville station.
Aug 15, 2017 · 1900 YONGE ST - Building permit16 132924Inspection
Proposal for interior alterations to existing office building. Scope of work includes sump pump replacement and new installation of emergency lighting - Toronto Transit Commission
Apr 12, 2016 · 1900 YONGE ST - Building permit14 162400Closed
Proposal to construct an interior partition and add air conditioning units in the existing office building.
Aug 7, 2014 · 1900 YONGE ST - Building permit14 141695Closed
Proposal to replace the fire alarm panel in existing transit station building - Davisville TTC
Apr 29, 2014 · 1900 YONGE ST - Building permit13 216066Closed
REVISION- Proposal to convert storage room into 4 office cubicals (with partial height partitons) and convert existing offices on the north wall into open work stations.
Feb 19, 2014 · 1900 YONGE ST - Building permit13 216077Closed
Proposal to install 1 maglock in existing office space on the 2nd floor - Toronto Transit Commission. See related building permit 13 216066 BLD.
Sep 10, 2013 · 1900 YONGE ST - Building permit12 262364Permit Issued
Proposal to install 2 new split A/C units in existing computer room on the 4th floor.
Nov 1, 2012 · 1900 YONGE ST - Building permit08 171939Closed
Proposal to install one maglock on 6th floor of existing office building, in relation to building permit 08-149623, for TTC.
Jul 15, 2008 · 1900 YONGE ST - Building permit08 168552Closed
Install 6 maglocks to 2nd, 3rd and 4th floors. TTC Head Office. Single tenant building
Jul 10, 2008 · 1900 YONGE ST - Zoning review08 157233 LTOClosedMay 9, 2008 · 1900 YONGE ST
- Building permit08 149623Closed
Interior alterations to existing offices on 6th floor. Single tenant floor/building. TTC Building
May 1, 2008 · 1900 YONGE ST - Building permit08 102148Closed
installation of a maglock in double swing door on ground floor
Feb 6, 2008 · 1900 YONGE ST - Building permit07 288738Closed
Modifications to sprinkler & fire alarm in TTC station (Davisville).
Jan 9, 2008 · 1900 YONGE ST - Building permit07 272933Inspection
Interior alterations to portions of BSMT storage areas, remove internal stair with concrete infill. TTC Headquarters Building. Single Tenant Building
Nov 7, 2007 · 1900 YONGE ST - Building permit07 244294Inspection
1 maglock on 2nd floor
Aug 8, 2007 · 1900 YONGE ST - Building permit07 210351Inspection
Interior alterations to portions of 4th floor Offices. Singel tenant Floor
Jul 4, 2007 · 1900 YONGE ST - Building permit07 225973Closed
Interior alterations to create new WC/Locker rooms on 2nd floor. TTC Building
Jun 12, 2007 · 1900 YONGE ST - Building permit06 185664Closed
Interior alteration to GF customer service area of TTC Building head office.
Nov 28, 2006 · 1900 YONGE ST - Building permit06 183690Closed
Proposed window replacement to entire building and exterior masonry rehabilitation. Fee based on 424 windows and 43.4 sq/m of masonry rehabilitation.
Oct 19, 2006 · 1900 YONGE ST - Building permit06 175376Closed
Make interior alterations to 7th floor office. TTC.
Oct 17, 2006 · 1900 YONGE ST - Building permit06 165916Inspection
Interior alterations to existing office space on the 3rd floor. (TTC Head Office)
Sep 5, 2006 · 1900 YONGE ST - Building permit05 172209Closed - Dormant
HVAC - Ugrade the electrical capacity to the existing building. A 1500kVA unit substation to be installed above ground on existing parking lot with a new 8'-0" high brick wall enclosure. Swith gear to be installed in an expanded electrical room on mezzanine level of carhouse - Multiple Projects
Sep 22, 2005 · 1900 YONGE ST - Building permit05 134237Closed
Enlarge existing electrical room, TTC head office
May 19, 2005 · 1900 YONGE ST - Building permit05 116461Inspection
To demolish existing platforms and construct new concrete platforms.
Mar 31, 2005 · 1900 YONGE ST - Zoning review04 158062 ZPRClosedJul 19, 2004 · 1900 YONGE ST
- Building permit02 156545Inspection
make interior alterations to portion of the ground floor - transit shop
Jul 26, 2002 · 1900 YONGE ST - Building permit00 326624Closed
Install partitions on portion of the 2nd floor office.
Aug 15, 2000 · 1900 YONGE ST - Building permit00 123624Closed
Construct 1 storey addition at the rear of the property on the west elevation and make interior alterations
May 26, 2000 · 1900 YONGE ST - Building permit00 133911Inspection
Alter ductwork at track level to existing h.v.a.c. system. cost incl. 99 -117593
Mar 21, 2000 · 1900 YONGE ST - Building permit00 133906Closed
Install 4 elevator sumps and 4 v.f.d. at track level. -plans. cost incl. 99 -117593
Mar 20, 2000 · 1900 YONGE ST - Building permit99 117593Inspection
CARD PRINTED make interior alterations and erect 1 storey addition at north east corner
Mar 8, 2000 · 1900 YONGE ST - Building permit99 019450Closed
INSTALL BOILERS IN MECHANICAL PENTHOUSE ADDITION SEE APPL # 428325 JNB
Oct 20, 1999 · 1900 YONGE ST - Building permit99 019113Closed
CONSTRUCT MECHANICAL PENTHOUSE. FEE $ 337.24
Oct 6, 1999 · 1900 YONGE ST - Building permit99 013883Closed
INSTALL FIRE ALARM SYSTEM THROUGHOUT BUILDING. EDC
Jun 1, 1999 · 1900 YONGE ST - Building permit98 021120Permit Issued
INSTALL H.V.A.C. UNIT ON ROOF AND RENOVATE AIR HANDLING UNIT IN BASEMENT JNB
Oct 27, 1998 · 1900 YONGE ST - Building permit98 017655Closed
INSTALL WINDOW WASHER ANCHORS ON ROOF TENANT: TTC CONSTRUCTION COST = $630 (PER DAVID BREZER MAY 22/98 CONVERSTN) (W22)/SP (SEE PRINTOUT SHEET FOR CONVERSION OF COST)
Aug 20, 1998 · 1900 YONGE ST - Zoning review98 025803 LTOClosedMar 9, 1998 · 1900 YONGE ST
- Building permit98 012249Closed - Dormant
INSTALL PLUMBING FIXTURES ON GROUND FLOOR RESTAURANT: 2 W.C., 4 W.B., 1 3-COMPT. K.S., 1 DISHWASHER, 1 H.W.T., 1 JANITOR SINK REFER TO APPLICATION NUMBER: 407829 COST INCLUDED IN 407829 EDC
Jan 28, 1998 · 1900 YONGE ST - Building permit97 019343Closed
INSTALL TELECOMMUNICATIONS ANTENNAS AND RELATED CABLE TO EQUIPMENT WITHIN MECHANICAL PENTHOUSE AT ROOF LEVEL. /LM
Aug 6, 1997 · 1900 YONGE ST - Building permit95 017040Closed
INSTALL FIRE ALARM SYSTEM IN REPAIR SHOP. TTC
Jun 8, 1995 · 1900 YONGE ST - Zoning review94 024688 LTOClosedMar 25, 1994 · 1900 YONGE ST
- Building permit93 023800Permit Issued
INSTALL FIXTURES PLATFORM LEVEL 2 ELEVATOR PIT DRAINS, 2 OIL INTERCEPTORS, CONCOURSE LEVEL 2 ELEV. PIT DRAINS AND 1 OIL INTER COST INCLUDED WITH APPL.355470 SS
Feb 24, 1994 · 3 CHAPLIN CRES - Building permit93 021672Inspection
MAKE INTERIOR ALTERATIONS TO SUBWAY STATION, INSTALL FOUR ELEVATORS AND ALSO REPLACE WITH LARGER CANOPY AT THE ENTRANCE OF THE SUBWAY;
Dec 21, 1993 · 3 CHAPLIN CRES
Check before you build
Site-specific exception 900.11.10(2508)
Needs a closer look4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Rule B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 269 of former City of Toronto By-law 438-86
- Rule D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 269 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
Lot facts
- Area
- 3,414 m²
- Frontage
- 41.7 mestimated, irregular lot
- Depth
- 142.1 mestimated, irregular lot
- Street
- Balliol St
- Corner lot
- Yes, also on Yonge St142.1 m along it
- Public lane
- None
- House footprint
- 1,373 m²roof up to 46.3 m
- Back yard
- 6.5 mhouse to rear lot line
- Side yards
- 1 m and 2.3 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 38 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
- Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 3.0 (c3.0; r2.5) SS2 (x2508) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%14 of 14 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 35
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
119 MERTON ST · Nov 19, 2025 · 380 m away - Minor varianceApproved
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
119 MERTON ST · May 31, 2023 · 380 m away - Minor varianceApproved
To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.
1913 YONGE ST · Jun 8, 2022 · 109 m away - Minor varianceApproved
To permit the provisions of By-law 438-86, as amended by prevailing by law 967-88 to continue to be administered and applied over the entire parcel of lands collectively municipally known as 1920/1944 Yonge Street, notwithstanding any further conveyance, partition, or division of the lands.
1944 YONGE ST · Feb 28, 2017 · 163 m away - Minor varianceApproved
To permit the provisions of By-law 438-86, as amended by prevailing by law 967-88 to continue to be administered and applied over the entire parcel of lands collectively municipally known as 1920/1944 Yonge Street, notwithstanding any further conveyance, partition, or division of the lands.
1944 YONGE ST · Feb 28, 2017 · 163 m away
Latest activity nearby
- Zoning review
Not Started
21 IMPERIAL ST · Nov 24, 2026 · 213 m away - Zoning review
Application On Hold
1849 YONGE ST · Nov 23, 2026 · 106 m away - Building permit
Proposal to construct an one-storey rear yard addition and new deck.See also 26-255451 ZAP 00 ZR
30 CHAPLIN CRES · Nov 20, 2026 · 150 m away - Zoning review
Closed
1920 YONGE ST · Oct 29, 2026 · 131 m away - Building permit
INTERIOR ALTERATIONS - DEMISING PARTITION - UNIT 906
1867 YONGE ST · Oct 29, 2026 · 84 m away - Building permit
Proposed demolition of the existing 5-storey commercial building.
25 IMPERIAL ST · Oct 23, 2026 · 216 m away - Building permit
Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.
21 IMPERIAL ST · Oct 23, 2026 · 213 m away - Consent (lot split)Approved
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
30 MERTON ST · Oct 21, 2026 · 175 m away - Zoning review
Closed
30 CHAPLIN CRES · Oct 16, 2026 · 150 m away - Building permit
Proposal for concrete slab repair within parking garage
25 LASCELLES BLVD · Oct 9, 2026 · 274 m away
Neighbourhood: Yonge-Eglinton
About the area around the lot, not the lot itself.
- Nearest station
- Davisville Station1 min walk
- Nearest TTC stop
- Davisville Station1 min walk
- Nearest cycling route
- Yonge StCycle Track, 1 min walk
- Nearest traffic count
- 25,927 vehicles in 14 hYonge St / Davisville Ave / Chaplin Cres, 80 m away, Jun 3, 2025
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Oriole Park - Toronto2 min walk
- Fiona Nelson Parkette3 min walk
- Kay Gardner Beltline Park3 min walk
Schools within 1 km
- DAVISVILLE & SPECTRUM SCHOOL English Public 4 min walk
- THE STUDY ACADEMY Private 7 min walk
- THE STUDY ACADEMY SCHOOL Private 7 min walk
- THE YORK SCHOOL - JR CAMPUS Private 11 min walk
- UPPER CANADA COLLEGE SCHOOL Private 13 min walk
- MANOR MONTESSORI - DE SAVERY SITE Private 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Eglinton | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $94,000 | $84,500 |
| Households that own their home | 37% | 54% |
| Population (2021) | 12,410 | 16,813 |
| Homes built in 1960 or before | 47% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Eglinton | City median |
|---|---|---|
| Assault | 713.8 | 636.3 |
| Robbery | 95.2 | 69.5 |
| Auto theft | 115.6 | 192.6 |
| Theft over $5,000 | 102 | 46.1 |
| Break and enter | 136 | 172.8 |
| Theft from vehicles | 54.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.