HousePrecheckCheck an address

190 Milvan DrToronto · zoning, lot size and permit records

Employment · EL 1.082.3 × 99.0 m8,149 m²on Milvan Dr

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.8 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 152849 (Proposaal for replace/repair building components damaged from roof collapse, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
82.3 m frontage99.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 19 133179 (Proposal for structural repairs to the flat roof of the building resulting from a parti..., 2019, status Inspection); 05 174452 (interior alters to industrial unit to create a place of worship, 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 152849 (Proposaal for replace/repair building components damaged from roof collapse, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 248767 WST 00 IRClosed

    Waste

    Nov 3, 2025 · 190 MILVAN DR
  • Building permit25 152849Inspection

    Proposaal for replace/repair building components damaged from roof collapse.

    May 27, 2025 · 190 MILVAN DR
  • Zoning review23 140014 LPRClosed
    May 1, 2023 · 190 MILVAN DR
  • Zoning review20 228406 ZZUClosed
    Dec 11, 2020 · 190 MILVAN DR
  • Building permit19 133179Inspection

    Proposal for structural repairs to the flat roof of the building resulting from a partial roof collapse above unit 9

    May 2, 2019 · 190 MILVAN DR
  • Zoning review12 220116 ZPUClosed
    Jul 27, 2012 · 190 MILVAN DR
  • Zoning review08 114883 ZPUClosed
    Feb 27, 2008 · 190 MILVAN DR
  • Building permit05 174452Inspection

    interior alters to industrial unit to create a place of worship

    Sep 16, 2005 · 190 MILVAN DR
Show 4 older records
  • Zoning review05 138155 ZPRClosed
    Jun 1, 2005 · 190 MILVAN DR
  • Zoning review03 124761 ZPUClosed
    Apr 17, 2003 · 190 MILVAN DR
  • Zoning review02 102676 ZPUClosed
    Jan 14, 2002 · 190 MILVAN DR
  • Zoning review02 102673 ZPUCancelled
    Jan 14, 2002 · 190 MILVAN DR

Lot facts

Area
8,149 m²
Frontage
82.3 m
Depth
99 m
Street
Milvan Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone EL 1.0 (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: apple, sargents (29 cm), apple, sargents (28 cm), apple, sargents (26 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
50%1 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing building into a cultral community centre and a place of worship with children after school drop off programs.

    172 MILVAN DR · Apr 20, 2017 · 220 m away

Latest activity nearby

  • Zoning review

    Not Started

    98 MILLWICK DR · Nov 23, 2026 · 207 m away
  • Building permit

    Proposed Architectural interior alterations for restaurant / eat-in cafe use; ground floor and basement. Architectural submission only.

    126 MILLWICK DR · Oct 23, 2026 · 264 m away
  • Zoning review

    Closed

    18-20 SATTERLY RD · Oct 15, 2026 · 295 m away
  • Building permit

    REV01: Revision to 24 230185 BLD 00 BA to raise roof of a building and structural redesign.PROPOSED RAISING THE ROOF OF A BUILDING AND NEW LOADING DOCK

    200-202 MILVAN DR · Oct 7, 2026 · 70 m away
  • Building permit

    Fire Damage - Restore the building to its pre-loss condition. Work includes replacing damaged roof structural members within the lower attic with engineered trusses, replacing damaged wall studs, gable wall framing, header beams, and top plates, and restoring all affected structural elements. Damaged doors and windows will be removed and replaced with comparable units. Additionally, all damaged interior finishes, including wall, ceiling, and floor materials, will be fully removed and replaced to match existing conditions and finishes present before the loss.

    78 SEACLIFF BLVD · Sep 8, 2026 · 214 m away
  • Zoning review

    Closed

    122 MILLWICK DR · Aug 26, 2026 · 219 m away
  • Zoning review

    Closed

    2965 ISLINGTON AVE · Jun 12, 2026 · 281 m away
  • Building permit

    Plumbing - Proposal for minor interior alterations and plumbing work to Barber Shop

    6-8 SATTERLY RD · May 27, 2026 · 279 m away
  • Building permit

    Upgrade existing fire protection system to meet storage requirements

    154-160 MILVAN DR · May 19, 2026 · 255 m away
  • Zoning review

    Closed

    139 MILLWICK DR · Apr 28, 2026 · 151 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Pearldale Station22 min walk
Nearest TTC stop
180 Milvan Dr2 min walk
Nearest traffic count
7,639 vehicles in 8 hMillwick Dr / Milvan Dr (North), 150 m away, Feb 14, 2012
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Whitfield Parkette6 min walk
Plunkett Park8 min walk
Knights of Columbus Park9 min walk

Schools within 1 km

  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • GRACEDALE PUBLIC SCHOOL English Public 13 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.