HousePrecheckCheck an address

190 Dundas St EToronto · zoning, lot size and permit records

Also 192 Dundas St E, 200 Dundas St E

≈ 47.0 × 68.9 m1,748 m²on George Stcorner, also on Dundas St E

Not a single house

Several homes on one parcel

3 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 3 homes on one parcel of 0.2 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 10 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
≈ 47.0 m frontage≈ 68.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 Committee of Adjustment files on this lot

    Good to know

    4 approved. A0803/21TEY (To alter the redevelopment plan approved under Site Specific By-law 1341-2013 by increa..., 2021); A0232/18TEY (To modify the redevelopment plan approved under Site-specific By-law 1341-2013 by provi..., 2018); A0893/15TEY (To alter the re-development plan for the 50-storey mixed use building approved under si..., 2015); and 1 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

27 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 232394 LTOClosed
    Sep 4, 2026 · 200 DUNDAS ST E
  • Building permit21 251131Closed

    FS - Sprinkler Shop Drawing - Interior alterations to existing office space which includes the creation of a new floor structure within the existing 2nd floor 'City Space' Volume. New work to function an event and meeting room within an existing primary use of an office spaces.

    Aug 21, 2025 · 200 DUNDAS ST E
  • Building permit25 156459Closed

    2 overhanging structure signs**Indigenous Centre for Innovation and Entrepreneurship**

    May 16, 2025 · 200 DUNDAS ST E
  • Building permit25 150355Cancelled

    1 overhanging structure sign**INDIGENOUS CENTRE FOR INNOVATION AND ENTREPRENEURSHIP**

    Apr 28, 2025 · 200 DUNDAS ST E
  • Building permit25 144107Closed

    Addition of 3 maglocks to the 3rd floor

    Apr 15, 2025 · 200 DUNDAS ST E
  • Building permit25 144248Cancelled

    1 overhanging structure sign**Indigenous Centre for Innovation and Entrepreneurship**

    Apr 14, 2025 · 200 DUNDAS ST E
  • Building permit23 144774Closed

    Rev 01:- Interior alterations of the existing unit for a restaurant involving interior partitioning & plumbing work.Interior alterations to existing vacant unit (new build)

    Aug 28, 2023 · 200 DUNDAS ST E
  • Building permit22 131104Refused

    Application for an alternative solution evaluation - Application 21 251131 BLD 00 BA for exposed mass timber construction use in an addition within a 50 storey existing building

    Apr 6, 2022 · 200 DUNDAS ST E
Show 19 older records
  • Building permit21 248304Cancelled

    Interior alterations to 200 Dundas Street East including the addtion of a new floor structure within the existing 2nd floor 'City Space' Volume. New work to function as mixed use space, including office functions, event and meeting spaces.

    Dec 13, 2021 · 200 DUNDAS ST E
  • Minor varianceA0803/21TEYApproved

    To alter the redevelopment plan approved under Site Specific By-law 1341-2013 by increasing the allowable maximum residential and non-residential gross floor area by constructing a mezzanine on the second floor.

    Sep 15, 2021 · 200 DUNDAS ST E
  • Zoning review21 205916 ZPRClosed
    Aug 30, 2021 · 200 DUNDAS ST E
  • Building permit21 145012Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display two wall signs and two overhanging structure signs, all illuminated, displaying static copy at the 1st floor on the south and west elevations.*****TD*****

    Jun 8, 2021 · 200 DUNDAS ST E
  • Zoning review21 160270 ZPRClosed
    May 25, 2021 · 200 DUNDAS ST E
  • Building permit21 149981Cancelled

    To erect and display one illuminated ground sign.***** TD *****

    May 4, 2021 · 200 DUNDAS ST E
  • Building permit20 166960Closed

    To erect and display two illuminated wall signs displaying static copy,. Erected at the first storey of the west and south elevations of the building.****THE GUPTA GROUP****

    Aug 11, 2020 · 200 DUNDAS ST E
  • Zoning review20 121103 ZPRClosed
    Mar 2, 2020 · 200 DUNDAS ST E
  • Development application19 192246 STE 13 CDClosed

    Draft Plan of Condo for a recenty-constructed mixed-use building containing 1012 residential units

    Jul 19, 2019 · 200 DUNDAS ST E · City file
  • Minor varianceA0232/18TEYApproved

    To modify the redevelopment plan approved under Site-specific By-law 1341-2013 by providing 50 three-bedroom dwelling units and 52 two-bedroom dwelling units that are convertible to three-bedroom units, in lieu of 102 three-bedroom dwelling units.

    Aug 15, 2018 · 200 DUNDAS ST E
  • Minor varianceA0893/15TEYApproved

    To alter the re-development plan for the 50-storey mixed use building approved under site-specific By-law 1341-2013, by reducing the number of three-bedroom dwelling units and increasing the height and enevelope of the building.

    Nov 18, 2015 · 200 DUNDAS ST E
  • Zoning review14 177706 PSPClosed
    Aug 20, 2015 · 200 DUNDAS ST E
  • Minor varianceA0836/14TEYApproved

    To alter the re-development plan for a 47-storey mixed use building approved under site specific By-law 1341-2013 by reducing the number of parking spaces, increasing the height of the building, and to alter the definition of residential amenity space.

    Feb 25, 2015 · 200 DUNDAS ST E
  • Development application14 174889 STE 27 SAClosed

    Site Plan Approval application for a mixed-use building comprised of a 50-storey tower along the Jarvis Street frontage, stepping down toward the north and east with a 19-storey base building element along the Dundas Street East frontage. The proposal contains 555 dwelling units, 1,113 square metres of retail space, and 1,300 square metres of community space.

    Jun 16, 2014 · 200 DUNDAS ST E · City file
  • Zoning review11 300010 PRZClosed
    Oct 27, 2011 · 200 DUNDAS ST E
  • Development application11 295873 STE 27 OZClosed

    Rezoning application to permit the redevelopment of the lands for a new mixed use building comprised of one tower and a slab 16 storey base building that transitions to fourteen and then 4 storeys along George Street. 767 Residential units are proposed, with 1262.51 square meters of cultural space. 786 bicycle parking spaces are proposed as well as 405 vehicle parking spaces.

    Oct 20, 2011 · 200 DUNDAS ST E
  • Zoning review01 035535 ZSVClosed
    Jul 3, 2001 · 200 DUNDAS ST E
  • Zoning review00 012547 LTOClosed
    May 15, 2000 · 200 DUNDAS ST E
  • Zoning review93 024665 LTOClosed
    Jan 25, 1993 · 200 DUNDAS ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,748 m²
Frontage
47 mestimated, irregular lot
Depth
68.9 mestimated, irregular lot
Street
George St
Corner lot
Yes, also on Dundas St E68.9 m along it
Public lane
None
House footprint
320 m²
Back yard
26.5 mhouse to rear lot line
Side yards
11.3 m and 19.9 mhouse to side lot lines
Buildings on the lot
9house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, freeman (6 cm), elm (6 cm), planetree, london (6 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%23 of 24 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
18
Development applications
40

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 383 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 62 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 480 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 355 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 232 m away

Latest activity nearby

  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 255 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 103 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 215 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 189 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 56 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Oct 2, 2026 · 116 m away
  • Building permit

    Proposal to replace roof top mounted mechanical units.

    311 JARVIS ST · Oct 1, 2026 · 213 m away
  • Building permit

    Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St

    257 JARVIS ST · Sep 25, 2026 · 42 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Sep 16, 2026 · 116 m away
  • Building permit

    Installation of a new maglock at P1 stairwell and a new key switch in FACP room

    65 MUTUAL ST · Sep 10, 2026 · 199 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station9 min walk
Nearest TTC stop
Dundas St East at Jarvis St1 min walk
Nearest cycling route
Shuter StCycle Track, 4 min walk
Nearest traffic count
6,552 vehicles in 8 hDundas St E / George St, 60 m away, Apr 19, 2023
Serious collisions within 500 m
212021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 2 with cyclists
Parks
Arena Gardens3 min walk
Moss Park4 min walk
45 Dalhousie St Park5 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 6 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 6 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 6 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.