HousePrecheckCheck an address

190 Cherry StToronto · zoning, lot size and permit records

68.0 × 161.1 m9,687 m²on Cherry Stcorner, also on Polson St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 268372 (1 Ground Sign***PORSHE***, 2026); 26 133425 (Installation of 3 eloctromagnetic locks on level 3 of the new motor vechicle dealership, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
68.0 m frontage161.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 268372 (1 Ground Sign***PORSHE***, 2026); 26 133425 (Installation of 3 eloctromagnetic locks on level 3 of the new motor vechicle dealership, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    1 approved. SYS 5913583 (Proposal to reduce the parking requirement for the existing car dealership (Porsche), 2026); B0002/07TEY (To lease the Parts 1-9 on the Draft Reference Plan for a period in excess of 21 years...., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 268372Permit Issued

    1 Ground Sign***PORSHE***

    Nov 13, 2026 · 190 CHERRY ST
  • Building permit26 256672Cancelled

    1 Ground Sign****Porsche****

    Oct 19, 2026 · 190 CHERRY ST
  • Zoning review26 233517 ZAPNotice Sent
    Sep 8, 2026 · 190 CHERRY ST
  • Minor varianceSYS 5913583Pending

    Proposal to reduce the parking requirement for the existing car dealership (Porsche)

    Sep 8, 2026 · 190 CHERRY ST
  • Zoning review26 163092 LPRClosed
    May 19, 2026 · 190 CHERRY ST
  • Building permit25 249248Closed

    REVISION TO 25 249248 DST 00 DS - Change in ground sign locationA proposal to erect and display 3 wall signs and one ground sign, all displaying static copy.**PORSCH (DOWNTOWN TORONTO)

    Apr 9, 2026 · 190 CHERRY ST
  • Building permit26 133425Inspection

    Installation of 3 eloctromagnetic locks on level 3 of the new motor vechicle dealership

    Apr 7, 2026 · 190 CHERRY ST
  • Building permit24 161572Closednew building

    Conditional Permit - Proposal to construct a new 3 storey car dealership - Porsche Centre DowntownSee also 24 144833 STE SA

    Aug 28, 2025 · 190 CHERRY ST
Show 10 older records
  • Zoning review24 144833 PSPClosed
    Jul 29, 2024 · 190 CHERRY ST
  • Development application24 144833 STE 14 SAClosed

    Site Plan Control application to permit a new, 3-storey Porsche Centre Downtown automotive dealership and service shop with 5,846 square metres of GFA.

    May 6, 2024 · 190 CHERRY ST · City file
  • Zoning review23 160881 ZZUClosed
    Jun 14, 2023 · 190 CHERRY ST
  • Building permit21 214527Cancelled

    PROPOSAL FOR A TEMPORARY PUROLATOR DISTRIBUTION CENTRE

    Sep 17, 2021 · 190 CHERRY ST
  • Consent (lot split)B0002/07TEYApproved

    To lease the Parts 1-9 on the Draft Reference Plan for a period in excess of 21 years. The use of the leased portion of 190 Cherry Street is for the purpose of an ancillary parking for a grocery store for a period of 40 years. No changes to the property layout are proposed.

    Jun 6, 2007 · 190 CHERRY ST
  • Zoning review04 100966 PSPClosed
    Jan 8, 2004 · 190 CHERRY ST
  • Zoning review03 187640 PSPClosed
    Oct 22, 2003 · 190 CHERRY ST
  • Zoning review03 171716 PSPClosed
    Sep 4, 2003 · 190 CHERRY ST
  • Zoning review03 163686 PSPClosed
    Aug 6, 2003 · 190 CHERRY ST
  • Zoning review03 118910 PSPClosed
    Mar 28, 2003 · 190 CHERRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
9,687 m²
Frontage
68 m
Depth
161.1 m
Street
Cherry St
Corner lot
Yes, also on Polson St161.1 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new building which is to be used as a recreation centre (Basketball Courts).

      185 CHERRY ST · May 14, 2008 · 227 m away
    • Minor varianceApproved

      To permit the specific use of the Royal Canadian Yacht Club City Station on the subject property.

      130 CHERRY ST · Mar 19, 2008 · 371 m away

    Latest activity nearby

    • Zoning review

      Not Started

      55 POLSON ST · Nov 17, 2026 · 151 m away
    • Building permit

      1 Ground Sign***PORSHE***

      190 CHERRY ST · Nov 13, 2026 · 66 m away
    • Building permit

      1 Ground Sign****Porsche****

      190 CHERRY ST · Oct 19, 2026 · 66 m away
    • Building permit

      EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027.

      176 CHERRY ST · Oct 8, 2026 · 228 m away
    • Zoning review

      Notice Sent

      190 CHERRY ST · Sep 8, 2026 · 66 m away
    • Minor variancePending

      Proposal to reduce the parking requirement for the existing car dealership (Porsche)

      190 CHERRY ST · Sep 8, 2026 · 66 m away
    • Building permit

      Installation of temporary structures for a temporary one-day outdoor event, including a bandstand, viewing decks, and front-of-house platformSet up August 31 and Removal September 11

      185 CHERRY ST · Aug 28, 2026 · 227 m away
    • Building permit

      Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028))

      185 CHERRY ST · Aug 5, 2026 · 227 m away
    • Building permit

      Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tear down Aug. 10, 2026.

      185 CHERRY ST · Jul 31, 2026 · 227 m away
    • Building permit

      Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform.

      185 CHERRY ST · Jun 26, 2026 · 227 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station34 min walk
    Nearest TTC stop
    Commissioners St at Cherry St East Side5 min walk
    Nearest cycling route
    Biidaasige Park TrlMulti-Use Trail, 1 min walk
    Nearest traffic count
    5,350 vehicles in 14 hPolson St / Cherry St / Martin Goodman Trl, 100 m away, Oct 6, 2026
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Biidaasige Park1 min walk
    Jennifer Kateryna Koval's'kyj Park5 min walk
    Cherry Beach Sports Fields11 min walk

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.