HousePrecheckCheck an address

19 Trinity SqToronto · zoning, lot size and permit records

Also 14 Trinity Sq

≈ 54.7 × 75.8 m3,354 m²on Trinity Sq

Not a home

Trinity Square Park

The City of Toronto's real estate inventory lists Trinity Square Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 241088 (Proposal for Nuit Blanche 2026 (Event) - Project Name: Eversick (Artist)2 - 10' x 10' x..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 67 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
≈ 54.7 m frontage≈ 75.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 21 173072 (Revision 01 - Amending the location of the condensing units from the upper reach area o..., 2021, status Revision Issued); 16 106909 (Proposal to replace existing fire alarm panel and annunciator, 2016, status Inspection); 15 229253 (Porposal for excavation of the foundations in the area of work (at the northwest corner..., 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 241088 (Proposal for Nuit Blanche 2026 (Event) - Project Name: Eversick (Artist)2 - 10' x 10' x..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 67 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 241088Permit Issued

    Proposal for Nuit Blanche 2026 (Event) - Project Name: Eversick (Artist)2 - 10' x 10' x 30' Scaffold Towers to Support Projection

    Sep 25, 2026 · 19 TRINITY SQ
  • By-law investigation26 183735 GRA 00 IRClosed

    Graffiti

    Jun 12, 2026 · 19 TRINITY SQ
  • Building permit21 173072Revision Issued

    Revision 01 - Amending the location of the condensing units from the upper reach area of the church to the base corner of the church as per the attached drawings.Replacing existing heating system with energy efficient system, including installing new fans in key areas of the nave of the church and additing condensing unit in the upper reach area of the church wall.

    Oct 7, 2021 · 19 TRINITY SQ
  • Building permit17 167028Closed

    Proposal to install a temporary portable stage system to be erected June 13, 2017 - and dismantled June 13, 2017 - Play The Parks Music Festival

    May 30, 2017 · 19 TRINITY SQ
  • Building permit16 162290Closed

    Proposal to install a temporary portable stage system to be erected June 22, 2016 - and dismantled June 22, 2016.

    Jun 9, 2016 · 19 TRINITY SQ
  • Building permit16 106909Inspection

    Proposal to replace existing fire alarm panel and annunciator

    Feb 16, 2016 · 19 TRINITY SQ
  • Building permit15 229253Permit Issued

    Porposal for excavation of the foundations in the area of work (at the northwest corner of the Church). Installation of helical piles and pile caps below the existing foundation walls in a sequenced process in the area of work. Preparation of the foundation wall surfaces, wholesale repointing, and installation of damproofing at the exterior face. Backfilling of the excavation and reinstatement of interior and exterior finishes to match existing.

    Oct 15, 2015 · 19 TRINITY SQ
  • Building permit08 166383Closed

    Structural reinforcing of structure to existing Church of the Holy Trinity

    Jun 24, 2008 · 19 TRINITY SQ
Show 1 older records
  • Zoning review00 013158 LTOClosed
    Nov 28, 2000 · 19 TRINITY SQ

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,354 m²
Frontage
54.7 mestimated, irregular lot
Depth
75.8 mestimated, irregular lot
Street
Trinity Sq
Corner lot
No
Public lane
None
House footprint
954 m²roof up to 30.7 m
Back yard
13.4 mhouse to rear lot line
Side yards
8.2 m and 12.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%8 of 8 decisions
    Garden suite permits
    2
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    22

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

      332 YONGE ST · Oct 14, 2026 · 299 m away
    • Minor varianceApproved

      To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

      30 BOND ST · Jan 21, 2026 · 345 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

      130 ELIZABETH ST · Jan 14, 2026 · 353 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

      241 CHURCH ST · Jul 30, 2025 · 453 m away
    • Minor varianceApproved

      To permit a place of amusement (arcade) use on this subject lot.

      247 YONGE ST · Jan 8, 2025 · 146 m away

    Latest activity nearby

    • Building permit

      Installation of two (2) temporary structures for Cavalcade of Lights 2026 (Event)30' x 30' Tent for Arts & Crafts Supplied by Gervais Tents20' x 16' x 5' Theatre Stage Extension Riser Supplied by PSIInstall 11/25/2026 / Removal 11/29/2026

      100 QUEEN ST W · Nov 19, 2026 · 225 m away
    • Building permit

      Proposed an interior alteration

      595 BAY ST · Nov 19, 2026 · 215 m away
    • Building permit

      Proposal for interior alterations including furniture & elevator refurbishment.

      100 QUEEN ST W · Nov 18, 2026 · 225 m away
    • Building permit

      INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

      121 DUNDAS ST W · Nov 17, 2026 · 232 m away
    • Zoning review

      Closed

      220 YONGE ST · Nov 10, 2026 · 170 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

      595 BAY ST · Nov 9, 2026 · 215 m away
    • Zoning review

      Not Started

      21 DUNDAS SQ · Nov 6, 2026 · 205 m away
    • Building permit

      Proposal to install and update the existing sprinkler system in the washrooms on the 22nd and 26th floors.

      20 QUEEN ST W · Nov 6, 2026 · 269 m away
    • Building permit

      Proposed interior alterations to existing tenant retail space.

      220 YONGE ST · Nov 6, 2026 · 170 m away
    • Building permit

      Proposal for interior alterations to an existing retail store to accommodate a new tenant.

      220 YONGE ST · Nov 6, 2026 · 170 m away

    Neighbourhood: Yonge-Bay Corridor

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station3 min walk
    Nearest TTC stop
    Opposite 247 Yonge St - Toronto Eaton Centre2 min walk
    Nearest cycling route
    Bay StSharrows - Arterial, 2 min walk
    Nearest traffic count
    7,255 vehicles in 14 hYonge St: Shuter St - Dundas Sq, 120 m away, Apr 12, 2025
    Serious collisions within 500 m
    112021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 1 with cyclists
    Parks
    Trinity Square1 min walk
    Larry Sefton Park2 min walk
    Toronto Metropolitan University Square5 min walk

    Schools within 1 km

    • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 2 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 5 min walk
    • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
    • TMU - HEASLIP HOUSE University 5 min walk
    • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
    • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-Bay CorridorMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home32%54%
    Population (2021)12,64516,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-Bay CorridorCity median
    Assault3361.1636.3
    Robbery300.169.5
    Homicide125.3
    Shootings1210.5
    Auto theft162.1192.6
    Theft over $5,000210.146.1
    Break and enter552.2172.8
    Theft from vehicles402.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.