Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2013
Needs a closer lookStill open in the City's records: 13 152132 (Interior alterations to create sales office within an existing industrial building for..., 2013, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 21 211444 WET 07 OZ (Official Plan and Zoning By-law amendments to permit 4 mixed-use buildings of heights 2..., 2021); 21 211446 WET 07 SB (Proposed Plan of Subdivision application to create 4 blocks and the dedication of a pub..., 2021).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications4 development applications open within 300 m
Good to know4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
4 records on file: more than at 88% of Toronto houses (median 0).
- Development application21 211444 WET 07 OZOMB Approved
Official Plan and Zoning By-law amendments to permit 4 mixed-use buildings of heights 27, 29, 36 and 38 storeys consisting of 1275 residential dwelling units, and non-residential gross floor area of 1,173sq.m., resulting in a total gross floor area of 94,819 sq.m. spaces and 941 bicycle parking spaces are proposed to be contained within three 4-level underground garages and at-grade. An on-site parkland dedication of 1,630 sq.m., a POPS of 613 sq.m. and a public road are also proposed.
Sep 12, 2021 · 15 TORYORK DR · City file - Development application21 211446 WET 07 SBOMB Approved
Proposed Plan of Subdivision application to create 4 blocks and the dedication of a public road connecting Toryork Dr. to the east and the future north-south public road to the west.
Sep 12, 2021 · 15 TORYORK DR · City file - Building permit13 152132Inspection
Interior alterations to create sales office within an existing industrial building for future residential condominium development on the same site.
May 15, 2013 · 19 TORYORK DR - Building permit13 131522Closed
**Development Signs**To erect and display a non-illuminated static copy ground sign at the northerly frontage of the property in conjunction with a new development. **Solmar (Admiral) Inc.**
Apr 23, 2013 · 19 TORYORK DR
Check before you build
Site-specific exception 900.11.10(211)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
City of Toronto by-law 518-2003
- Older by-law B
City of Toronto by-law 422-2003
- Older by-law C
City of Toronto by-law 5-2005.
Lot facts
- Area
- 7,364 m²
- Frontage
- 69.6 mestimated, irregular lot
- Depth
- 124.5 mestimated, irregular lot
- Street
- Toryork Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,186 m²
- Back yard
- 34.7 mhouse to rear lot line
- Side yards
- 6.2 m and 11.9 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Emery. The lot is inside the Emery Major Transit Station Area approved by the Province (Site and Area Specific Policy 701). Source
- Emery Village Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 2.5 (c1.0; r2.5) SS2 (x211) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 6
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the lot for the purpose of a lot addition. A total of three lots will be created in conjunction with Application number B0043/26EYK.
2405 FINCH AVE W · Dec 3, 2026 · 246 m away - Minor variancePending
To construct a new 30-storey apartment building that will contain a total of 396 dwelling units.
2405 FINCH AVE W · Dec 3, 2026 · 246 m away - Building permit
REV 01: Revision to permit (as bubbled)Proposal to legalize existing multiple accessory buildings (temporary prefabricated structures) on the lot
49 TORYORK DR · Nov 20, 2026 · 264 m away - Zoning review
Application On Hold
2347-2349 FINCH AVE W · Nov 18, 2026 · 230 m away - Building permit
Proposed Interior Alteration To A New Retail store
2359-2395 FINCH AVE W · Oct 20, 2026 · 187 m away - Zoning review
Notice Sent
2405 FINCH AVE W · Oct 1, 2026 · 246 m away - Zoning review
Notice Sent
2405 FINCH AVE W · Oct 1, 2026 · 246 m away - Consent (lot split)Pending
Cancelled
2405 FINCH AVE W · Oct 1, 2026 · 246 m away - Consent (lot split)Pending
Cancelled
2405 FINCH AVE W · Oct 1, 2026 · 246 m away - Building permit
Install domestic premise backflows on site
3406-3434 WESTON RD · Aug 17, 2026 · 299 m away
Neighbourhood: Humber Summit
About the area around the lot, not the lot itself.
- Nearest station
- Emery Station3 min walk
- Nearest TTC stop
- Toryork Dr at Weston Rd1 min walk
- Nearest cycling route
- Humber River Recreational Trl extensionMulti-Use Trail, 9 min walk
- Nearest traffic count
- 19,847 vehicles in 14 hWeston Rd / Toryork Dr, 100 m away, Nov 12, 2024
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Lindylou Park4 min walk
- West Humber Parkland9 min walk
- Lanyard Park10 min walk
Schools within 1 km
- EMERY C.I. & EMERY EDVANCE ADULT LEARNING CENTRE English Public 9 min walk
- DAYSTROM PUBLIC SCHOOL English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Humber Summit | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 72% | 54% |
| Population (2021) | 12,185 | 16,813 |
| Homes built in 1960 or before | 16% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Humber Summit | City median |
|---|---|---|
| Assault | 1031.8 | 636.3 |
| Robbery | 191.1 | 69.5 |
| Shootings | 30.6 | 10.5 |
| Auto theft | 672.6 | 192.6 |
| Theft over $5,000 | 191.1 | 46.1 |
| Break and enter | 397.4 | 172.8 |
| Theft from vehicles | 282.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.