HousePrecheckCheck an address

19 Carr Street CrtToronto · zoning, lot size and permit records

Also 11 Carr Street Crt, 13 Carr Street Crt, 15 Carr Street Crt, 17 Carr Street Crt, 1 Carr Street Crt and 25 more

Residential · R (d1.0) (x853)100.9 × 67.2 m5,990 m²on Carr Street Crtbacks onto Ln E Ryerson N Wolseley

Not a single house

Several homes on one parcel

31 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 31 homes on one parcel of 0.6 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelRecent records on this lot: 25 236709 (Proposed door replacement work at 3rd floor at south and north terraces with new insula..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N50 m
100.9 m frontage67.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 19 135013 (Proposal for the installation of new metal siding on existing apartment building 19 + 3..., 2019, status Permit Issued); 05 119390 (replace fire alarm control panel, 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 25 202505 PRS 00 IR (Property Standards, 2025); 25 183154 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 236709 (Proposed door replacement work at 3rd floor at south and north terraces with new insula..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 130870Closed

    Proposal for railing replacement and re-roofing work on south terrace.

    May 8, 2026 · 1-39 CARR STREET CRT
  • Building permit25 236709Permit Issued

    Proposed door replacement work at 3rd floor at south and north terraces with new insulated metal door and vinyl sidelites

    Nov 26, 2025 · 19 CARR STREET CRT
  • Zoning review25 224327 ZPRCancelled
    Sep 11, 2025 · 1-39 CARR STREET CRT
  • By-law investigation25 202505 PRS 00 IRClosed

    Property Standards

    Jul 30, 2025 · 19 CARR STREET CRT
  • By-law investigation25 183154 PRS 00 IRClosed

    Property Standards

    Jun 24, 2025 · 19 CARR STREET CRT
  • Building permit19 135013Permit Issued

    Proposal for the installation of new metal siding on existing apartment building 19 + 39 Carr Street Crt "Alexandra Park Co-Op"

    Jun 5, 2019 · 39 CARR STREET CRT
  • Building permit12 164319Closed

    permit to update fire alarm panel in units 1-39 Carr St Court - 4 stories.

    May 23, 2012 · 1-39 CARR STREET CRT
  • Building permit09 196132Closed

    Proposal to install 15 metres of helical piers for units 57 and 59 (both single family townhouses).

    Jan 25, 2010 · 19 CARR STREET CRT
Show 5 older records
  • Building permit09 177696Closed

    Aministrative permit for 19 Carr St. Unit 59.

    Oct 26, 2009 · 19 CARR STREET CRT
  • Building permit09 177675Closed

    Strapping 2nd fl, front wall to existing roof joists. Unit 59.Administrative permit for Unit 57 required.MRDD FEES DECLINED

    Oct 26, 2009 · 19 CARR STREET CRT
  • Building permit05 119390Inspection

    replace fire alarm control panel

    Apr 13, 2005 · 39 CARR STREET CRT
  • Building permit04 106659Closed

    Underpinning party wall between units 57 & 59 of rowhouse complex

    Feb 3, 2004 · 19 CARR STREET CRT
  • Building permit99 108324Closed

    construct wire mesh enclosure at entranceway in underground parking garage for security purposes.

    Jan 14, 2000 · 19 CARR STREET CRT

Check before you build

  • Site-specific exception 900.2.10(853)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(853)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Older by-law A

    Section 12(2) 208 of former City of Toronto By-law 438-86

5 parts for other addresses
  • B On 25 Augusta Ave.: (i) a religious residence may be combined with other permitted uses on the lot ; (ii) a rooming house with no more than 16 rooms providing …
  • B On 91 Augusta Ave., former City of Toronto by-law 60-67
  • C On 165 Grange Ave., former City of Toronto by-law 164-71
  • D On 77 Ryerson Ave., former City of Toronto by-law 163-71
  • E On 20 Vanauley St., former City of Toronto by-law 680-83.
By-law 569-2013, Chapter 900

Lot facts

Area
5,990 m²
Frontage
100.9 m
Depth
67.2 m
Street
Carr Street Crt
Corner lot
No
Public lane
Ln E Ryerson N Wolseley, 81.8 m along it
House footprint
745 m²roof up to 16.4 m
Back yard
42.5 mhouse to rear lot line
Side yards
6.5 m and 32.2 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x853) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: honey locust ruby lace (50 cm), pine, austrian (50 cm), maple, norway (50 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%19 of 20 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
4
Development applications
21

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 91 m away
  • Minor varianceRefused

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the basement and two-short-term bicycle parking spaces in the front yard. Also, there will be a total of twelve residential dwelling units on this lot (nine units within the main dwelling and three units in the ancillary building).

    74 MARKHAM ST · Oct 14, 2026 · 386 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.

    157 WOLSELEY ST · Jul 15, 2026 · 436 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front basement walkout, a front covered porch with stairs, front second and third storey bay windows, a rear ground floor deck with stairs, and a rear third storey rooftop patio. Also, to construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot.

    104 MARKHAM ST · Apr 15, 2026 · 435 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).

    52 PHOEBE ST · Mar 11, 2026 · 480 m away

Latest activity nearby

  • Minor variancePending

    To permit and to maintain the conversion of two three-bedroom dwelling units into two-bedroom dwelling units by removing one bedroom from the ground floor of each unit within the existing mixed-use residential development.

    115 DENISON AVE · Dec 16, 2026 · 285 m away
  • Zoning review

    Application On Hold

    113 WOLSELEY ST · Nov 27, 2026 · 299 m away
  • Zoning review

    Closed

    474 QUEEN ST W · Nov 9, 2026 · 160 m away
  • Building permit

    1 Wall Sign*****Mark Health Network*****

    575 QUEEN ST W · Nov 5, 2026 · 183 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 91 m away
  • Building permit

    INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR & MEZZANINE LEVEL GROUP A-2 EATING ESTABLISHMENT ('DEAR GRAIN')

    511 RICHMOND ST W · Nov 4, 2026 · 275 m away
  • Zoning review

    Closed

    588 RICHMOND ST W · Oct 29, 2026 · 246 m away
  • Building permit

    Repair of the existing detached wood-frame garage at the rear of the lot (32 Augusta Avenue), replacing deteriorated wall studs, plates, roof joists, roof deck, roofing, cladding and lane doors in kind. No addition, no demolition, no change of use, no change to the footprint or height.

    32 AUGUSTA AVE · Oct 19, 2026 · 112 m away
  • Zoning review

    Closed

    588 RICHMOND ST W · Oct 14, 2026 · 246 m away
  • Zoning review

    Application Acceptable

    590 RICHMOND ST W · Oct 14, 2026 · 252 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Osgoode Station20 min walk
Nearest TTC stop
Queen St West at Augusta Ave3 min walk
Nearest cycling route
Denison AveBike Lane - Contraflow, 1 min walk
Nearest traffic count
1,063 vehicles in 8 hDenison Ave / Carr St / Randy Padmore Park Trl, 70 m away, Jun 7, 2023
Serious collisions within 500 m
132021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 3 with cyclists
Parks
Randy Padmore Park1 min walk
Alexandra Park2 min walk
ALEX WILSON COMMUNITY GARDEN - Open Green Space3 min walk

Schools within 1 km

  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 4 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 8 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 9 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 10 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.