Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
7 development applications open within 300 m
Good to know7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation25 265104 WST 00 IRClosed
Waste
Dec 11, 2025 · 19 BARBERRY PL - By-law investigation25 246933 WST 00 IRClosed
Waste
Oct 30, 2025 · 19 BARBERRY PL - By-law investigation25 220856 LGW 00 IRClosed
Long Grass and Weeds
Sep 5, 2025 · 19 BARBERRY PL - Building permit18 245046Closed
Proposal for the replacement of kitec piping, 129 suites.
Nov 7, 2018 · 19 BARBERRY PL - Building permit17 260823Closed
Proposal to install one backflow prevention device.
Nov 21, 2017 · 19 BARBERRY PL - Zoning review07 205812 ZSVClosedMay 10, 2007 · 19 BARBERRY PL
- Zoning review03 173565 PLOClosedSep 10, 2003 · 19 BARBERRY PL
- Building permit02 138794Closed
TO CONSTRUCT A NEW 8 STOREY RESIDENTIAL BUILDING WITH 130 UNITS AND 2 LEVELS OF UNDERGROUND PARKING. FOUNDATION PERMIT NO. 02-138800, EXCAVATION/SHORING PERMIT NO. 02-138807.
Jul 10, 2003 · 19 BARBERRY PL
Show 5 older records
- Building permit02 138800Closed
INSTALL INSIDE UNDERGROUND DRAINS ONLY :REFER TO FOUNDATION PERMIT FOR AN 8 STOREY RESIDENTIAL BUILDING WITH 2 LEVELS OF UNDERGROUND PARKING. SUPERSTRUCTURE PERMIT NO. 02-02-138794, EXCAVATION/SHORING PERMIT NO. 02-138807. - Partial Permit - Foundation
Feb 17, 2003 · 19 BARBERRY PL - Building permit03 104028Cancelled
UNDERGROUND DRAINS
Jan 23, 2003 · 19 BARBERRY PL - Building permit02 138807Closed
PARTIAL PERMIT FOR SHORING/EXCAVATION FOR NEW 8 STOREY RESIDENTIAL BUILDING WITH 130 UNITS AND TWO LEVELS OF UNDERGROUND PARKING. SUPERSTRUCTURE PERMIT NO. 01-138794, FOUNDATION PERMIT NO. 02-138800.
Jan 15, 2003 · 19 BARBERRY PL - Zoning review02 115845 PSPCancelledMar 5, 2002 · 19 BARBERRY PL
- Building permit00 347735Closed
DEMOLITION OF EXISTING BUILDING
Oct 23, 2000 · 19 BARBERRY PL
Check before you build
Site-specific exception 900.7.10(115)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
City of Toronto by-law 461-2002.
Lot facts
- Area
- 3,213 m²
- Frontage
- 53.1 m
- Depth
- 69.5 m
- Street
- Kenaston Gdns
- Corner lot
- Yes, also on Barberry Pl69.5 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- 35%
- Major Transit Station Area: Bayview. The lot is inside the Bayview Major Transit Station Area approved by the Province (Site and Area Specific Policy 728). Source
- Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Minimum frontage 30 m. Frontage is about 53.1 m: meets the zone minimum. Source
- Minimum lot area 1375 m². Lot area is 3,213 m²: meets the minimum. Source
- Zone RA (f30.0; a1375) (x115) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
- 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: linden, littleleaf (23 cm), linden, littleleaf (21 cm), linden, littleleaf (21 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 12
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the three existing apartment buildings by convertung the existing storage and common areas on the ground floors into dwelling units. A total of four additional one-bedroom dwelling units are proposed (two dwelling units at 640 Sheppard Ave. E., one dwelling unit at 642 Sheppard Ave. E. and one dwelling unit at 644 Sheppard Ave. E.).
640-644 SHEPPARD AVE E · May 21, 2026 · 318 m away - Minor varianceApproved
Proposal to construct an exterior elevation addition, roof terrace renovations, and interior alterations t the existing building, to convert 16 Assisted Living Suites to 21 Memory Care Suites, add an elevator, covert a portion of the existing third floor terrace into a three season room, and adjust parking ratios. Please note, the application was deferred on February 16, 2023, to allow the applicant to address Transportation concerns.
15 BARBERRY PL · Oct 12, 2023 · 78 m away - Minor varianceApproved
To construct a new storage room in the underground parking
15 BARBERRY PL · Apr 1, 2021 · 78 m away
Latest activity nearby
- Minor variancePending
Accepted
2810 BAYVIEW AVE · Nov 20, 2026 · 286 m away - Building permit
1 Wall Sign*****NL NOOHI LAW*****
595 SHEPPARD AVE E · Jun 17, 2026 · 172 m away - Building permit
Proposal to construct a 44 storey market rental tower with 3 levels of below grade parking. Rental unit count is 477. See also 25-180089 SA
2810 BAYVIEW AVE · May 12, 2026 · 286 m away - Minor varianceApproved with conditions
To permit a reduction in the long-term and short- term bicycle parking requirements, related to the development of a new residential building on the subject site.
2810 BAYVIEW AVE · Apr 16, 2026 · 286 m away - Building permit
Proposal for the drilling of geothermal low-carbon energy system consisting of 87 boreholes. Planned drilling start date is April 2026 - application for a Geothermal Drilling Permit for the Multi-Res Rental located at 2810-2816 Bayview Ave.
2810 BAYVIEW AVE · Mar 30, 2026 · 286 m away - Zoning review
Cancelled
18 KENASTON GDNS · Mar 3, 2026 · 106 m away - Zoning review
Closed
630 SHEPPARD AVE E · Feb 23, 2026 · 272 m away - Building permit
1 wall sign as per Signage Master Plan 2021 116011 ZMP 00 ZR.**SPEECH THERAPY**
595 SHEPPARD AVE E · Feb 3, 2026 · 172 m away - Zoning review
Closed
2810 BAYVIEW AVE · Jan 9, 2026 · 286 m away - Zoning review
Under Review
595 SHEPPARD AVE E · Dec 23, 2025 · 172 m away
Neighbourhood: Bayview Village
About the area around the lot, not the lot itself.
- Nearest station
- Bayview Station4 min walk
- Nearest TTC stop
- Sheppard Ave East at Barberry Pl2 min walk
- Nearest cycling route
- Sheppard Ave ECycle Track, 7 min walk
- Nearest traffic count
- 26,682 vehicles in 14 hSheppard Ave E / Barberry Pl, 150 m away, Mar 1, 2025
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- Kenaston Gardens Parkette2 min walk
- Kenaston Park2 min walk
- Rean Drive Parkette2 min walk
Schools within 1 km
- ST GEORGE ACADEMY Private 3 min walk
- NORTH YORK LINC English Public 9 min walk
- ST GABRIEL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- ELKHORN PUBLIC SCHOOL English Public 11 min walk
- HOLLYWOOD PUBLIC SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bayview Village | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $83,000 | $84,500 |
| Households that own their home | 60% | 54% |
| Population (2021) | 22,330 | 16,813 |
| Homes built in 1960 or before | 10% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bayview Village | City median |
|---|---|---|
| Assault | 439.5 | 636.3 |
| Robbery | 56.6 | 69.5 |
| Auto theft | 139.8 | 192.6 |
| Theft over $5,000 | 49.9 | 46.1 |
| Break and enter | 176.4 | 172.8 |
| Theft from vehicles | 169.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.