HousePrecheckCheck an address

18A Hazelton AveToronto · zoning, lot size and permit records

Also 55A Avenue Rd

≈ 63.0 × 102.1 m4,521 m²on Hazelton Avecorner, also on Lowther Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 23 223687 (Proposal for interior alteration - adding plumbing fixtures, 2024, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 63.0 m frontage≈ 102.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 23 223687 (Proposal for interior alteration - adding plumbing fixtures, 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit23 223687Inspection

    Proposal for interior alteration - adding plumbing fixtures

    Jan 9, 2024 · 55 A AVENUE RD
  • Building permit14 227266Closed

    HVAC - Interior alterations to the upper and lower lobby of existing building

    Oct 15, 2014 · 55 A AVENUE RD
  • Development application12 253938 STE 27 SAClosed

    Site Plan Approval Application to permit the renovation of the exterior and interior of the first three levels of the existing building on site. Included in the proposal is the addition of 50m2 of residential gross floor area and 740m2 of non-residential gross floor area.

    Sep 26, 2012 · 55 A AVENUE RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,521 m²
Frontage
63 mestimated, irregular lot
Depth
102.1 mestimated, irregular lot
Street
Hazelton Ave
Corner lot
Yes, also on Lowther Ave102.1 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    88%53 of 60 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    5
    Development applications
    19

    Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 60 variance decisions: more than at 92% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

      1235 BAY ST · Oct 14, 2026 · 354 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).

      131 DAVENPORT RD · Oct 7, 2026 · 368 m away
    • Minor varianceApproved

      To alter the development standards for the mixed-use building (as approved under Site Specific Zoning By-law 687-2021 (amended under City Wide Zoning By-law 569-2013)), by increasing the height of certain roof elements by 0.8 metres, and increasing the non-residential and residential gross floor areas. The overall building height (including the mechanical penthouse) will be 143.2 m. There will be a total of 323 rental residential dwelling units on this lot.

      33 AVENUE RD · Sep 23, 2026 · 72 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey rooftop deck.

      13 ADMIRAL RD · Aug 12, 2026 · 448 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (enclose a portion of the existing rear third storey rooftop deck into habitable space).

      32 TRANBY AVE · Aug 5, 2026 · 352 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      153 BLOOR ST W · Nov 24, 2026 · 298 m away
    • Building permit

      REVISION - conflicts with the existing building services that necessitated the relocation of the proposed washroomsRemove, relocate and reconfigure interior non loading partitions, adjust hvac, lighting and plumbing to suit new layout.

      100 BLOOR ST W · Nov 24, 2026 · 291 m away
    • Zoning review

      Not Started

      150 BLOOR ST W · Nov 19, 2026 · 230 m away
    • Building permit

      Proposed interior alterations to ground-floor Suite 103 for Delysees restaurant (Group A-2), including partitions, fire separations, washrooms, structural partition framing, HVAC and plumbing.

      151 BLOOR ST W · Nov 19, 2026 · 299 m away
    • Building permit

      Proposal for fire alarm system panel repair (Edwards EST3 to EST4)

      118 YORKVILLE AVE · Nov 10, 2026 · 60 m away
    • Building permit

      Addition of new exterior door, construction of new interior partition, reinstallation of interior metal cornertrim piece.

      170 BLOOR ST W · Nov 9, 2026 · 275 m away
    • Building permit

      2 wall signs + 1 projecting sign**DOLCE VITA**

      83 YORKVILLE AVE · Nov 6, 2026 · 200 m away
    • Building permit

      Proposal to remove existing sprinklers as required, supply and install up to sixteen (16) new upright sprinklers, supply and install up to one hundred and eight (108) new concealed sprinklers c/w white cover plates, and supply and install up to three new 10lbs ABC rated standard dry chemical fire extinguishers c/w wall mounting brackets.

      100 BLOOR ST W · Nov 4, 2026 · 291 m away
    • Building permit

      Proposed fire alarm panel replacement

      157 BLOOR ST W · Nov 4, 2026 · 295 m away
    • Zoning review

      Closed

      122 CUMBERLAND ST · Oct 30, 2026 · 194 m away

    Neighbourhood: Annex

    About the area around the lot, not the lot itself.

    Nearest station
    Bay Station6 min walk
    Nearest TTC stop
    Avenue Rd at Elgin Ave3 min walk
    Nearest cycling route
    Avenue RdCycle Track, 1 min walk
    Nearest traffic count
    1,174 vehicles in 8 hHazelton Ave / Scollard St, 60 m away, May 3, 2012
    Serious collisions within 500 m
    112021–2026, killed or seriously injured: 3 fatal, 6 with pedestrians, 2 with cyclists
    Parks
    Village of Yorkville Park3 min walk
    Boswell Parkette3 min walk
    Jesse Ketchum Park4 min walk

    Schools within 1 km

    • CAREER QUEST - TORONTO Private 1 min walk
    • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 4 min walk
    • ROSEDALE DAY SCHOOL Private 5 min walk
    • THE SHIRE SCHOOL Private 5 min walk
    • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 8 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureAnnexMedian neighbourhood
    Median household income (2020)$85,000$84,500
    Households that own their home41%54%
    Population (2021)29,30016,813
    Homes built in 1960 or before40%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleAnnexCity median
    Assault1080.9636.3
    Robbery80.569.5
    Homicide5.25.3
    Shootings5.210.5
    Auto theft116.9192.6
    Theft over $5,000114.346.1
    Break and enter387.1172.8
    Theft from vehicles220.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.