HousePrecheckCheck an address

189 Yonge StToronto · zoning, lot size and permit records

Also 156 Victoria St, 158 Victoria St

Commercial residential · CR 7.8 (c4.5; r7.8) SS1 (x1313)≈ 50.9 × 80.5 m2,065 m²on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 24 206319 (Proposal for interior alterations to the 3rd floor of an existing assembly building - "..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 50.9 m frontage≈ 80.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 104630 (PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING, 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 206319 (Proposal for interior alterations to the 3rd floor of an existing assembly building - "..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit24 206319Inspection

    Proposal for interior alterations to the 3rd floor of an existing assembly building - "The Elgin Winter Garden Theatre"

    Aug 11, 2025 · 189 YONGE ST
  • Building permit19 248512Closed

    Proposal to remove temporary interior partitions. Agreement with Ontario Heritage, the owner, is to restore the space to pre-partition condition.

    Jan 16, 2020 · 189 YONGE ST
  • Zoning review19 240243 ZSVClosed
    Oct 23, 2019 · 189 YONGE ST
  • Building permit18 264342Closed

    Proposed interior alterations to existing theatre for temporary partitions to reduce seating

    Jan 8, 2019 · 189 YONGE ST
  • Building permit16 104630Inspection

    PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING

    Feb 18, 2016 · 158 VICTORIA ST
  • Zoning review13 280708 ZSVClosed
    Dec 20, 2013 · 189 YONGE ST
  • Building permit13 221166Closed

    Proposal to erect a temporay stage, 2 platforms, and 2 possible rain tents on Yonge St (in front of the Elgin Theatre) for Canada's Walk of Fame celebration. To be erected on September 20th, 2013 and dismantled on September 21st, 2013.

    Sep 5, 2013 · 189 YONGE ST
  • Building permit11 282905Closed

    Proposal to erect a temp stage and 2 platforms on Yonge St (in front of the Elgin Theatre) for Walk of Fame. Erect and dismantel Sat Oct 1/11.

    Sep 29, 2011 · 189 YONGE ST
Show 3 older records
  • Zoning review07 235096 ZPRClosed
    Jun 21, 2007 · 189 YONGE ST
  • Zoning review90 028083 LTOClosed
    Jan 15, 1990 · 189 YONGE ST
  • Zoning review85 026514 LTOClosed
    Mar 21, 1985 · 189 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(1313)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1313)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , a clinic, club , performing arts studio , police station, art gallery , library, museum , post office, financial institution , personal service shop , pet services , eating establishment , take-out eating establishment , retail store , service shop , custom workshop , artist studio , production studio , software development and processing , retail service , ancillary showroom, publisher/office, auctioneer's premises , entertainment place of assembly and place of assembly are permitted without providing or maintaining parking spaces on the lot

  2. Rule B

    On a lot , residential uses are permitted without providing or maintaining parking spaces on the lot , but must provide the required number of spaces within 300 metres of the lot used for residential use

  3. Rule C

    A non-residential building or mixed use building is permitted without providing the required common outdoor amenity space . [TO: 438-86; 12(1) 431]

  4. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  5. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 258 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
2,065 m²
Frontage
50.9 mestimated, irregular lot
Depth
80.5 mestimated, irregular lot
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
1,992 m²
Back yard
0.1 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
12house, garage, sheds
Max height
61 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 7.8 (c4.5; r7.8) SS1 (x1313) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
32

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 435 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 403 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 388 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 396 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 415 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 243 m away
  • Building permit

    Proposed interior alterations Building, plumbing and HVAC work to tenant space.

    151 YONGE ST · Nov 20, 2026 · 199 m away
  • Building permit

    Revision No.1: New Fire Shutter Window

    30 ADELAIDE ST E · Nov 20, 2026 · 289 m away
  • Building permit

    nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements

    50 RICHMOND ST E · Nov 19, 2026 · 173 m away
  • Building permit

    Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

    30 BOND ST · Nov 19, 2026 · 88 m away
  • Building permit

    7 wall signs***WELL HEALTH MEDICAL CENTRES***

    20 RICHMOND ST E · Nov 16, 2026 · 136 m away
  • Building permit

    Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.

    124 CHURCH ST · Nov 16, 2026 · 270 m away
  • Zoning review

    Closed

    220 YONGE ST · Nov 10, 2026 · 127 m away
  • Zoning review

    Closed

    2 QUEEN ST E · Nov 10, 2026 · 61 m away
  • Building permit

    Revision 01 - Revisions to address clarify structural concerns and complete phase 2 of heating system retrofit.----------------------------------------------------------Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps.

    6 ADELAIDE ST E · Nov 9, 2026 · 295 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
Queen Station2 min walk
Nearest TTC stop
Queen Station - Northbound Platform1 min walk
Nearest cycling route
Shuter StBike Lane, 2 min walk
Nearest traffic count
6,180 vehicles in 14 hQueen St E / Victoria St, 80 m away, Oct 28, 2025
Serious collisions within 500 m
172021–2026, killed or seriously injured: 2 fatal, 11 with pedestrians, 1 with cyclists
Parks
Cloud Gardens3 min walk
Trinity Square4 min walk
45 Dalhousie St Park5 min walk

Schools within 1 km

  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
  • VICTORIA STREET LINC English Public 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.