HousePrecheckCheck an address

188 University AveToronto · zoning, lot size and permit records

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2333)≈ 43.7 × 69.8 m2,017 m²on Adelaide St Wcorner, also on University Ave

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 24 153661 (Proposed partial fifth-floor renovation to existing Hammam Spa room to include new wall..., 2024, status Inspection); 18 232474 (Proposal for 2 maglocks on the 17th floor of existing mixed use building, 2018, status Inspection); 18 207279 (Interior alterations to the P1 underground level for enlarged washrooms/change rooms, 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 17 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 1 open order or by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 20 145683 WNP 00 VI (Order Issued No Permit: Work no permit at Shangri-La Residences. Fire pump room being t..., 2020, status Order Issued).
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 43.7 m frontage≈ 69.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 open order or by-law investigation

    Needs a closer look

    Not resolved in the City's records: 20 145683 WNP 00 VI (Order Issued No Permit: Work no permit at Shangri-La Residences. Fire pump room being t..., 2020, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 24 153661 (Proposed partial fifth-floor renovation to existing Hammam Spa room to include new wall..., 2024, status Inspection); 18 232474 (Proposal for 2 maglocks on the 17th floor of existing mixed use building, 2018, status Inspection); 18 207279 (Interior alterations to the P1 underground level for enlarged washrooms/change rooms, 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 17 development applications open within 300 m

    Good to know

    17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 153661Inspection

    Proposed partial fifth-floor renovation to existing Hammam Spa room to include new walls, and ceilings finishes in common corridors and treatment rooms.

    Jun 27, 2024 · 188 UNIVERSITY AVE
  • Zoning review23 151551 ZAPCancelled
    May 26, 2023 · 188 UNIVERSITY AVE
  • Zoning review22 148753 LTOClosed
    May 19, 2022 · 188 UNIVERSITY AVE
  • Building order20 145683 WNP 00 VIOrder Issued

    Order Issued No Permit: Work no permit at Shangri-La Residences. Fire pump room being turned into an office space without a permit on the 18th floor.

    May 15, 2020 · 180 UNIVERSITY AVE
  • Building permit18 232474Inspection

    Proposal for 2 maglocks on the 17th floor of existing mixed use building

    Oct 11, 2018 · 188 UNIVERSITY AVE
  • Building permit18 207279Inspection

    Interior alterations to the P1 underground level for enlarged washrooms/change rooms.

    Aug 24, 2018 · 188 UNIVERSITY AVE
  • Building permit18 113645Closed

    Proposal for interior alterations to existing restaurant (greater than 30 seats) on the 3rd floor of existing mixed use building. Tenant is Momofuku-Daisho

    Feb 23, 2018 · 188 UNIVERSITY AVE

Check before you build

  • Site-specific exception 900.11.10(2333)

    Needs a closer look

    1 site-specific rule and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2333)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2).

  2. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  5. Older by-law D

    Section 12(2) 208 of former City of Toronto By-law 438-86

  6. Older by-law E

    Section 12(2) 276 of former City of Toronto By-law 438-86

  7. Older by-law Y · diagram area

    On the even numbered addresses 180 to 188 University Ave., 192 and 194 Adelaide St. W., City of Toronto by-law 469-06

22 parts for other addresses
  • F On 77 Adelaide St. W., former City of Toronto by-law 131-78
  • G On 105 Adelaide St. W., 77 Adelaide St. W., 120 King St. W., 130 King St. W., former City of Toronto by-laws 47-80 and 121-80
  • H On 141 Bay St., 45 Bay St., 40 Bay St., 55 Bremner Blvd., 222 Bremner Blvd., 280 Bremner Blvd., the odd numbered addresses of 61-71 Front St. W., 18 Yonge St., …
  • I On 220 Bay St., former City of Toronto by-law 475-91
  • J On 222 Bay St., the odd numbered addresses of 55-77 King St. W., 100 Wellington St. W., former City of Toronto by-law 207-88
  • K On or between the even numbered addresses of 390-394 Bay St., 65 Queen St. W., former City of Toronto by-law 119-68
  • L On 320 Bay St., former City of Toronto by-law 56-87
  • M On 121 King St W., Section 12(2) 135 of former City of Toronto By-law 438-86
  • N On 145R King St. W., the odd numbered addresses of 95-107 Wellington St. W., 70 York St., former City of Toronto by-law 442-88
  • O On 150 King St. W., 75 Simcoe St., former City of Toronto by-law 416-81
  • P On 150 King St W., Section 12(2) 121 of former City of Toronto By-law 438-86
  • Q On 200 King St. W., 71 Simcoe St., 73 Simcoe St., former City of Toronto by-law 417-81
  • R On 200 King St W., Section 12(2) 123 of former City of Toronto By-law 438-86
  • S On the even numbered addresses of 118A-120 Pearl St., 180 University Ave., former City of Toronto by-law 287-90 and Section 12(2) 235 of former City of Toronto …
  • T On 73 Richmond St. W. and 66 Temperance St., City of Toronto by-law 149-02
  • U On the lands municipally known as 75 Simcoe St. in 1981, Section 12(2) 120 and 12(2) 122 of former City of Toronto By-law 438-86
  • V On 1 University Ave., former City of Toronto by-laws 27-83 and 129-83
  • W On 33 University Ave., Section 12(2) 136 of former City of Toronto By-law 438-86
  • X On 155 University Ave., former City of Toronto by-law 283-85
  • Z On 79 Wellington St. W., 85 Wellington St. W., former City of Toronto by-law 318-83
  • AA On the odd numbered addresses of 95-107 Wellington St. W., former City of Toronto by-laws 30-83 and 592-84
  • AB On the even numbered addresses of 150-166 York St., former City of Toronto by-laws 335-80, 522-80, and 107-81.
By-law 569-2013, Chapter 900

Lot facts

Area
2,017 m²
Frontage
43.7 mestimated, irregular lot
Depth
69.8 mestimated, irregular lot
Street
Adelaide St W
Corner lot
Yes, also on University Ave69.8 m along it
Public lane
None
House footprint
1,843 m²
Back yard
0 mhouse to rear lot line
Side yards
0.1 m and 0.9 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
9house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
26

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    121 KING ST W · Jul 8, 2026 · 311 m away
  • Minor varianceApproved

    To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.

    333 QUEEN ST W · Apr 1, 2026 · 464 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 105-2022 (OLT)) for a 47-storey mixed-use building (containing 432 residential dwelling units, retail use on the ground level, and office use on second, third and fourth levels), by reducing the required number of vehicular parking spaces for the residents of this building.

    263 ADELAIDE ST W · Jan 28, 2026 · 306 m away
  • Minor varianceApproved

    To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.

    141 ADELAIDE ST W · Jan 14, 2026 · 153 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1219-2023(OLT) for a 61-storey mixed-use building, by increasing the building height to 67-storeys (223 m), the maximum gross floor area (residential and overall), a wind damper enclosure projection beyond the maximum building height, as well as to reduce the minimum non-residential gross floor area (remove the office uses), and reduce the number of loading spaces. There will be a total of 1,003 residential dwelling units on this lot (including 46 affordable units), subject to review under the related Site Plan Control Application (File 20 22 119164 STE 10 SA).

    100 SIMCOE ST · Sep 10, 2025 · 110 m away

Latest activity nearby

  • Building permit

    Proposed interior demolition back to base, including mechanical and sprinkler work.

    130 KING ST W · Nov 24, 2026 · 250 m away
  • Building permit

    Proposed interior alterations to convert existing storage room to new washroom in existing office suite.

    150 YORK ST · Nov 24, 2026 · 154 m away
  • Building permit

    Proposed Interior build-out and alterations to an existing offices.

    150 KING ST W · Nov 24, 2026 · 194 m away
  • Zoning review

    Closed

    136 SIMCOE ST · Nov 23, 2026 · 77 m away
  • Building permit

    Proposal for interior alterations in existing vacant retail unit for new coffee shop.

    154 UNIVERSITY AVE · Nov 23, 2026 · 96 m away
  • Building permit

    Interior alterations to unit 500

    111 RICHMOND ST W · Nov 23, 2026 · 241 m away
  • Building permit

    Interior Alterations for the New National Bank of Canada Office Tenancy. Construction requires new openings in structural slab for floor monuments, removal and construction of non-fire rated, non-load bearing interior walls, updated finishes and furnishings as per new tenant layout floor plan. Minimal Structural, Mechanical, and Electrical upgrades required. Mechanical work includes replacing existing hot water tank; Structural and Electrical, relocate existing floor monuments in existing slab

    130 KING ST W · Nov 19, 2026 · 250 m away
  • Building permit

    Install wall partitions, ceiling, plumbing & drainage connection to existing. Existing fire protection.

    150 KING ST W · Nov 19, 2026 · 194 m away
  • Building permit

    Proposed new storefront framing and clad the glazed return wall. Consturction does not extend to underside of deck; no fire-resistance rating claimed. Material allowance based on approximately 8-foot boarded height.

    173 KING ST W · Nov 18, 2026 · 205 m away
  • Building permit

    Proposed interior alterations of existing office for new model suite fit-out - UNIT 403

    217 RICHMOND ST W · Nov 18, 2026 · 243 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
Osgoode Station3 min walk
Nearest TTC stop
St Andrew Station - Northbound Platform2 min walk
Nearest cycling route
Simcoe StCycle Track - Contraflow, 1 min walk
Nearest traffic count
12,469 vehicles in 14 hAdelaide St W / Simcoe St, 60 m away, Oct 15, 2025
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 3 with cyclists
Parks
St. Patricks Square6 min walk
Grasett Park7 min walk
Simcoe Park7 min walk

Schools within 1 km

  • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 7 min walk
  • OCAD UNIVERSITY - STUDENT CENTRE University 7 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 9 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 9 min walk
  • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 10 min walk
  • CONTACT ALTERNATIVE SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.