HousePrecheckCheck an address

185 Queens Quay EToronto · zoning, lot size and permit records

Also 185 Queens Quay E, 50 Dockside Dr

36.0 × 67.1 m2,324 m²on Knapp Lanecorner, also on Queens Quay E

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 14 development applications open within 300 m, up to 68 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
36.0 m frontage67.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0135/20TEY (To construct a new 10-storey institutional building (George Brown College) with a child..., 2020); A0621/19TEY (To construct a 10-storey institutional building (George Brown College) with a total of..., 2019); A0255/14TEY (To permit the use of a temporary parking lot until October 31, 2015 for 85 fleet/staff..., 2014).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 68 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 226232 GRA 00 IRClosed

    Graffiti

    Aug 26, 2026 · 185 QUEENS QUAY E
  • Zoning review25 216853 ZPRCancelled
    Aug 27, 2025 · 185 QUEENS QUAY E
  • Building permit24 233897Closed

    A proposal to erect and display 3 Wall Signs, 2 Ground Signs and one Projecting Sign, all displaying static copy.***GEORGE BROWN COLLEGE***

    Mar 11, 2025 · 185 QUEENS QUAY E
  • Zoning review25 101030 ZSVClosed
    Jan 5, 2025 · 185 QUEENS QUAY E
  • Zoning review24 240519 ZPRClosed
    Nov 19, 2024 · 185 QUEENS QUAY E
  • Zoning review24 202823 ZZUClosed
    Aug 23, 2024 · 185 QUEENS QUAY E
  • Zoning review24 151953 ZZUCancelled
    May 21, 2024 · 185 QUEENS QUAY E
  • Building permit24 135642Closed

    Proposal for 3 Mag Locks on level 9 offices

    Apr 17, 2024 · 185 QUEENS QUAY E
Show 14 older records
  • Building permit20 192670Closednew building

    Rev 01 - Interior fit out to Level 9 and 10 Proposed to construct a new 10 storey Mass Timber College Academic Building with 1 level below grade - BLOCK 3(GBC) and Bridge/Tunnel connections to Daphne Cockwell Building at 51 Dockside - (See also Permit 20 233276 BLD 00 BA)

    Apr 11, 2024 · 185 QUEENS QUAY E
  • Zoning review19 148811 PSPClosed
    May 26, 2021 · 185 QUEENS QUAY E
  • Building permit21 119385Approved

    The project is for the following; over-sized fire shutters used to maintain floor-to-floor fire separation

    Feb 23, 2021 · 185 QUEENS QUAY E
  • Building permit21 119325Approved

    The project is for solar chimneys that are situated

    Feb 23, 2021 · 185 QUEENS QUAY E
  • Building permit20 194368Cancelled

    The project will include two solar chimneys that are considered as vertical service spaces as they do not contain an occupancy. Accordingly, they are required to be separated from the remainder of the floor area by a 1h fire separation. Without the 1h fire separation, the resultant space interconnects the 2nd to 10th storeys of the building.As the solar chimney spaces are essentially noncombustible voids, and do not contain any services, this Alternative Solution has been prepared using Sentence 3.2.8.1.(1) as the Code reference ¿ that is, treating it as an interconnected floor space required to maintain 1h fire separation between storeys. The required level of performance will be provided on a performance basis, based on an enhanced sprinkler design for the building and fire modelling to demonstrate that a reasonably sized fire will not break the glass and interconnect two or more storeys.

    Sep 16, 2020 · 185 QUEENS QUAY E
  • Building permit20 194358Cancelled

    The building will include at the 4th storey to the 9th storey several two-level interaction / breakout study spaces known as Open Access Study Spaces. The two-level spaces are ¿staggered¿ at each end of the building and would technically be an interconnected floor space of the building. It is proposed to address the interconnected floor space spanning the 4th to 9th storeys of this project by alternative solution which will rely on 0h rated fire separations by means of closures having a 0h rating and designed to meet air leakage rating per ANSI/UL-1784 ¿Air Leakage Test¿, coupled with enhanced sprinkler protection within the building.

    Sep 16, 2020 · 185 QUEENS QUAY E
  • Minor varianceA0135/20TEYApproved

    To construct a new 10-storey institutional building (George Brown College) with a child care facility on the ground floor.

    Jun 24, 2020 · 185 QUEENS QUAY E
  • Zoning review19 259966 ZPRClosed
    Dec 11, 2019 · 185 QUEENS QUAY E
  • Minor varianceA0621/19TEYWithdrawn

    To construct a 10-storey institutional building (George Brown College) with a total of 16,959 square metres of gross floor area, and including a child care facility on the ground floor.

    Nov 20, 2019 · 185 QUEENS QUAY E
  • Building permit19 227491Approved

    Alternative Solution for use of mass timber (CLT and Glulam) for 10 Storey educational facility building at George Brown College Waterfront Campus - known as The Arbour.

    Sep 26, 2019 · 185 QUEENS QUAY E
  • Development application19 148811 STE 10 SAClosed

    Proposed 10-storey institutional building: 17414square metres total GFA, including a child care facility on the ground floor (approximately 731 square metres).

    May 3, 2019 · 185 QUEENS QUAY E · City file
  • Zoning review19 144794 ZPRClosed
    Apr 25, 2019 · 185 QUEENS QUAY E
  • Zoning review18 179885 ZPRClosed
    Jun 18, 2018 · 185 QUEENS QUAY E
  • Minor varianceA0255/14TEYApproved

    To permit the use of a temporary parking lot until October 31, 2015 for 85 fleet/staff vehicles associated with the 2015 Pan Am/Parapan Am Games.

    May 14, 2014 · 185 QUEENS QUAY E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,324 m²
Frontage
36 m
Depth
67.1 m
Street
Knapp Lane
Corner lot
Yes, also on Queens Quay E67.1 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%6 of 6 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    33

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a studio use (temporarily), as space for workshops, classes, and small group training, within the existing two-storey detached building.

      307 LAKE SHORE BLVD E · Nov 26, 2025 · 436 m away
    • Minor varianceApproved

      To alter the development standards for the 21-storey mixed-use building (as approved under Site Specific Zoning By-law 411-2021 (LPAT)) by permitting the increase of the maximum permitted number of compact parking spaces from 19 compact parking spaces to 23 compact parking spaces (including one accessible compact parking space). There will be a total of 463 residential dwelling units on this lot, as well as retail space at-grade, and a total of 190 parking spaces within a 4-level below grade parking garage.

      162 QUEENS QUAY E · Sep 3, 2025 · 150 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.

      100 QUEENS QUAY E · Apr 17, 2024 · 421 m away
    • Minor varianceApproved

      To construct two mixed-use buildings, including two tower elements (22- and 18-storeys) and a 14-storey mid-rise element above a five-storey podium.

      178 QUEENS QUAY E · Jul 21, 2021 · 90 m away
    • Minor varianceApproved

      To construct an 11-storey mixed use building with retail space at-grade, office space above and one level of below-grade parking.

      261 QUEENS QUAY E · Jul 8, 2020 · 325 m away

    Latest activity nearby

    • Zoning review

      Not Started

      1 EDGEWATER DR · Nov 26, 2026 · 184 m away
    • Building permit

      REPLACE THE POWER SUPPLY FOR THREE EXISTING MAG-LOCKS ON THE 7TH FLOOR

      155 QUEENS QUAY E · Nov 18, 2026 · 95 m away
    • Zoning review

      Not Started

      259 LAKE SHORE BLVD E · Nov 3, 2026 · 262 m away
    • Building permit

      Shoring and Excavation for the purpose of remediation

      259 LAKE SHORE BLVD E · Sep 25, 2026 · 262 m away
    • Building permit

      Proposal to erect a 10" x 12" gantry on 9/26/26 for use as our finish line for the Bay Street Rides FAR (Autism Science Foundation). Removal of the structure on 9/27/26

      61 DOCKSIDE DR · Sep 14, 2026 · 62 m away
    • Zoning review

      Closed

      259 LAKE SHORE BLVD E · Sep 4, 2026 · 262 m away
    • Building permit

      Proposed interior alterations to suite 700.

      155 QUEENS QUAY E · Sep 3, 2026 · 95 m away
    • Building permit

      Proposal to install eight (8) electromagnetic locks.

      215 LAKE SHORE BLVD E · Aug 7, 2026 · 147 m away
    • Zoning review

      Closed

      130 QUEENS QUAY E · Jul 23, 2026 · 199 m away
    • Building permit

      Proposal for interior alteration to existing office.

      215 QUEENS QUAY E · Jul 20, 2026 · 125 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station16 min walk
    Nearest TTC stop
    Queens Quay East at Dockside Dr1 min walk
    Nearest cycling route
    Martin Goodman / Waterfront TrlMulti-Use Trail - Boulevard, 1 min walk
    Nearest traffic count
    2,092 vehicles in 14 hKnapp Lane / Dockside Dr, 50 m away, Oct 7, 2025
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 3 fatal, 5 with pedestrians, 4 with cyclists
    Parks
    Sherbourne Common1 min walk
    Water's Edge Promenade2 min walk
    Sugar Beach Park2 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 1 min walk
    • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 8 min walk
    • DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk
    • MARKET LANE JR & SR PUBLIC SCHOOL English Public 10 min walk
    • VOICE INTEGRATIVE PRIVATE SCHOOL Private 13 min walk
    • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.