HousePrecheckCheck an address

185 Parliament StToronto · zoning, lot size and permit records

Also 187 Parliament St, 187 Parliament St, 191 Parliament St

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x156)25.7 × 53.1 m1,353 m²on Parliament Stbacks onto Anna Hilliard Lane

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 189995 (Proposal for installation of 7 Maglocks in stairwell doors to be released on fire, 2025); 24 246309 (Interior alterations of existing office unit, 2025); 24 247125 (Interior alterations of existing office unit, 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.
N20 m
25.7 m frontage53.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 189995 (Proposal for installation of 7 Maglocks in stairwell doors to be released on fire, 2025); 24 246309 (Interior alterations of existing office unit, 2025); 24 247125 (Interior alterations of existing office unit, 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 189995Permit Issued

    Proposal for installation of 7 Maglocks in stairwell doors to be released on fire.

    Jul 10, 2025 · 187 PARLIAMENT ST
  • Building permit24 246309Permit Issued

    Interior alterations of existing office unit

    Feb 10, 2025 · 187 PARLIAMENT ST
  • Building permit24 247125Permit Issued

    Interior alterations of existing office unit

    Dec 11, 2024 · 187 PARLIAMENT ST
  • Building permit18 199590Cancelled

    Conditional Permit - Part Permit - Proposal to construct an 11-storey mixed-use building with retail at grade, office uses on floors 2-5, 29 live-work units on floors 6-10 and an assembly space on floor 11 with 2 levels of below grade parking.

    Nov 7, 2022 · 187 PARLIAMENT ST
  • Building permit19 164482Closeddemolition

    Proposal to demolish the existing 2 storey commercial building. See 18 199590 BLD for propsed mixed use building.

    Aug 24, 2020 · 187 PARLIAMENT ST
  • Zoning review16 268588 PSPClosed
    Sep 28, 2018 · 187 PARLIAMENT ST
  • Building permit18 200180Approved

    Alternative solution to provide 65mm standpipe hose system.

    Jul 26, 2018 · 187 PARLIAMENT ST
  • Zoning review16 268586 POZClosed
    Oct 24, 2017 · 187 PARLIAMENT ST
Show 7 older records
  • Development application16 268586 STE 28 OZClosed

    OPA and Rezoning application to permit an 11-storey (38.9m) mixed-use building with 384 square metres of retail at grade, 6,163 square metres of office uses on floors 2-7 and up to 30 live-work units above. A total of 39 parking spaces are proposed below grade with access via Anna Hilliard Lane (south of Shuter St). The rear of the property is designated Neighbourhoods. The existing buildings would be demolished. This proposal is related to Site Plan Application No. 16 268588 STE 28 SA.

    Dec 19, 2016 · 191 PARLIAMENT ST · City file
  • Development application16 268588 STE 28 SAClosed

    Site Plan Application to permit an 11-storey mixed-use building with 337 square metres of retail at grade, 6,235 square metres of office uses on floors 2-7 and 15 live-work units above. A total of 39 parking spaces are proposed below grade with access via Anna Hilliard Lane. This application is related to OPA and Rezoning Application No. 16 268586 STE 28 OZ.

    Dec 19, 2016 · 191 PARLIAMENT ST · City file
  • Building permit12 133635Closed

    Proposal to install one back flow prevention device.

    Mar 13, 2012 · 191 PARLIAMENT ST
  • Zoning review02 168770 LTOClosed
    Aug 29, 2002 · 191 PARLIAMENT ST
  • Zoning review92 025063 LTOClosed
    Jan 14, 1992 · 187 PARLIAMENT ST
  • Zoning review90 028763 LTOClosed
    Aug 28, 1990 · 187 PARLIAMENT ST
  • Zoning review90 028707 LTOClosed
    Aug 3, 1990 · 187 PARLIAMENT ST

Check before you build

  • Site-specific exception 900.11.10(156)

    Needs a closer look

    17 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(156)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 187-193 Parliament Street, if the requirements of Section 5 and Schedule A of By-law 1186-2018 are complied with, none of the provisions of 40.5.40.70(1)(A), 40.10.40.10(2), 40.10.40.40(1), 600.10, 600.10.10 and 900.11.10(2283) apply to prevent the erection or use of a mixed-use building that complies with

  2. Rule B

    to (Q) below; (B) Despite regulations 5.10.40.70(1) and 40.10.40.70(2), a building or structure must be located entirely within the area delineated by heavy lines shown on Diagram 3 of By-law 1186-2018

  3. Rule C

    Despite clause 40.10.40.60 and (B) above, the following are permitted to encroach into the required building setbacks shown on Diagram 3 of By-law 1186-2018: (i) architectural features, awnings, balconies, balustrades, canopies, cornices, doors, eaves, light fixtures, ornamental elements, parapets, trellises, stairs, stair enclosures, and window sills may encroach to a maximum of 0.3 metres; and (ii) dog run areas, gas meter enclosures, intake grates from parking levels, landscape features, railings, underground garage ramps, ventilation shafts, walls of an underground garage; wheel chair ramps, and associated structures may encroach to a maximum of 2.1 metres

  4. Rule D

    Despite regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 84.50 metres in the year 2017 and the elevation of the highest point of the building or structure

  5. Rule E

    Despite regulation 40.10.40.10(2), no portion of the building may exceed the height in metres specified by the numbers following the symbol "HT" on Diagram 3 of By-law 1186-2018

  6. Rule F

    Despite article 40.5.40.10 and (E) above, the following building elements and structures are permitted to project above the heights shown on Diagram 3 of By-law 1186-2018: (i) fence, green roof elements, landscaping , parapet wall, privacy screen, safety railing, stair enclosures, stairs, terraces and trellises may project a maximum of 1.2 metres; and (ii) elevator shaft, mechanical equipment, enclosed mechanical service areas, acoustic screens, and access ladders may project a maximum of 5.0 metres

  7. Rule G

    Despite regulations 40.10.20.100(45), 150.5.20.1(1) and (6), and section 800.50(345), a home occupation within a dwelling unit : (i) may have employees in the dwelling unit who are not the business operator; and (ii) does not have to be the principal residence of the business operator for the dwelling unit

  8. Rule H

    Despite regulations 40.10.40.1(1): (i) the following uses may be provided in combination with a dwelling unit : office, artist studio , production studio , custom workshop , software development and processing , research and development institute, and personal service shop ; and (ii) a place of assembly may be located above a dwelling unit

  9. Rule I

    Despite regulations 40.10.40.40(1), 40.10.20.100(1) and 40.10.20.100(17) the maximum gross floor area on the lot must not exceed 9,200 square metres, as follows: (i) a maximum of 500 square metres may be for retail store or retail service uses ; and (ii) a maximum of 30 dwelling units are permitted

  10. Rule J

    Despite regulation 40.10.40.50(1), amenity space must be provided as follows: (i) at least 60 square metres of indoor amenity space ; and (ii) at least 60 square metres of outdoor amenity space

  11. Rule K

    Despite regulation 40.10.40.80(2)(B), windows are permitted on Levels 8-10 of the north elevation

  12. Rule L

    Despite regulation 200.5.10.1(1) parking spaces must be provided on the lot in accordance with the following: (i) a minimum of 0.6 parking spaces for each dwelling unit for occupants; (ii) a minimum of 0.1 parking spaces for each dwelling unit for visitors; (iii) a minimum of 0.35 parking spaces for each 100 square metres of gross floor area for office uses; (iv) a minimum of 0.1 parking space for each 100 square metres of gross floor area for retail store or retail service uses; and (v) a minimum of 2.5 parking spaces for each 100 square metres of gross floor area for place of assembly uses

  13. Rule M

    Despite regulations 220.5.10.1(3) and (5), a minimum of two "Type B" and two "Type C" loading spaces must be provided on the lot

  14. Rule N

    Despite clause 40.10.90.40(2), access to a loading space may be provided via Anna Hilliard Lane

  15. Rule O

    Despite clauses 40.10.20.100(8) and 40.10.100.10(2), access to a parking space may be provided via Anna Hilliard Lane, which is not within a CR Zone

  16. Rule P

    Despite regulation 230.5.1.10(8), "short term" bicycle parking spaces may be provided on the City boulevard adjacent to the lot

  17. Rule Q

    Regulation 40.10.50.10(3) with respect to landscaping when abutting a lot in a Residential or Residential Apartment Zoning does not apply.

By-law 569-2013, Chapter 900

Lot facts

Area
1,353 m²
Frontage
25.7 m
Depth
53.1 m
Street
Parliament St
Corner lot
No
Public lane
Anna Hilliard Lane, 13.3 m along it
House footprint
982 m²roof up to 23.6 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Parliament Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x156) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
19

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 354 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 400 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 400 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 479 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.

    244 QUEEN ST E · Mar 11, 2026 · 368 m away

Latest activity nearby

  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 134 m away
  • Zoning review

    Under Review

    339 QUEEN ST E · Nov 6, 2026 · 110 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 188 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 167 m away
  • Building permit

    REVISION - revised drawingsProposed commercial kitchen ventilation system.

    368 QUEEN ST E · Oct 5, 2026 · 54 m away
  • Building permit

    Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

    314 QUEEN ST E · Sep 11, 2026 · 125 m away
  • Building permit

    Proposal to reconstruct the existing garage while maintaining its existing footprint and overall dimensions.

    205 BERKELEY ST · Sep 9, 2026 · 188 m away
  • Building permit

    Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance from Tracy street will be enclosed and the interior configuration of the ground floor which includes 3 residential suites and offices will be reconfigured.

    412 QUEEN ST E · Sep 9, 2026 · 137 m away
  • Building permit

    Proposed interior alterations to existing basement to expand existing medical clinic

    412 QUEEN ST E · Sep 2, 2026 · 137 m away
  • Building permit

    Reconstructing deteriorated deck in the rear yard.

    314 QUEEN ST E · Aug 13, 2026 · 125 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station21 min walk
Nearest TTC stop
Parliament St at Queen St East1 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
15,708 vehicles in 14 hQueen St E / Parliament St, 70 m away, Sep 10, 2025
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Orphan's Green3 min walk
40 Power St Park4 min walk
Ontario Street Parkette5 min walk

Schools within 1 km

  • LIBERTY PREP SCHOOL Private 2 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 9 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.