Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 185 Gerrard St E
185 Gerrard St E is on a 4.8 m by 45.7 m lot on Gerrard St E in Moss Park. The zoning is R. A site-specific exception, 900.2.10(865), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 10 records on this lot since 2014. That is more than at 99% of Toronto houses. In 2026, a Committee of Adjustment application was filed: "To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance…". Status: closed. In 2023, a Committee of Adjustment application was filed: "To construct a new four-storey apartment building with front and rear rooftop decks. this building will contain a total of 28 residential dwelling units". Status: closed. In 2026, a zoning review was filed. Status: closed. Nothing on file is open right now.
Within 300 m, 7 development applications are open (the tallest up to 60 storeys). College station is a 13-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Site-specific exception 900.2.10(865)Moderate
- No permit for a second unit on fileLowFree check
- The back yard may be too tight for a garden suiteLowFree check
- No house on this lot in the City's 3D modelLow
- 7 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-14 | Minor varianceA0633/26TEY | To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot. | Approved | |
| 2026-05-08 | Zoning review26 157634 ZAP | No description on file | Closed | |
| 2025-06-11 | By-law investigation25 204080 LGW 00 IV | Notice Issued Long Grass | Closed | |
| 2025-06-11 | By-law investigation25 175902 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2023-10-04 | Minor varianceA0434/23TEY | To construct a new four-storey apartment building with front and rear rooftop decks. This building will contain a total of 28 residential dwelling units. | Approved | |
| 2022-10-19 | Zoning review22 219052 ZAP | No description on file | Notice Sent | |
| 2019-08-29 | Zoning review19 213585 ZPR | No description on file | Cancelled | |
| 2017-07-18 | Zoning review17 200562 ZPR | No description on file | Closed | |
| 2017-07-18 | Zoning review17 200552 000 | No description on file | Cancelled | |
| 2014-05-21 | Zoning review14 159413 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.2.10(865)
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.2.10(865)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(865)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: needs a closer look
- Laneway suite: needs a closer look
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x865)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Glenholme Pl, 4.6 m along it
- New house permit
- None since 2000
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 7 development applications open within 300 m, up to 60 storeys
- In the College station area
- 21 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
7 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- College StationNearest station13 min walk
- Sherbourne St at Gerrard St EastNearest TTC stop1 min walk
- Gerrard St ENearest cycling route1 min walk
- Le College Francais - Carlton CampusSchool7 min walk
- National Ballet School - Margaret McCain Acedemic CentreSchool7 min walk
- Ecole Elementaire Gabrielle RoySchool8 min walk
- Lord Dufferin Jr & Sr Public SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist