HousePrecheckCheck an address

185 Cherry StToronto · zoning, lot size and permit records

≈ 150.5 × 223.0 m27,809 m²on Cherry St

Not a home

Lease In Agreement Btwn City And Tedco

The City of Toronto's real estate inventory lists Lease In Agreement Btwn City And Tedco here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • Permits or applications open on this parcelRecent records on this lot: 26 226745 (Installation of temporary structures for a temporary one-day outdoor event, including a..., 2026); 26 211765 (Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028)), 2026); 26 212100 (Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tea..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
≈ 150.5 m frontage≈ 223.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (5% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 226745 (Installation of temporary structures for a temporary one-day outdoor event, including a..., 2026); 26 211765 (Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028)), 2026); 26 212100 (Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tea..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0486/08TEY (To construct a new building which is to be used as a recreation centre (Basketball Courts), 2008).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 226745Permit Issued

    Installation of temporary structures for a temporary one-day outdoor event, including a bandstand, viewing decks, and front-of-house platformSet up August 31 and Removal September 11

    Aug 28, 2026 · 185 CHERRY ST
  • Building permit26 211765Permit Issued

    Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028))

    Aug 5, 2026 · 185 CHERRY ST
  • Building permit26 212100Examiner's Notice Sent

    Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tear down Aug. 10, 2026.

    Jul 31, 2026 · 185 CHERRY ST
  • Building permit26 188065Closed

    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform.

    Jun 26, 2026 · 185 CHERRY ST
  • Building permit26 184755Closed

    Construct two temporary structures for Electric Island.Set up June 26, 2026; tear down June 29, 2026.

    Jun 26, 2026 · 185 CHERRY ST
  • Zoning review26 187543 LTOClosed
    Jun 19, 2026 · 185 CHERRY ST
  • Building permit26 187803Cancelled

    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform.

    Jun 19, 2026 · 185 CHERRY ST
  • Building permit26 183308Cancelled

    Proposal to Erect One (1) Temporary Tents: Tents: One (1) - 10x100¿ Frame tent (Cert#15 152028)Install: Wednesday June 24, 2026 .Dismantle: Monday June 29, 2026

    Jun 12, 2026 · 185 CHERRY ST
Show 4 older records
  • Zoning review08 228796 PSPClosed
    Dec 10, 2008 · 185 CHERRY ST
  • Minor varianceA0486/08TEYApproved

    To construct a new building which is to be used as a recreation centre (Basketball Courts).

    May 14, 2008 · 185 CHERRY ST
  • Zoning review07 240204 ZALCancelled
    Jul 6, 2007 · 185 CHERRY ST
  • Building permit92 013529Closed

    ALTER PERMIT 328156 BY EXTENDING THE DATE FOR DISMANTLING TO OCTOBER 31/92. PROVINCIAL INTEREST- ATTN: G. MCELWAIN

    Feb 25, 1992 · 185 CHERRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
27,809 m²
Frontage
150.5 mestimated, irregular lot
Depth
223 mestimated, irregular lot
Street
Cherry St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: ash, green (43 cm), ash, green (40 cm), ash, green (38 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of six years, from June 10 to November 30, annually.

    51 COMMISSIONERS ST · Jan 31, 2017 · 401 m away
  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 5 years, from July 1st to October 31st, annually.

    51 COMMISSIONERS ST · Feb 19, 2014 · 401 m away
  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 3 years, from July 1st to October 31st, annually.

    51 COMMISSIONERS ST · Jun 1, 2011 · 401 m away
  • Minor varianceApproved

    To permit temporary use on the subject lands for entertainment shows by Cirque du Soleil from August 3, 2009 to November 20, 2009.

    51 COMMISSIONERS ST · Apr 8, 2009 · 401 m away
  • Minor varianceApproved

    To construct a new building which is to be used as a recreation centre (Basketball Courts).

    185 CHERRY ST · May 14, 2008 · 25 m away

Latest activity nearby

  • Building permit

    1 Ground Sign***PORSHE***

    190 CHERRY ST · Nov 13, 2026 · 137 m away
  • Building permit

    1 Ground Sign****Porsche****

    190 CHERRY ST · Oct 19, 2026 · 137 m away
  • Zoning review

    Notice Sent

    190 CHERRY ST · Sep 8, 2026 · 137 m away
  • Minor variancePending

    Proposal to reduce the parking requirement for the existing car dealership (Porsche)

    190 CHERRY ST · Sep 8, 2026 · 137 m away
  • Building permit

    Installation of temporary structures for a temporary one-day outdoor event, including a bandstand, viewing decks, and front-of-house platformSet up August 31 and Removal September 11

    185 CHERRY ST · Aug 28, 2026 · 25 m away
  • Building permit

    Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028))

    185 CHERRY ST · Aug 5, 2026 · 25 m away
  • Building permit

    Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tear down Aug. 10, 2026.

    185 CHERRY ST · Jul 31, 2026 · 25 m away
  • Building permit

    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform.

    185 CHERRY ST · Jun 26, 2026 · 25 m away
  • Building permit

    Construct two temporary structures for Electric Island.Set up June 26, 2026; tear down June 29, 2026.

    185 CHERRY ST · Jun 26, 2026 · 25 m away
  • Zoning review

    Closed

    185 CHERRY ST · Jun 19, 2026 · 25 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station37 min walk
Nearest TTC stop
Commissioners St at Munition St6 min walk
Nearest cycling route
Martin Goodman / Waterfront TrlMulti-Use Trail, 2 min walk
Nearest traffic count
5,350 vehicles in 14 hPolson St / Cherry St / Martin Goodman Trl, 140 m away, Oct 6, 2026
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Biidaasige Park2 min walk
Jennifer Kateryna Koval's'kyj Park8 min walk
Cherry Beach Sports Fields9 min walk

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.