HousePrecheckCheck an address

185 Bartley DrToronto · zoning, lot size and permit records

Employment · E 1.0≈ 67.8 × 206.7 m11,687 m²on Bartley Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N50 m
≈ 67.8 m frontage≈ 206.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    10 records on file: more than at 99% of Toronto houses (median 0).

    • Zoning review20 189520 ZPRClosed
      Sep 3, 2020 · 185 BARTLEY DR
    • Building permit15 240675Closed

      Installation of a backflow prevention device

      Nov 6, 2015 · 185 BARTLEY DR
    • Zoning review12 116193 LTOClosed
      Feb 2, 2012 · 185 BARTLEY DR
    • Zoning review08 180177 LTOClosed
      Jul 10, 2008 · 185 BARTLEY DR
    • Zoning review08 160682 LPRClosed
      May 21, 2008 · 185 BARTLEY DR
    • Zoning review03 195698 000Closed
      Nov 25, 2003 · 185 BARTLEY DR
    • Zoning review03 105347 LTOClosed
      Jan 30, 2003 · 185 BARTLEY DR
    • Zoning review01 200603 ZPUClosed
      Dec 6, 2001 · 185 BARTLEY DR
    Show 2 older records
    • Building permit98 092409Closed

      HVAC

      Mar 2, 1999 · 185 BARTLEY DR
    • Building permit98 089284Closed

      INTERIOR OF CHURCH

      Dec 25, 1998 · 185 BARTLEY DR

    Lot facts

    Area
    11,687 m²
    Frontage
    67.8 mestimated, irregular lot
    Depth
    206.7 mestimated, irregular lot
    Street
    Bartley Dr
    Corner lot
    No
    Public lane
    None
    House footprint
    1,584 m²roof up to 6.6 m
    Back yard
    142.5 mhouse to rear lot line
    Side yards
    3.3 m and 20.5 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
    • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: apple, sargents (23 cm), apple, sargents (17 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a reduction in the number of parking spaces provided on the subject property.

      155 BERMONDSEY RD · Mar 26, 2026 · 251 m away

    Latest activity nearby

    • Building permit

      3 wall signs.***MAPLE LEAF SELF STORAGE***

      150 BERMONDSEY RD · Nov 6, 2026 · 292 m away
    • Building permit

      1 wall sign**SIX MOVING**

      179 BARTLEY DR · Oct 22, 2026 · 70 m away
    • Zoning review

      Cancelled

      100 SUNRISE AVE · Oct 16, 2026 · 288 m away
    • Building permit

      3 wall signs.***MAPLE LEAF SELF STORAGE***

      150 BERMONDSEY RD · Oct 14, 2026 · 292 m away
    • Building permit

      1 Wall Sign ** BUILD FACTORY **

      155 BERMONDSEY RD · Aug 19, 2026 · 251 m away
    • Building permit

      Change of Use Only - No proposed construction or interior alterations.

      100 SUNRISE AVE · Aug 11, 2026 · 288 m away
    • Zoning review

      Closed

      161 BARTLEY DR · Jun 10, 2026 · 210 m away
    • Minor varianceApproved

      To permit a reduction in the number of parking spaces provided on the subject property.

      155 BERMONDSEY RD · Mar 26, 2026 · 251 m away
    • Zoning review

      Closed

      100 SUNRISE AVE · Mar 11, 2026 · 288 m away
    • Building permit

      Proposed interior alterations, removal of existing office spaces and addition of one new internal office for new tenant.

      179 BARTLEY DR · Feb 12, 2026 · 70 m away

    Neighbourhood: Victoria Village

    About the area around the lot, not the lot itself.

    Nearest station
    Sloane Station10 min walk
    Nearest TTC stop
    Bermondsey Rd at Bartley Dr3 min walk
    Nearest cycling route
    Bermondsey RdSigned Route (No Pavement Markings), 3 min walk
    Nearest traffic count
    10,212 vehicles in 8 hBermondsey Rd / Bartley Dr, 220 m away, Feb 8, 2022
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Academy Soccer Field4 min walk
    Charles Sauriol Conservation Area5 min walk
    Bartley Park6 min walk

    Schools within 1 km

    • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 6 min walk
    • O'CONNOR PUBLIC SCHOOL English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureVictoria VillageMedian neighbourhood
    Median household income (2020)$68,000$84,500
    Households that own their home41%54%
    Population (2021)17,36516,813
    Homes built in 1960 or before29%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleVictoria VillageCity median
    Assault591.2636.3
    Robbery20.469.5
    Auto theft285.4192.6
    Theft over $5,00030.646.1
    Break and enter208.9172.8
    Theft from vehicles178.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.