HousePrecheckCheck an address

180 Sackville StToronto · zoning, lot size and permit records

Also 10 Sutton Ave, 12 Sutton Ave, 14 Sutton Ave, 16 Sutton Ave, 170 Sackville St and 18 more

49.5 × 107.6 m5,305 m²on Sackville Stcorner, also on Sutton Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 9 storeys, 83 rental units, built 2015More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 13 149408 (Revise graound floor framing from wood to concrete. This revision applies to 13 149408..., 2014, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
49.5 m frontage107.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 13 149408 (Revise graound floor framing from wood to concrete. This revision applies to 13 149408..., 2014, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 172203 000 00 IR (Adequate Heat, 2026); 26 172202 000 00 IR (Property Standards, 2026); 25 212481 PRS 00 IR (Property Standards, 2025); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (9 storeys, 83 units, built 2015).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 172203 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 180 SACKVILLE ST
  • By-law investigation26 172202 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 180 SACKVILLE ST
  • By-law investigation25 212481 PRS 00 IRClosed

    Property Standards

    Aug 18, 2025 · 180 SACKVILLE ST
  • By-law investigation25 199359 PRS 00 IRClosed

    Property Standards

    Jul 24, 2025 · 180 SACKVILLE ST
  • By-law investigation25 182447 PRS 00 IRClosed

    Property Standards

    Jun 23, 2025 · 180 SACKVILLE ST
  • By-law investigation25 178355 PRS 00 IRClosed

    Property Standards

    Jun 16, 2025 · 180 SACKVILLE ST
  • By-law investigation25 100143 HEA 00 IRClosed

    Adequate Heat

    Jan 2, 2025 · 180 SACKVILLE ST
  • Zoning review18 178283 ZZUClosed
    Jun 14, 2018 · 23 REGENT ST
Show 2 older records
  • Building permit13 149408Revision Issuednew building, new house

    Revise graound floor framing from wood to concrete. This revision applies to 13 149408 B01-B16 and 13 149413 B01- B16. See individual revisions for all.

    Jan 6, 2014 · 180 SACKVILLE ST
  • Development application12 188343 STE 28 SAClosed

    REGENT PARK - BLOCK 22 Phase 2 - TCHC Rental Replacement Units (118 units)- Site plan approval application for 3 buildings - Buildings and A and B are 3 storey townhouses - each building 16 units - 32 units in total - Building C 11 storey building - 1 level below grade parkling - 86 units - 36 spaces

    Jun 7, 2012 · 180 SACKVILLE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
5,305 m²
Frontage
49.5 m
Depth
107.6 m
Street
Sackville St
Corner lot
Yes, also on Sutton Ave107.6 m along it
Public lane
None
House footprint
818 m²roof up to 12.2 m
Back yard
1.6 mhouse to rear lot line
Side yards
2.1 m and 30.6 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    75%12 of 16 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    15

    Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

      325 GERRARD ST E · Oct 1, 2025 · 447 m away
    • Minor varianceApproved

      To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

      90 SUMACH ST · Jan 8, 2025 · 281 m away
    • Minor varianceRefused

      To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.

      90 SUMACH ST · Aug 14, 2024 · 281 m away
    • Minor varianceApproved

      To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.

      83 RIVER ST · Aug 14, 2024 · 495 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for a new 14-storey mixed-use building, by increasing the gross floor area, and building height.

      401 DUNDAS ST E · Jun 19, 2024 · 363 m away

    Latest activity nearby

    • Zoning review

      Not Started

      290 SHUTER ST · Nov 17, 2026 · 251 m away
    • Building permit

      Proposal to install new smoke alarms and monitoring modules to provide individual suite nnunciation on the fire alarm system.

      146 SUMACH ST · Oct 30, 2026 · 260 m away
    • Zoning review

      Under Review

      20 REGENT ST · Oct 27, 2026 · 96 m away
    • Zoning review

      Closed

      234 PARLIAMENT ST · Oct 8, 2026 · 226 m away
    • Building permit

      REVISION - revised drawingsProposed commercial kitchen ventilation system.

      368 QUEEN ST E · Oct 5, 2026 · 277 m away
    • Building permit

      Proposal to reconstruct the existing garage while maintaining its existing footprint and overall dimensions.

      205 BERKELEY ST · Sep 9, 2026 · 288 m away
    • Building permit

      Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance from Tracy street will be enclosed and the interior configuration of the ground floor which includes 3 residential suites and offices will be reconfigured.

      412 QUEEN ST E · Sep 9, 2026 · 239 m away
    • Building permit

      Proposed one maglock to hallway door.

      465 DUNDAS ST E · Sep 4, 2026 · 233 m away
    • Building permit

      Proposed interior alterations to existing basement to expand existing medical clinic

      412 QUEEN ST E · Sep 2, 2026 · 239 m away
    • Building permit

      REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

      585 DUNDAS ST E · Aug 6, 2026 · 214 m away

    Neighbourhood: Regent Park

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station23 min walk
    Nearest TTC stop
    Parliament St at Shuter St4 min walk
    Nearest cycling route
    Shuter StCycle Track, 2 min walk
    Nearest traffic count
    4,244 vehicles in 8 hSackville St / Shuter St, 120 m away, Mar 29, 2022
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
    Parks
    Regent Park Boulevard Park3 min walk
    Regent Park4 min walk
    Regent Park Athletic Grounds5 min walk

    Schools within 1 km

    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 3 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • LIBERTY PREP SCHOOL Private 6 min walk
    • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 7 min walk
    • INGLENOOK COMMUNITY SCHOOL English Public 9 min walk
    • SPRUCECOURT JR PUBLIC SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRegent ParkMedian neighbourhood
    Median household income (2020)$65,500$84,500
    Households that own their home30%54%
    Population (2021)12,75016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRegent ParkCity median
    Assault947.8636.3
    Robbery83.569.5
    Shootings610.5
    Auto theft95.4192.6
    Theft over $5,00011.946.1
    Break and enter166.9172.8
    Theft from vehicles125.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.