HousePrecheckCheck an address

180 Queens Quay EToronto · zoning, lot size and permit records

≈ 37.0 × 76.9 m2,254 m²on Lower Sherbourne Stcorner, also on Queens Quay E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 22 106787 STE 10 OZ (Zoning By-law Amendment Application to lift the "H"" Holding Symbol that currently appl..., 2022); 20 150180 STE 10 SA (Site Plan Approval for two mixed-use buildings including three 15, 18 and 22 storey ele..., 2020); 17 278451 STE 28 SB (INACTIVE Draft Plan of Subdivision application to facilitate dedication of a portion of..., 2017). Larger work can mean noise and trucks next door; read what each one is for.
  • 14 development applications open within 300 m, up to 68 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
≈ 37.0 m frontage≈ 76.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 106787 STE 10 OZ (Zoning By-law Amendment Application to lift the "H"" Holding Symbol that currently appl..., 2022); 20 150180 STE 10 SA (Site Plan Approval for two mixed-use buildings including three 15, 18 and 22 storey ele..., 2020); 17 278451 STE 28 SB (INACTIVE Draft Plan of Subdivision application to facilitate dedication of a portion of..., 2017).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 68 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Development application22 106787 STE 10 OZUnder Review

    Zoning By-law Amendment Application to lift the "H"" Holding Symbol that currently applies to the subject site.

    Jan 24, 2022 · 180 QUEENS QUAY E · City file
  • Development application20 150180 STE 10 SAUnder Review

    Site Plan Approval for two mixed-use buildings including three 15, 18 and 22 storey elements on 5-storey podiums with ground floor retail. The buildings are connected by a proposed mid-block Privately-Owned Publicly Accessibly Space (POPS) and shared underground parking. The proposal includes a total of 41,848 square metres of residential floor area (609 residential units) and 2306 square metres of non-residential gross floor area.

    May 29, 2020 · 180 QUEENS QUAY E · City file
  • Zoning review19 209661 LPRClosed
    Aug 21, 2019 · 180 QUEENS QUAY E
  • Development application17 278451 STE 28 SBDraft Plan Approved

    INACTIVE Draft Plan of Subdivision application to facilitate dedication of a portion of the lands for road widening and realignment

    Dec 21, 2017 · 180 QUEENS QUAY E · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,254 m²
Frontage
37 mestimated, irregular lot
Depth
76.9 mestimated, irregular lot
Street
Lower Sherbourne St
Corner lot
Yes, also on Queens Quay E76.9 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%6 of 6 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    33

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a studio use (temporarily), as space for workshops, classes, and small group training, within the existing two-storey detached building.

      307 LAKE SHORE BLVD E · Nov 26, 2025 · 405 m away
    • Minor varianceApproved

      To alter the development standards for the 21-storey mixed-use building (as approved under Site Specific Zoning By-law 411-2021 (LPAT)) by permitting the increase of the maximum permitted number of compact parking spaces from 19 compact parking spaces to 23 compact parking spaces (including one accessible compact parking space). There will be a total of 463 residential dwelling units on this lot, as well as retail space at-grade, and a total of 190 parking spaces within a 4-level below grade parking garage.

      162 QUEENS QUAY E · Sep 3, 2025 · 136 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.

      100 QUEENS QUAY E · Apr 17, 2024 · 431 m away
    • Minor varianceApproved

      To alter parking level one of the existing mixed-use building by converting four parking spaces into two accessible parking spaces.

      140 THE ESPLANADE · Oct 27, 2021 · 499 m away
    • Minor varianceApproved

      To construct two mixed-use buildings, including two tower elements (22- and 18-storeys) and a 14-storey mid-rise element above a five-storey podium.

      178 QUEENS QUAY E · Jul 21, 2021 · 71 m away

    Latest activity nearby

    • Zoning review

      Not Started

      1 EDGEWATER DR · Nov 26, 2026 · 198 m away
    • Building permit

      REPLACE THE POWER SUPPLY FOR THREE EXISTING MAG-LOCKS ON THE 7TH FLOOR

      155 QUEENS QUAY E · Nov 18, 2026 · 126 m away
    • Zoning review

      Not Started

      259 LAKE SHORE BLVD E · Nov 3, 2026 · 216 m away
    • Building permit

      Shoring and Excavation for the purpose of remediation

      259 LAKE SHORE BLVD E · Sep 25, 2026 · 216 m away
    • Building permit

      Proposal to erect a 10" x 12" gantry on 9/26/26 for use as our finish line for the Bay Street Rides FAR (Autism Science Foundation). Removal of the structure on 9/27/26

      61 DOCKSIDE DR · Sep 14, 2026 · 81 m away
    • Building permit

      Proposed interior alterations to suite 700.

      155 QUEENS QUAY E · Sep 3, 2026 · 126 m away
    • Zoning review

      Closed

      259 LAKE SHORE BLVD E · Sep 2, 2026 · 216 m away
    • Building permit

      Proposal to install eight (8) electromagnetic locks.

      215 LAKE SHORE BLVD E · Aug 7, 2026 · 87 m away
    • Zoning review

      Closed

      130 QUEENS QUAY E · Jul 23, 2026 · 206 m away
    • Building permit

      Proposal for interior alteration to existing office.

      215 QUEENS QUAY E · Jul 20, 2026 · 124 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station16 min walk
    Nearest TTC stop
    Lower Sherbourne St at Queens Quay East1 min walk
    Nearest cycling route
    Lower Sherbourne StCycle Track - Contraflow, 1 min walk
    Nearest traffic count
    11,566 vehicles in 14 hQueens Quay E / Lower Sherbourne St, 50 m away, Jun 5, 2024
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 3 fatal, 5 with pedestrians, 4 with cyclists
    Parks
    Sherbourne Common1 min walk
    Water's Edge Promenade3 min walk
    Sugar Beach Park3 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 2 min walk
    • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
    • DOWNTOWN ALTERNATIVE SCHOOL English Public 7 min walk
    • MARKET LANE JR & SR PUBLIC SCHOOL English Public 9 min walk
    • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 12 min walk
    • VOICE INTEGRATIVE PRIVATE SCHOOL Private 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.