Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterTRCA regulated area (14% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (8% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Natural Heritage System (4% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Lot facts
- Area
- 49,303 m²
- Frontage
- 206 mestimated, irregular lot
- Depth
- 296.7 mestimated, irregular lot
- Street
- McLevin Ave
- Corner lot
- Yes, also on Shepmore Ter296.7 m along it
- Public lane
- None
- House footprint
- 199 m²roof up to 8.6 m
- Back yard
- 261 mhouse to rear lot line
- Side yards
- 63.3 m and 121.9 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal to reinstate the fire-damaged section of the building and repair affected base building components, restoring all impacted units to their pre-loss condition.
150 MCLEVIN AVE · Nov 2, 2026 · 169 m away - Zoning review
Notice Sent
110 LITTLELEAF DR · Jun 15, 2026 · 270 m away - Zoning review
Closed
150 MCLEVIN AVE · May 8, 2026 · 169 m away - Building permit
Proposed new openings in basement.
63 SHEPMORE TER · Nov 27, 2025 · 180 m away - Building permit
Proposed second unit in basement of dwelling
63 SHEPMORE TER · Nov 3, 2025 · 180 m away - Building permit
Proposed structural repairs to wood beam
200 MCLEVIN AVE · Jul 21, 2025 · 271 m away - Zoning review
Closed
370 TAPSCOTT RD · Mar 27, 2025 · 255 m away - Building permit
Proposal to construct an unheated sunroom at the rear of the dwelling.
41 SHEPMORE TER · Jan 8, 2025 · 245 m away - Minor varianceApproved
To construct a rear yard sunroom.
41 SHEPMORE TER · Dec 4, 2024 · 245 m away - Building permit
Repairs tor wood deck/balcony total 46
200 MCLEVIN AVE · Apr 16, 2024 · 271 m away
Neighbourhood: Malvern West
About the area around the lot, not the lot itself.
- Nearest TTC stop
- McLevin Ave at Greenspire Rd3 min walk
- Nearest traffic count
- 10,675 vehicles in 14 hGreenspire Rd / McLevin Ave, 180 m away, Dec 11, 2024
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Major Abbas Ali Park1 min walk
- Tapscott Woodlot5 min walk
- Telfer Park8 min walk
Schools within 1 km
- LESTER B PEARSON COLLEGIATE INSTITUTE English Public 8 min walk
- AL AZHAR ISLAMIC SCHOOL Private 9 min walk
- TAYYIBAH ISLAMIC ACADEMY INC SCHOOL Private 9 min walk
- AL AZHAR ISLAMIC SCHOOL - MAIN OFFICE Private 9 min walk
- DR MARION HILLIARD SR PUBLIC SCHOOL English Public 9 min walk
- TOM LONGBOAT JR PUBLIC SCHOOL English Public 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Malvern West | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $88,000 | $84,500 |
| Households that own their home | 74% | 54% |
| Population (2021) | 17,320 | 16,813 |
| Homes built in 1960 or before | 6% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Malvern West | City median |
|---|---|---|
| Assault | 635 | 636.3 |
| Robbery | 125.9 | 69.5 |
| Shootings | 27.4 | 10.5 |
| Auto theft | 366.8 | 192.6 |
| Theft over $5,000 | 65.7 | 46.1 |
| Break and enter | 43.8 | 172.8 |
| Theft from vehicles | 208 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.