HousePrecheckCheck an address

180 Fallingbrook RdToronto · zoning, lot size and permit records

Open space · OR≈ 126.2 × 285.0 m22,070 m²on Parkview Htscorner, also on Fallingbrook Rd

Not a home

Blantyre Park

The City of Toronto's real estate inventory lists Blantyre Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 105909 (New pool building with washrooms, change rooms and all associated structural, mechanica..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 8 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
≈ 126.2 m frontage≈ 285.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 105909 (New pool building with washrooms, change rooms and all associated structural, mechanica..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 8 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit25 105909Inspectionnew building

    New pool building with washrooms, change rooms and all associated structural, mechanical & electrical work to support outdoor pool.

    Dec 19, 2025 · 180 FALLINGBROOK RD
  • Zoning review24 241292 PSPClosed
    Apr 14, 2025 · 180 FALLINGBROOK RD
  • Development application24 241292 ESC 20 SAClosed

    This project involves the replacement of an existing pool and 74 square metre pool accessory building with a new pool and 246 square metre pool building, including change rooms and washrooms, as well as some landscape improvements to Blantyre Park.

    Nov 20, 2024 · 180 FALLINGBROOK RD · City file
  • Building permit14 257810Closednew building

    Proposed new shade structure in Blantyre Public Park - City of Toronto

    Dec 19, 2014 · 180 FALLINGBROOK RD

Lot facts

Area
22,070 m²
Frontage
126.2 mestimated, irregular lot
Depth
285 mestimated, irregular lot
Street
Parkview Hts
Corner lot
Yes, also on Fallingbrook Rd285 m along it
Public lane
None
House footprint
128 m²roof up to 6.1 m
Back yard
22.4 mhouse to rear lot line
Side yards
54.8 m and 55.4 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: oak, white (80 cm), hackberry (16 cm), hackberry (16 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
87%47 of 54 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
2
Development applications
6

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 54 variance decisions: more than at 88% of Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To construct an enclosed verandah.

    52 WINSTON AVE · Dec 2, 2026 · 245 m away
  • Zoning review

    Application On Hold

    21 PARKVIEW HTS · Nov 25, 2026 · 219 m away
  • Building permit

    Proposed Underpinning and basement interior alteration

    55 BEACHDALE AVE · Nov 24, 2026 · 148 m away
  • Building permit

    Proposal to install backwatervalve and sump pump

    24 NORTHVIEW AVE · Nov 19, 2026 · 245 m away
  • Minor variancePending

    Accepted

    254 BLANTYRE AVE · Nov 17, 2026 · 158 m away
  • Building permit

    Proposal for interior alterations to existing basement.

    1264 KINGSTON RD · Nov 16, 2026 · 258 m away
  • Zoning review

    Application Acceptable

    26 PARKLAND RD · Nov 12, 2026 · 245 m away
  • Zoning review

    Not Started

    26 PARKLAND RD · Nov 12, 2026 · 245 m away
  • Zoning review

    Cancelled

    26 PARKLAND RD · Nov 12, 2026 · 245 m away
  • Building permitnew building, new house

    Proposed two-storey semi-detached, single family dwelling w/ integral garage on an existing vacant lot. Related to Permit 25 154471 BLD 00 NH

    39 MEADOW AVE · Nov 10, 2026 · 205 m away

Neighbourhood: Birchcliffe-Cliffside

About the area around the lot, not the lot itself.

Nearest station
Victoria Park Station22 min walk
Nearest TTC stop
Kingston Rd at Fallingbrook Rd2 min walk
Nearest cycling route
Fallingbrook RdSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
1,399 vehicles in 8 hBeachdale Ave / Blantyre Ave, 130 m away, May 23, 2006
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Blantyre Park1 min walk
Lynndale Parkette6 min walk
Neville Park Blvd Ravine9 min walk

Schools within 1 km

  • BLANTYRE PUBLIC SCHOOL English Public 5 min walk
  • COURCELETTE PUBLIC SCHOOL English Public 8 min walk
  • NEIL MCNEIL CATHOLIC HIGH SCHOOL English Separate 8 min walk
  • ADAM BECK JR PUBLIC SCHOOL English Public 10 min walk
  • BEACHES MONTESSORI Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBirchcliffe-CliffsideMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home66%54%
Population (2021)22,70016,813
Homes built in 1960 or before57%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBirchcliffe-CliffsideCity median
Assault648.5636.3
Robbery73.369.5
Auto theft266.4192.6
Theft over $5,00034.746.1
Break and enter181.4172.8
Theft from vehicles277.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.