HousePrecheckCheck an address

18 Ourland AveToronto · zoning, lot size and permit records

Also 36 Ourland Ave, 771 Islington Ave

Open space · OR≈ 128.3 × 347.1 m34,861 m²on Alden Avecorner, also on Ourland Ave

Not a home

Ourland Recreation Centre

The City of Toronto's real estate inventory lists Ourland Recreation Centre here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 128.3 m frontage≈ 347.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit02 167380Closed

      HVAC - Renovation & addition to existing community centre. - Multiple Projects

      Jan 17, 2003 · 18 OURLAND AVE

    Lot facts

    Area
    34,861 m²
    Frontage
    128.3 mestimated, irregular lot
    Depth
    347.1 mestimated, irregular lot
    Street
    Alden Ave
    Corner lot
    Yes, also on Ourland Ave347.1 m along it
    Public lane
    None
    House footprint
    1,416 m²roof up to 9.5 m
    Back yard
    180.2 mhouse to rear lot line
    Side yards
    37 m and 38.4 mhouse to side lot lines
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
    • 21 City trees in front of this lot. The City's street tree inventory lists 21 trees at this address: elm, american (105 cm), olive, russian (55 cm), linden, littleleaf (50 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%11 of 11 decisions
    Garden suite permits
    2
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    0

    Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Zoning review

      Closed

      35 OURLAND AVE · Jul 23, 2026 · 111 m away
    • Building permitdemolition

      Proposal to demolish existing building, sever lot and construct a new single family detached dwelling (Part 1)

      150 SIMPSON AVE · Jun 24, 2026 · 244 m away
    • Building permit

      Drain - Proposal to demolish existing building, sever lot and construct a new detached single family dwelling (Part 2).

      150 SIMPSON AVE · Jun 24, 2026 · 244 m away
    • Building permit

      Drain - Proposal to demolish existing building, sever lot and construct a new detached single family dwelling (Part 1).

      150 SIMPSON AVE · Jun 22, 2026 · 244 m away
    • Building permitgarden suite, multiplex

      Proposal for garden suite at rear of property.Main dwelling will be a fourplex (25 245185 BLD 00 NH).

      166 HAY AVE · Apr 1, 2026 · 279 m away
    • Building permitdemolition

      Proposed demolition of existing SFD detached dwelling to construct new 4 unit detached dwelling.

      166 HAY AVE · Feb 5, 2026 · 279 m away
    • Building permit

      Proposed rear side ground and second floor addition and interior alterations.

      16 ALDEN AVE · Jan 6, 2026 · 248 m away
    • Building permitgarden suite, multiplex, new building, new house

      Proposal to demolish existing single family dwelling and construct a new three storey four unit Houseplex, with 2 front main floor entry porches, 1 Rear main floor entry porch + Front and Rear 3rd floor balconies.Rear yard garden suite (25 245185 BLD 00 NH).

      166 HAY AVE · Dec 24, 2025 · 279 m away
    • Consent (lot split)Approved

      To obtain consent to sever the property into two undersized residential lots.

      150 SIMPSON AVE · Nov 6, 2025 · 244 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      150 SIMPSON AVE · Nov 6, 2025 · 244 m away

    Neighbourhood: Mimico-Queensway

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station13 min walk
    Nearest TTC stop
    Islington Ave at Judson St North Side3 min walk
    Nearest cycling route
    Royal York RdBike Lane, 13 min walk
    Nearest traffic count
    15,805 vehicles in 14 hIslington Ave / Judson St, 200 m away, Apr 13, 2025
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
    Parks
    Ourland Park1 min walk
    Alan - Oxford Parkette11 min walk
    Coronation Park - Etobicoke11 min walk

    Schools within 1 km

    • THE MILDENHALL MONTESSORI SCHOOL Private 2 min walk
    • OAK LEARNERS Private 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMimico-QueenswayMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home53%54%
    Population (2021)17,04516,813
    Homes built in 1960 or before43%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMimico-QueenswayCity median
    Assault4209.2636.3
    Robbery41.569.5
    Homicide4.25.3
    Auto theft224.2192.6
    Theft over $5,00066.446.1
    Break and enter132.8172.8
    Theft from vehicles99.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.