HousePrecheckCheck an address

18 Hillmount AveToronto · zoning, lot size and permit records

Also 515 Glencairn Ave

Open space · OR15.4 × 81.9 m1,257 m²on Hillmount Ave

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 2 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N20 m
15.4 m frontage81.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Development application25 201918 NNY 08 SAClosed

    Site Plan Amendment to the previously approved 9-storey mixed-use building under File No. 20 165519 NNY 08 SA. The proposed revisions include a reduction in the number of residential units from 127 to 126, a decrease in the required parking spaces, and a reduction in the permitted gross floor area. In addition, the amendment seeks to increase the required indoor and outdoor amenity space while reducing the green roof area and overall coverage. These changes are intended to refine the development while maintaining the overall intent and character of the original approval.

    Jul 29, 2025 · 515 GLENCAIRN AVE · City file
  • Building permit20 121845Closeddemolition

    DEMOLISH EXISTING 1 STOREY VACANT HOME FOR THE NEW CONDOMINIUM DEVELOPMENT LOCATED AT 2788 BATHURST STREET Zoning By-law applicaton no. 18 153780 NNY 15 OZ

    Jul 29, 2020 · 515 GLENCAIRN AVE
  • Development application20 165519 NNY 08 SAClosed

    Development proposal comprising of a 9 storey mixed-use building and an on-site public park. Total GFA proposed: 24, 160 square metres including 20,833 sqaure metres residential, 2,500 square metres hotel and 827 square metres retail. 113 residential units are proposed with 222 vehicle parking spaces and 122 bicycle parking spaces. Accociated with the ZBA application 18 153780 NNY 15 OZ adopted by City Council on February 26, 2020. http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2020.NY13.1

    Jul 9, 2020 · 515 GLENCAIRN AVE · City file
  • Zoning review20 117008 ZPRClosed
    Feb 19, 2020 · 515 GLENCAIRN AVE
  • Development application18 153780 NNY 15 OZClosed

    This application proposes to construct a mixed-use mid-rise building with a height of 9-storeys and a partial 10th storey incorporating a mechanical penthouse and additional habitable space that also provides access to a roof top terrace. The building would have a total floor area of approximately 26,000 square metres, consisting of 1,020 square metres of street related retail space, a 1,950 square metre hotel with 26 suites, and 23,030 sq.m. of residential space with a total of 113 residential dwelling units. Grade related townhouses are proposed to face the new linear park space at the west edge of the site. Vehicular access to the site would be from Glencairn Avenue and Hillmount Avenue. June2019: Application has been revised to proposed 120 residential units, and 23 hotel rooms. Proposed residential GFA is 21,700 square metres. Revised application proposes to construct a 9 storey mixed-use mid-rise building The building would have a total floor area of approximately 25,000 square metres, consisting of 1,000 square metres of street related retail space, a 1,600 square metre hotel with 23 suites, and 22,110 sq.m. of residential space with a total of 120 residential dwelling units. Grade related townhouses are proposed to face the new linear park space at the west edge of the site. Vehicular access to the site would be from Glencairn Avenue and Hillmount Avenue.

    May 4, 2018 · 515 GLENCAIRN AVE · City file

Lot facts

Area
1,257 m²
Frontage
15.4 m
Depth
81.9 m
Street
Hillmount Ave
Corner lot
No
Public lane
None
Max height
10 m
Max lot coverage
35%
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: birch, white (22 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%33 of 37 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
7

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To permit a front yard parking pad.

    23 HOLLAMAN RD · Dec 10, 2026 · 184 m away
  • Minor variancePending

    To construct a new place of worship.

    10 GLEN PARK AVE · Nov 26, 2026 · 180 m away
  • Building permit

    Proposed structural modifications for the home lift installation in the Single Dwelling Unit

    38 PRUE AVE · Nov 20, 2026 · 273 m away
  • Zoning review

    Not Started

    396 CORTLEIGH BLVD · Nov 5, 2026 · 231 m away
  • Building permit

    Backwater Valve installation

    465 LYTTON BLVD · Oct 22, 2026 · 295 m away
  • Zoning review

    Closed

    2788 BATHURST ST · Jun 15, 2026 · 51 m away
  • Building permit

    Proposal for an open deck floor in rear yard at the first floor level of an existing day nursery with ancillary place of worship.See also 25 228906 ZAP and 25 255574 MV

    396 CORTLEIGH BLVD · Jun 12, 2026 · 231 m away
  • Zoning review

    Closed

    2788 BATHURST ST · Jun 10, 2026 · 51 m away
  • Zoning review

    Response Received

    10 GLEN PARK AVE · May 29, 2026 · 180 m away
  • Development application

    OPA & Rezoning Application proposes the development of an 12-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 225 residential units, being a mix of Studio, 1-bedroom, 2-bedroom and 3-bedroom units. A total of 158 vehicle parking spaces are proposed on 3 underground levels; as well as 248 bicycle parking spaces. The proposed development provides a total GFA of 19,332 square metres and a FSI of 6.61. Additionally, the proposed development provides 462 square metres of indoor amenity space and 513 square metres of outdoor amenity space.

    282 STRATHALLAN WOOD · May 22, 2026 · 81 m away · City file

Neighbourhood: Englemount-Lawrence

About the area around the lot, not the lot itself.

Nearest station
Glencairn Station16 min walk
Nearest TTC stop
Glencairn Ave at Bathurst St West Side1 min walk
Nearest cycling route
Glencairn AveSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
33,318 vehicles in 14 hBathurst St / Glencairn Ave, 100 m away, May 29, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Hillhurst Parkette5 min walk
Cortleigh Parkette5 min walk
Briar Hill - Chaplin Park7 min walk

Schools within 1 km

  • BIALIK HEBREW DAY SCHOOL Private 2 min walk
  • TORAH EMETH JEWISH CENTRE & EITZ CHAIM HEBREW SCHOOL Private 3 min walk
  • EITZ CHAIM SCHOOL (BATHURST) Private 4 min walk
  • BNOS BAIS YAAKOV SCHOOL FOR GIRLS Private 9 min walk
  • OUR LADY OF THE ASSUMPTION CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • GLEN PARK PUBLIC SCHOOL English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEnglemount-LawrenceMedian neighbourhood
Median household income (2020)$78,000$84,500
Households that own their home43%54%
Population (2021)21,28516,813
Homes built in 1960 or before26%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEnglemount-LawrenceCity median
Assault539.9636.3
Robbery45.769.5
Homicide4.25.3
Shootings24.910.5
Auto theft149.5192.6
Theft over $5,00029.146.1
Break and enter137172.8
Theft from vehicles207.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.