Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 265350 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsBuilding permit open since 2017
Needs a closer lookStill open in the City's records: 17 167026 (Proposed boiler plant retrofit to existing apartment building penthouse floor, 2017, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 172644 000 00 IR (Adequate Heat, 2026); 26 172643 000 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 98 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (16 storeys, 128 units, built 1980).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 265350 PRS 00 IRRescheduled
Property Standards
Nov 4, 2026 · 18 DAVENPORT RD - By-law investigation26 172644 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 18 DAVENPORT RD - By-law investigation26 172643 000 00 IRClosed
Property Standards
Jun 1, 2026 · 18 DAVENPORT RD - Zoning review19 128980 ZPRClosedMar 21, 2019 · 18 DAVENPORT RD
- Building permit17 272011Closed
Replace existing fire alarm control panel and annunciator panel
Jan 11, 2018 · 18 DAVENPORT RD - Building permit17 167026Inspection
Proposed boiler plant retrofit to existing apartment building penthouse floor.
Jun 21, 2017 · 18 DAVENPORT RD - Building permit09 197487Closed
Proposal to install 1 back flow preventor in existing apartment building.
Dec 29, 2009 · 18 DAVENPORT RD - Zoning review05 140855 ZSVClosedJun 8, 2005 · 18 DAVENPORT RD
Show 2 older records
- Zoning review05 129140 ZPRClosedMay 4, 2005 · 18 DAVENPORT RD
- Building permit97 020491Closed
CARRY OUT REMEDIAL WORK TO COMPLY WITH THE RETROFIT PROVISIONS OF TH FIRE CODE.(NO INFORMATION LETTER RECEIVED) GN
Aug 22, 1997 · 18 DAVENPORT RD
Check before you build
Site-specific exception 900.11.10(2403)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 304 of former City of Toronto By-law 438-86
- Older by-law C
On 18 Davenport Rd., 15 McMurrich St., the even numbered addresses of 890-900 Yonge St., former City of Toronto by-laws 839-78 and 202-79
2 parts for other addresses
- D On 77 McMurrich St., 950 Yonge St., former City of Toronto by-law 95-0137
- E On the even numbered addresses of 890-900 Yonge St., former City of Toronto by-law 667-83.
Lot facts
- Area
- 1,038 m²
- Frontage
- 48.4 mestimated, irregular lot
- Depth
- 36.7 mestimated, irregular lot
- Street
- Davenport Rd
- Corner lot
- No
- Public lane
- None
- House footprint
- 527 m²roof up to 51.1 m
- Back yard
- 7.7 mhouse to rear lot line
- Side yards
- 1.3 m and 18.2 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- 30 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Rosedale. The lot is inside the Rosedale Major Transit Station Area approved by the Province (Site and Area Specific Policy 719). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c1.75; r4.0) SS1 (x2403) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 97%29 of 30 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 3
- Development applications
- 37
Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 262 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).
131 DAVENPORT RD · Oct 7, 2026 · 371 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.
874 YONGE ST · Aug 5, 2026 · 102 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 204 m away - Minor varianceApproved
To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.
106 SCOLLARD ST · Jun 10, 2026 · 320 m away
Latest activity nearby
- Zoning review
Application Acceptable
12 CUMBERLAND ST · Nov 24, 2026 · 234 m away - Minor variancePending
In Progress
931 YONGE ST · Nov 24, 2026 · 263 m away - Building permit
1 wall sign + 1 projecting sign***HELLO NORI***
1250 BAY ST · Nov 24, 2026 · 298 m away - Zoning review
Application Acceptable
931 YONGE ST · Nov 20, 2026 · 263 m away - Building permit
6 overhanging structure signs**AEVUM**
11 YORKVILLE AVE · Nov 19, 2026 · 178 m away - Building permit
This alternative solution is prepared to seek a variance and address use of electromagnetic locking devices on the exit doors and doors in access to exit on the ground floor of the long-term care home located at located at 55 Belmont Street, Toronto, ONPlease refer to Report "VFT21473R04 Belmont House Mag Lock Alt Rept 28Oct2026".
55 BELMONT ST · Nov 17, 2026 · 244 m away - Building permit
INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802
50 YORKVILLE AVE · Nov 16, 2026 · 160 m away - Zoning review
Not Started
12 CUMBERLAND ST · Nov 12, 2026 · 234 m away - Building permit
Proposed interior alterations and addition to create a Group D dental office within an existing three-storey building, including associated mechanical and electrical work.
17 BELMONT ST · Nov 12, 2026 · 247 m away - Building permit
Proposal for ground floor sprinkler alteration for the bicycle storage and associated office/corridor
877 YONGE ST · Nov 10, 2026 · 138 m away
Neighbourhood: Annex
About the area around the lot, not the lot itself.
- Nearest station
- Yonge Station5 min walk
- Nearest TTC stop
- Yonge St at Davenport Rd1 min walk
- Nearest cycling route
- Davenport RdCycle Track, 1 min walk
- Nearest traffic count
- 8,284 vehicles in 8 hDavenport Rd / McMurrich St, 60 m away, Mar 28, 2011
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 3 with cyclists
- Parks
- Frank Stollery Parkette1 min walk
- Town Hall Square2 min walk
- Rosedale Ravine Lands3 min walk
Schools within 1 km
- MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 2 min walk
- JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 4 min walk
- CAREER QUEST - TORONTO Private 8 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 9 min walk
- ROSEDALE DAY SCHOOL Private 9 min walk
- BRANKSOME HALL GIRLS SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Annex | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $85,000 | $84,500 |
| Households that own their home | 41% | 54% |
| Population (2021) | 29,300 | 16,813 |
| Homes built in 1960 or before | 40% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Annex | City median |
|---|---|---|
| Assault | 1080.9 | 636.3 |
| Robbery | 80.5 | 69.5 |
| Homicide | 5.2 | 5.3 |
| Shootings | 5.2 | 10.5 |
| Auto theft | 116.9 | 192.6 |
| Theft over $5,000 | 114.3 | 46.1 |
| Break and enter | 387.1 | 172.8 |
| Theft from vehicles | 220.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.