HousePrecheckCheck an address

1795 Markham RdToronto · zoning, lot size and permit records

Also 1775 Markham Rd, 1785 Markham Rd

Residential multiple · RM (u20) (x332)44.5 × 60.5 m2,565 m²on Ormerod Stcorner, also on Markham Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 10 296009 (REV. #2- see attached letterTo construct a 3 storey block of stacked townhouses, 16 units, 2012, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 1 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
44.5 m frontage60.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 10 296009 (REV. #2- see attached letterTo construct a 3 storey block of stacked townhouses, 16 units, 2012, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 230241 WST 00 IRClosed

    Waste

    Sep 24, 2025 · 1775 MARKHAM RD
  • Building permit18 206787Cancelled

    To erect and display one non-illuminated ground sign.***DR. YAQOOB ASHRAF KHAN***

    Aug 10, 2018 · 1795 MARKHAM RD
  • Building permit10 296009Revision Issuednew building, new house

    REV. #2- see attached letterTo construct a 3 storey block of stacked townhouses, 16 units

    Apr 13, 2012 · 1795 MARKHAM RD
  • Building permit10 296022Closednew building, new house

    REV. #2- see attached letterTo construct a 3 storey block of stacked townhouses, 8 units

    Mar 20, 2012 · 1795 MARKHAM RD
  • Building permit10 296019Closednew building, new house

    REV. #1- see attached letterTo construct a 3 storey block of stacked townhouses, 20 units

    Mar 20, 2012 · 1795 MARKHAM RD
  • Zoning review11 286820 PCDClosed
    Oct 4, 2011 · 1795 MARKHAM RD
  • Building permit10 233042Closednew building

    Parking garage for future stacked townhouses

    Sep 8, 2011 · 1795 MARKHAM RD
  • Building permit10 164517Cancelled
    Apr 27, 2010 · 1795 MARKHAM RD

Check before you build

  • Site-specific exception 900.6.10(332)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(332)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum lot coverage is 51%

  2. Rule B

    A minimum of 49% of the lot area must be used for landscaping

  3. Rule C

    The maximum building height is the lesser of 4 storeys and 13.5

  4. Rule D

    The minimum building setback from a lot line is: (i) 1.7 metres if the lot line abuts Markham Rd.; and (ii) 1.2 metres from the northerly lot line

  5. Rule E

    A below ground parking structure and storage must be a minimum of 0.5 metres from any lot line

  6. Rule F

    Parking spaces must be provided underground at a minimum rate of 1.2 for each dwelling unit for resident use, plus 0.2 for each dwelling unit , for visitor use. Prevailing By-laws and Prevailing Sections: (A) City of Toronto by-law 687-2007.

  7. Older by-law A

    The maximum lot coverage is 51%

  8. Older by-law B

    A minimum of 49% of the lot area must be used for landscaping

  9. Older by-law C

    The maximum building height is the lesser of 4 storeys and 13.5

  10. Older by-law D

    The minimum building setback from a lot line is: (i) 1.7 metres if the lot line abuts Markham Rd.; and (ii) 1.2 metres from the northerly lot line

  11. Older by-law E

    A below ground parking structure and storage must be a minimum of 0.5 metres from any lot line

  12. Older by-law F

    Parking spaces must be provided underground at a minimum rate of 1.2 for each dwelling unit for resident use, plus 0.2 for each dwelling unit , for visitor use. Prevailing By-laws and Prevailing Sections: (A) City of Toronto by-law 687-2007.

By-law 569-2013, Chapter 900

Lot facts

Area
2,565 m²
Frontage
44.5 m
Depth
60.5 m
Street
Ormerod St
Corner lot
Yes, also on Markham Rd60.5 m along it
Public lane
None
Max height
54 m
Max lot coverage
33%
  • Site and Area Specific Policy 118. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone RM (u20) (x332) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
50%1 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
3

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    REV01: Revision to limit occupant load to 30.Proposed interior alterations and unit finish (fit-out) for a restaurant.

    1780 MARKHAM RD · Nov 6, 2026 · 107 m away
  • Building permit

    One wall sign.***PUNJABI HAVELI***

    1780 MARKHAM RD · Sep 9, 2026 · 107 m away
  • Building permit

    1 WALL SIGN**PUNJABI HAVELI**

    1780 MARKHAM RD · Aug 25, 2026 · 107 m away
  • Building permit

    To erect and display one illuminated wall sign. ***PUNJABI HAVELI***

    1780 MARKHAM RD · Aug 19, 2026 · 107 m away
  • Building permit

    1 Wall Sign

    1780 MARKHAM RD · Jul 24, 2026 · 107 m away
  • Building permit

    Standpipe Booster Pump Replacement

    5600 SHEPPARD AVE E · Jul 22, 2026 · 230 m away
  • Zoning review

    Cancelled

    5080 SHEPPARD AVE E · Jul 2, 2026 · 187 m away
  • Building permit

    Proposal for replacement of the existing fire alarm control panel and annunciator.

    5580 SHEPPARD AVE E · Apr 29, 2026 · 154 m away
  • Building permit

    Interior alteration to remove load bearing wall at ground level. UNIT 68

    86 MALVERN ST · Mar 25, 2026 · 286 m away
  • Building permit

    Adding heating cooling system to existing house.

    86 MALVERN ST · Dec 17, 2025 · 286 m away

Neighbourhood: Malvern West

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station41 min walk
Nearest TTC stop
Markham Rd at Verne Cres2 min walk
Nearest traffic count
37,730 vehicles in 14 hMarkham Rd / Ormerod St, 50 m away, May 14, 2024
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Cynthia Lai Park6 min walk
Pinetree Park9 min walk
Burrows Hall Park12 min walk

Schools within 1 km

  • ISLAMIC FOUNDATION SCHOOL Private 6 min walk
  • GIBRALTAR LEADERSHIP ACADEMY SCHOOL Private 7 min walk
  • MALVERN JR PUBLIC SCHOOL English Public 9 min walk
  • VEDIC ROOTS Private 12 min walk
  • TAYYIBAH ISLAMIC ACADEMY INC SCHOOL Private 12 min walk
  • AL AZHAR ISLAMIC SCHOOL - MAIN OFFICE Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern WestMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home74%54%
Population (2021)17,32016,813
Homes built in 1960 or before6%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern WestCity median
Assault635636.3
Robbery125.969.5
Shootings27.410.5
Auto theft366.8192.6
Theft over $5,00065.746.1
Break and enter43.8172.8
Theft from vehicles208188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.