HousePrecheckCheck an address

179 John StToronto · zoning, lot size and permit records

Also 189 John St

34.6 × 34.8 m1,194 m²on John Stcorner, also on Stephanie Stbacks onto St Patricks Market

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 245757 (Interior alterations to existing office areas on Floors 5, 6 and 7, including new non-l..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 10 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
34.6 m frontage34.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 8 building permits open, the oldest since 2010

    Needs a closer look

    Still open in the City's records: 23 177614 (Fire panel and annunciator replacement. All zoning and field devices to remain unchanged, 2023, status Permit Issued); 22 218524 (Revision 01: Alteration of existing sprinkler system, based on new layout to meet the r..., 2023, status Revision Issued); 22 142615 (Proposal for interior alterations to existing office space - SUITE 101 & 102, 2022, status Inspection); and 5 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 245757 (Interior alterations to existing office areas on Floors 5, 6 and 7, including new non-l..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

27 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 245757Inspection

    Interior alterations to existing office areas on Floors 5, 6 and 7, including new non-loadbearing partitions and doors, alterations to existing office and boardroom areas, removal of selected interior glazing, and associated architectural work. No change of use or major occupancy.

    Oct 29, 2026 · 179 JOHN ST
  • Building permit23 177614Permit Issued

    Fire panel and annunciator replacement. All zoning and field devices to remain unchanged.

    Sep 6, 2023 · 179 JOHN ST
  • Building permit22 218524Revision Issued

    Revision 01: Alteration of existing sprinkler system, based on new layout to meet the requirements of NFPA 13 (2013) & OBC (2012).interior alterrations to create additional office space along north floor plate, south offices to be altered UNIT 200

    Jun 16, 2023 · 179 JOHN ST
  • Building permit22 142615Inspection

    Proposal for interior alterations to existing office space - SUITE 101 & 102

    May 24, 2022 · 179 JOHN ST
  • Building permit21 187657Inspection

    Proposal for interior alterations to existing office building unit 403

    Aug 13, 2021 · 179 JOHN ST
  • Building permit21 122425Closed

    Proposal for interior alterations for existiing office building 2nd floor

    Mar 31, 2021 · 179 JOHN ST
  • Building permit19 222602Closed

    Proposal for renovations of the four common bathrooms on the main and 3rd floors. Work consists of removing existing tiles, drywall, counters, sinks, toilets, bathroom partitions and replace with new in same locations.

    Nov 14, 2019 · 179 JOHN ST
  • Building permit19 108618Closed

    Proposal for interior alterations to unit 101 in the existing office building, scope of work includes plumbing hvac and electrical.

    Feb 13, 2019 · 179 JOHN ST
Show 19 older records
  • Building permit18 210286Permit Issued

    Proposal to construct interior alterations to existing office unit 300

    Aug 17, 2018 · 179 JOHN ST
  • Building permit17 246614Closed

    Proposed installation of electromagnetic lock in existing office space in unit 800.

    Nov 8, 2017 · 179 JOHN ST
  • Building permit17 204944Closed

    Proposal for interior alterations to 8th floor of existing office building. tenant- CRAWLEY MACKEWN BRUSH LLP

    Aug 9, 2017 · 179 JOHN ST
  • Building permit16 158456Closed

    Proposal for interior alterations to the 2nd floor of the existing office building for "PIGEON". Scope of work includes the construction of new partitions.

    Jun 1, 2016 · 179 JOHN ST
  • Building permit15 259107Inspection

    Proposal for interior alterations to the 4th floor in existing office - new tenant is "Spotify"

    Dec 14, 2015 · 179 JOHN ST
  • Building permit14 115569Closed

    Proposal to replace the chiller, cooling tower, related pumps and air handling unit coils. HVAC work on all 8 floors in mechanical rooms.

    Mar 3, 2014 · 179 JOHN ST
  • Building permit13 221027Closed

    Proposal for interior alterations to suite 101 of existing office building for "David Suzuki Foundation" (320m2)

    Aug 22, 2013 · 179 JOHN ST
  • Building permit13 197904Closed

    Proposal to install a sink in suite 301 of an existing office building.

    Jul 17, 2013 · 179 JOHN ST
  • Building permit12 153883Closed

    Revise 1 backflow preventor (to show existing pipe from 2" to 3").

    Jul 19, 2012 · 179 JOHN ST
  • Building permit10 242150Inspection

    Proposal for interior alterations to 6th and 7th floor for tenant "GRIP LTD" (822m2). Tenant currently occupies the 5th and 6th floors of office building.

    Sep 23, 2010 · 179 JOHN ST
  • Building permit10 203489Inspection

    Make interior alterations on 8th floor

    Jul 14, 2010 · 179 JOHN ST
  • Building permit06 190215Closed

    Interior alterations to existing office on the 4th floor.

    Nov 23, 2006 · 179 JOHN ST
  • Building permit05 162366Closed

    Interior alterations to existing 8 storey office building. Installation of fusible link fire shutters to the underside of existing structural bemas to maintain integrity of fire seperation between floors at interconnected floor space.

    Aug 5, 2005 · 179 JOHN ST
  • Building permit03 201753Closed

    Make interior alterations to portion of the 7th and 8th floors. Tenant: Points International Ltd. Existing and proposed: Office.

    Dec 29, 2003 · 179 JOHN ST
  • Zoning review03 128939 ZPUClosed
    May 2, 2003 · 179 JOHN ST
  • Building permit98 022862Closed

    H.V.A.C. ALTER DUCTWORK ON PORTION OF 7TH FLOOR EXISTING COMMUNICATION AND BROADCASTING ESTABLISHMENT. TENANT: COMMAND POST AND TRANSFER. COST INCLUDED IN 415686 EDC

    Oct 23, 1998 · 179 JOHN ST
  • Building permit97 024754Closed

    H.V.A.C ALTER DUCTWORK ON PORTIONS OF 2ND FLOOR AND 3RD FLOOR (SUITE 204 AND SUITE 303) FOR GOVERNMENT OFFICES. ADD NEW EXHAUST FAN AND DUCTWORK TO SUITE 204. TENANT: CITYHOME WEST DISTRICT OFFICE. SEE AND COST INCLUDED IN 406588 EDC

    Apr 23, 1998 · 179 JOHN ST
  • Building permit97 021046Closed

    REVISE BRANCH DUCTWORK AND VAV BOXES - SUITE 401

    Sep 4, 1997 · 179 JOHN ST
  • Building permit97 020203Closed

    MAKE ALTERATIONS TO REINFORCE PORTION OF EXISTING ROOF. BP

    Aug 14, 1997 · 179 JOHN ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,194 m²
Frontage
34.6 m
Depth
34.8 m
Street
John St
Corner lot
Yes, also on Stephanie St34.8 m along it
Public lane
St Patricks Market, 34.6 m along it
House footprint
919 m²roof up to 35.1 m
Back yard
0 mhouse to rear lot line
Side yards
1.7 m and 5.8 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%17 of 17 decisions
    Garden suite permits
    0
    Laneway suite permits
    4
    Multiplex permits
    8
    Development applications
    20

    Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit an entertainment facility-related use (interactive game show experience) located within a portion of the first storey of the existing four-storey building, in addition to the existing restaurant use (as approved under Building Permit 20 118020 BLD 00 BA) and existing recreational use (place of amusement, as approved under Minor Variance Decision A0903/23TEY). The existing office uses located on the second to fourth storeys will be maintained.

      336 QUEEN ST W · Sep 2, 2026 · 365 m away
    • Minor varianceApproved

      To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the west side.

      34 SULLIVAN ST · Aug 12, 2026 · 311 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-Law 663-2011), for an existing 36-storey mixed-use building, by enclosing the north side outdoor patio for the eating establishment (restaurant).

      117 PETER ST · Jul 15, 2026 · 339 m away
    • Minor varianceApproved

      To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.

      333 QUEEN ST W · Apr 1, 2026 · 176 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).

      52 PHOEBE ST · Mar 11, 2026 · 396 m away

    Latest activity nearby

    • Consent (lot split)Pending

      To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.

      100 MCCAUL ST · Dec 16, 2026 · 225 m away
    • Zoning review

      Closed

      84 ST PATRICK ST · Nov 24, 2026 · 206 m away
    • Minor variancePending

      In Process

      165 JOHN ST · Nov 24, 2026 · 60 m away
    • Building permit

      Interior Alteration of Existing Group D office- reconfigure existing office spaces, including dividing one room into two meeting rooms and opening another room to create an open workspace - 2nd Floor

      190 SIMCOE ST · Nov 24, 2026 · 226 m away
    • Building permit

      Proposed interior alterations of existing office for new model suite fit-out - UNIT 403

      217 RICHMOND ST W · Nov 18, 2026 · 247 m away
    • Building permit

      Proposed interior alterations of existing office to new model suite fit-out.

      217 RICHMOND ST W · Nov 18, 2026 · 247 m away
    • Building permitmultiplex

      Proposal for interior alteration and adding new rear balcony and stairs to convert a single family semi detached dwelling to fourplex

      14 SULLIVAN ST · Nov 16, 2026 · 263 m away
    • Zoning review

      Closed

      130 JOHN ST · Nov 10, 2026 · 274 m away
    • Building permit

      1 wall sign.***NAWABS LEGENDARY BBQ***

      228 QUEEN ST W · Nov 10, 2026 · 112 m away
    • Building permit

      Proposal for interior alterations to convert existing retail store into a restaurant with greater than 30 seats.

      241 QUEEN ST W · Nov 9, 2026 · 231 m away

    Neighbourhood: Kensington-Chinatown

    About the area around the lot, not the lot itself.

    Nearest station
    Osgoode Station6 min walk
    Nearest TTC stop
    Queen St West at John St2 min walk
    Nearest cycling route
    Stephanie StBike Lane - Contraflow, 1 min walk
    Nearest traffic count
    3,153 vehicles in 8 hPhoebe St / Beverley St, 120 m away, Oct 18, 2022
    Serious collisions within 500 m
    112021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 4 with cyclists
    Parks
    St. Patricks Square1 min walk
    Grange Park1 min walk
    Grasett Park6 min walk

    Schools within 1 km

    • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 2 min walk
    • OCAD UNIVERSITY - STUDENT CENTRE University 2 min walk
    • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 3 min walk
    • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 4 min walk
    • OCAD UNIVERSITY - THE LEARNING ZONE University 5 min walk
    • CONTACT ALTERNATIVE SCHOOL English Public 5 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKensington-ChinatownMedian neighbourhood
    Median household income (2020)$62,000$84,500
    Households that own their home32%54%
    Population (2021)18,12016,813
    Homes built in 1960 or before26%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKensington-ChinatownCity median
    Assault2017.5636.3
    Robbery19369.5
    Shootings21.910.5
    Auto theft118.4192.6
    Theft over $5,000219.346.1
    Break and enter443172.8
    Theft from vehicles850.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.