Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 53 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- Building permit23 133013Closed
Replacement of waterproofing membrane on the parking garage roof deck including removal of the existing pavers and pour a new concrete pad.
May 10, 2023 · 178 JARVIS ST - Building permit09 158897Closed
Installation of a 3" backflow preventer Conbraco model #4SG-100-02 to be installed in the parking level mechanical room.
Aug 24, 2009 · 178 JARVIS ST - Building permit04 182160Closed
Replace fire alarm panel and fire alarm mini horn in each suite.
Oct 22, 2004 · 178 JARVIS ST - Building permit03 100299Closed
remove and replace domestic hot water risers throughout building. (16 risers x 9 floors x 9' per floor as per archie)
Jan 6, 2003 · 178 JARVIS ST - Building permit00 164682Cancelled
ALTER PLANS AS APPROVED UNDER 133925 BY MAKING STRUCTURAL CHANGES. EXISTING- APARTMENT BUILDING- 79 UNITS PROPOSED- SAME
Jun 22, 2000 · 178 JARVIS ST - Building permit00 133925Closed
exterior wall recladding between 8th floor and 11th floor on east elevation. 278.7 m2 of wall area.
Apr 19, 2000 · 178 JARVIS ST - Zoning review85 026816 LTOClosedJul 22, 1985 · 178 JARVIS ST
Check before you build
Site-specific exception 900.11.10(2517)
Needs a closer look1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
1 part for other addresses
- C On the even numbered addresses of 186-188 Jarvis St., former City of Toronto by-law 192-93.
Lot facts
- Area
- 1,677 m²
- Frontage
- 47.4 m
- Depth
- 35.9 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- Ln W Jarvis N Shuter, 50.5 m along it
- House footprint
- 927 m²roof up to 41.4 m
- Back yard
- 9.6 mhouse to rear lot line
- Side yards
- 0.1 m and 7 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2517) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: ash, green (26 cm), ash, green (25 cm), ash, green (25 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 97%29 of 30 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 15
- Development applications
- 47
Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 225 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 498 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 182 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 56 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 51 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 294 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 300 m away - Building permit
Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.
231 DUNDAS ST E · Nov 19, 2026 · 240 m away - Zoning review
Not Started
134 JARVIS ST · Nov 6, 2026 · 182 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 86 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 291 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 54 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 171 m away - Building permit
REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.
154 SHUTER ST · Oct 15, 2026 · 300 m away - Zoning review
Closed
88 QUEEN ST E · Oct 14, 2026 · 260 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 10,663 vehicles in 8 hJarvis St / Shuter St, 70 m away, Dec 3, 2022
- Serious collisions within 500 m
- 232021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 1 with cyclists
- Parks
- Arena Gardens1 min walk
- 45 Dalhousie St Park2 min walk
- Moss Park3 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.