Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 177 College St
177 College St is on a 7 m by 30.5 m lot on College St in Kensington-Chinatown. The zoning is CR. A site-specific exception, 900.11.10(2359), changes some of the usual rules for this address. The lot also fronts King's College Rd. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 10 records on this lot since 1983. That is more than at 99% of Toronto houses. In 2006, a building permit was filed: "To construct a deck patio at the front of an existing restaurant". Status: closed. In 2004, a building permit was filed: "Interior alterations to 24 seat restaurant to upgrade fire separations". Status: closed. In 2004, a building permit was filed: "Replace existing roof structure; repair wall(s) at roofline. refer to permit #04-135177 bld. see unsafe condition order". Status: closed. Nothing on file is open right now.
Within 300 m, 4 development applications are open (the tallest up to 31 storeys). Queen's Park station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: listedModerate
- Site-specific exception 900.11.10(2359)Moderate
- 4 development applications open within 300 mLowFree check
- Site and Area Specific Policy 202, 533Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-06-06 | Zoning review24 160675 LPR | No description on file | Closed | |
| 2016-05-25 | Zoning review16 161109 LPR | No description on file | Closed | |
| 2016-04-04 | Zoning review16 135593 LPR | No description on file | Closed | |
| 2006-05-25 | Building permit05 116042 | To construct a deck patio at the front of an existing restaurant | Closed | |
| 2006-04-25 | Zoning review06 128504 LTO | No description on file | Closed | |
| 2004-12-22 | Building permit04 201160 | Interior alterations to 24 seat restaurant to upgrade fire separations. | Closed | |
| 2004-06-17 | Building permit04 135175 | Replace existing roof structure; repair wall(s) at roofline. Refer to permit #04-135177 BLD. See Unsafe condition Order | Closed | |
| 2001-11-20 | Zoning review01 196486 LTO | No description on file | Closed | |
| 1984-08-15 | Zoning review84 026769 LTO | No description on file | Closed | |
| 1983-11-09 | Zoning review83 026441 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(2359)
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2359)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 202, 533
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2359)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c1.0; r2.5) SS2 (x2359)
- Height limit
- —
- Corner lot
- Yes, also on King's College Rd
- Public lane
- Ln 1 S College W Mc Caul, 7 m along it
- House footprint
- 104 m²
- Back yard
- 6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 4 development applications open within 300 m, up to 31 storeys
- In the Queens Park station area
- 14 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
4 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 4.8 times the Toronto median
- Theft from vehicles: 4.5 times the Toronto median
- Assault: 3.2 times the Toronto median
- Robbery: 2.8 times the Toronto median
- Break and enter: 2.6 times the Toronto median
- Shootings: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Kensington-Chinatown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station5 min walk
- College St at McCaul StNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- Ronald McDonald HouseSchool1 min walk
- Orde Street Jr Public SchoolSchool2 min walk
- Braemar College Private Secondary SchoolSchool5 min walk
- Beverley & Subway Academy TwoSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32017.5
- Robberycity median 69.5193
- Shootingscity median 10.521.9
- Auto theftcity median 192.6118.4
- Theft over $5,000city median 46.1219.3
- Break and entercity median 172.8443
- Theft from vehiclescity median 188.1850.8
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist