Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register13 building permits open, the oldest since 2004
Needs a closer lookStill open in the City's records: 24 223180 (Alternative Solution for Escalator Egress Capacity, 2024, status Deficiency Notice Issued); 22 239070 (Proposed Interior Alterations mercantile use (coffee shop). Relocation of existing coff..., 2023, status Permit Issued); 22 224028 (Changes to the sprinkler system for new millwork fixtures, 2022, status Inspection); and 10 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)4 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 26 254630 PRS 00 IR (Property Standards, 2026); 26 251260 PRS 00 IR (Property Standards, 2026); 25 215527 PRS 00 IR (Property Standards, 2025); and 1 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 147444 (Alternative Design Solution (ADS #45), with regards to the Principal Entrance and Emerg..., 2026); 25 195327 (Alternative solution related to standpipe riser protection for Moss Park Station - ADS 38, 2025); 25 194744 (Proposal for Alternative Solution related to Station Emergency Power - Queen Station -..., 2025); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. B0070/07TEY (To obtain consent to an Operating Agreement having the effect of granting rights to use..., 2007).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
146 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 254630 PRS 00 IRClosed
Property Standards
Oct 14, 2026 · 176 YONGE ST - By-law investigation26 251260 PRS 00 IRClosed
Property Standards
Oct 7, 2026 · 176 YONGE ST - Building permit26 147444Deficiency Notice Issued
Alternative Design Solution (ADS #45), with regards to the Principal Entrance and Emergency Vestibule for the OLS Queen Station
Apr 21, 2026 · 1 QUEEN ST W - Zoning review25 268073 ZAPCancelledDec 18, 2025 · 176 YONGE ST
- By-law investigation25 215527 PRS 00 IRClosed
Property Standards
Aug 25, 2025 · 176 YONGE ST - Building permit25 195327Deficiency Notice Issued
Alternative solution related to standpipe riser protection for Moss Park Station - ADS 38
Jul 17, 2025 · 176 YONGE ST - Building permit25 194744Deficiency Notice Issued
Proposal for Alternative Solution related to Station Emergency Power - Queen Station - ADS 36
Jul 16, 2025 · 176 YONGE ST - Building permit23 192081Closed
Revisiont to SHO PPPart Permit - To construct new Ontario Line transit - Queen/Yonge Transit Station
Jun 23, 2025 · 176 YONGE ST
Show 138 older records
- By-law investigation25 170597 ZON 00 IRClosed
Zoning
Jun 3, 2025 · 176 YONGE ST - Building permit25 132993Deficiency Notice Issued
Alternative Solution outlined application form
Mar 21, 2025 · 176 YONGE ST - Building permit25 109411Deficiency Notice Issued
Egress from Service Areas Queen Station
Jan 27, 2025 · 176 YONGE ST - Building permit22 113847Closed
Revision 11 - changes to cash office layout to suit the removal of existing wall between previous cash office 02 and 04Revision 10 - Mechanical room updates - supporting materials submittedRevision 09- Hudson Bay Basement Modification capturing design changes included in supporting materials as submittedIn addition, the current basement encroachment under the street sidewalk will be removed, with the exception of a part of the hydro vault that will remain within the encroachment in order to provide THESL street access.Revision 06 - cancelled, issues with IBMSRevision 05 - CIP wall to wrap around the existing brick encasement at columns A10, A11, A12, AX15, A20 and A21Revision 04 - design changes : Hudson Bay Basement Modification capturingdesign changes included in supporting materials as submittedRenovation to Existing Mercantile and Associated Support Space at Basement Level of the Bay Department Store. re: the Ontario Line Subway project - Queen Station
Nov 1, 2024 · 176 YONGE ST - Building permit24 223180Deficiency Notice Issued
Alternative Solution for Escalator Egress Capacity
Oct 7, 2024 · 176 YONGE ST - Zoning review24 133516 LTOClosedApr 8, 2024 · 176 YONGE ST
- Zoning review23 236993 LTOClosedDec 19, 2023 · 176 YONGE ST
- Zoning review23 177220 LTOClosedJul 20, 2023 · 176 YONGE ST
- Zoning review23 161003 LTOClosedJun 15, 2023 · 176 YONGE ST
- Building permit22 239070Permit Issued
Proposed Interior Alterations mercantile use (coffee shop). Relocation of existing coffee shop to different location within existing building.
Jan 31, 2023 · 176 YONGE ST - Building permit22 231539Closed
Proposal to update basement sprinkler system.
Dec 19, 2022 · 176 YONGE ST - Building permit22 224028Inspection
Changes to the sprinkler system for new millwork fixtures
Nov 29, 2022 · 176 YONGE ST - Zoning review22 198003 LTOClosedAug 31, 2022 · 176 YONGE ST
- Building permit22 181848Permit Issued
Proposal to install 8 maglocks ( 4 lobby doors)
Aug 4, 2022 · 176 YONGE ST - Building permit22 133278Closed
HVAC - Construct a interior alterations for WeWork
May 27, 2022 · 176 YONGE ST - Building permit22 129598Closed
HVAC - Proposal to construct interior alterations to floors 1 and 2 of an existing SAKS retail store.
May 20, 2022 · 176 YONGE ST - Building permit22 105456Inspection
Proposal to enclose existing interconnected stair on 7th floor
Mar 21, 2022 · 176 YONGE ST - Building permit18 145165Closed
Revision # 01 - To provide additional steam connection to the 6th floor heat exchanger.HVAC - Proposal for interior alterations to the 6th and 7th floors - back to base build - in existing office space. Phase 1 - Interior Demolition.
Feb 22, 2021 · 176 YONGE ST - Building permit19 250533Closed
To erect and display seven non-illuminated static wall signs. erected on the west, north and south elevations of the building. One of which erected on the second storey and all other signs on the first storey of the building. ****WE WORK****
Mar 10, 2020 · 176 YONGE ST - Zoning review20 112314 LTOClosedFeb 5, 2020 · 176 YONGE ST
- Building permit19 202056Closed
Revision # 01 - To add 1 additional maglock on the 7th floor of the existing Multiple Use/Non Residential BuildingProposal to install 10 maglocks on floors 6 + 7 of existing multiple unit building.
Sep 27, 2019 · 176 YONGE ST - Building permit19 172773Permit Issued
Proposal to retrofit sprinkler system on 6th and 7th floor of existing office building
Jul 15, 2019 · 176 YONGE ST - Building permit19 170097Inspection
Proposal to reinforce and repair the exterior foundation wall and structural slab along Bay Street (west side of building)
Jun 27, 2019 · 176 YONGE ST - Zoning review19 148641 LTOClosedMay 3, 2019 · 176 YONGE ST
- Building permit17 274606Closed
Revision - Revision to the sprinklers for protection of DOor 31 in accordance with 18 271289 ALT 00 AS.Revision to electrical components - see attached letter.
Mar 7, 2019 · 176 YONGE ST - Zoning review19 118022 ZPRClosedFeb 22, 2019 · 176 YONGE ST
- Zoning review19 118016 ZPRClosedFeb 22, 2019 · 176 YONGE ST
- Building permit18 271289Approved
AS- SPRINKLER WATER CURTAIN 6TH FLOORProposal for interior alterations to existing retail store - "Hudson's Bay"
Dec 21, 2018 · 176 YONGE ST - Building permit17 103300Closed
Rev01: As per bubbled drawings and attached cover pageHVAC - Proposal to upgrade exiting kitchen exhaust system including replacement of exhaust fans, 6 kitchen exhaust hoods and ductwork including interior alterations (removal and reconstructing architectural finishes to allow for mechanical work) on concourse level, 4th floor, 8th floor, and 9th floor. The Bay.
Oct 24, 2018 · 176 YONGE ST - Building permit18 180035Closed
Proposed interior alterations to an existing retail store to create a tenspot vendor shop accesspry to the existing use.
Jun 21, 2018 · 176 YONGE ST - Building permit18 147887Closed
Proposal for interior alterations to the service level sub-basement of existing department store. Tenant is 'HUDSONS BAY COMPANY'
May 10, 2018 · 176 YONGE ST - Building permit18 149442Closed
Proposal for installation of premises isolation backflow preventer on the incoming dcw service #2
May 4, 2018 · 176 YONGE ST - Zoning review18 127777 LTOClosedMar 12, 2018 · 176 YONGE ST
- Zoning review18 124430 LTOClosedMar 5, 2018 · 176 YONGE ST
- Building permit15 192866Cancelled
Plumbing - Proposal for interior alterations of existing Godiva Chocolates shop-in-shop located on level B1 HBC store.
Feb 7, 2018 · 176 YONGE ST - Building permit17 225053Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the first storey east elevation. The proposed sign is 1.22 metres vertically by 2.13 metres horizontally at a height of 3.69 metres above grade.**LENA**
Feb 6, 2018 · 176 YONGE ST - Zoning review17 269023 ZZUClosedNov 29, 2017 · 176 YONGE ST
- Building permit17 252279Permit Issued
Proposed interior alterations to retail store (David's Tea).
Nov 7, 2017 · 176 YONGE ST - Building permit17 244512Closed
Proposed Backflow Prevention Devices (Water only) on the incoming DCW Service
Nov 1, 2017 · 176 YONGE ST - Building permit17 239452Closed
Proposed installation of premises isolation backflow preventer on the incoming fire service.
Oct 20, 2017 · 176 YONGE ST - Zoning review17 223642 LTOClosedAug 28, 2017 · 176 YONGE ST
- Building permit17 212802Closed
Interior alterations to existing retail store (The Hudsons Bay) for new fitting rooms
Aug 24, 2017 · 176 YONGE ST - Zoning review17 196735 LTOClosedJul 12, 2017 · 176 YONGE ST
- Zoning review17 166626 LTOClosedMay 26, 2017 · 176 YONGE ST
- Building permit17 154748Closed
Proposal for interior alterations to ground floor retail space in existing mercantile building. Tenant is Hudson Bay (sunglass hut).
May 10, 2017 · 176 YONGE ST - Building permit16 190815Closed
Proposal to demolish and reconstruct Toronto Eaton Centre Pedestrian Bridge, which connects TEC Galleria to HBC /Saks. Bridge spans over Queen St. W. ROW. Include sinterior alterations to TEC bridge connection to galleria at Level 2 and 3, as well as Level 3 of HBC/Saks.
May 9, 2017 · 176 YONGE ST - Building permit17 139562Closed
Removal of interior floor, wall and ceiling finishes in vicinity of pedestrian bridge opening, and related electrical work. TEC Pedestrian Bridge. Also see related demolition permits.
Apr 13, 2017 · 176 YONGE ST - Zoning review17 102518 LTOClosedJan 10, 2017 · 176 YONGE ST
- Zoning review16 251711 LTOClosedNov 16, 2016 · 176 YONGE ST
- Zoning review16 246927 LTOClosedNov 4, 2016 · 176 YONGE ST
- Building permit16 211522Approved
Proposed alternative solution to pressurize the entire volume of the proposed bridge in lieu of pressured smoke control measure N vestibule at one of the bridge and to provide fire safety measures in lieu of a swinging e-gress door in the rolling fire shutter at the TEC end of the bridge.
Aug 23, 2016 · 176 YONGE ST - Building permit15 196684Closed
Revision # 01 - To the layout of the existing grocery store. Proposal for interior alterations on the basement level, grocery store with related seating "Pusateri's Fine Foods"
Aug 19, 2016 · 176 YONGE ST - Building permit15 266661Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display 29 static non-illuminated overhanging structure signs and 7 static illuminated wall signs. **SAKS FIFTH AVENUE HUDSONS BAY**
Aug 10, 2016 · 176 YONGE ST - Building permit15 213747Closed
REV #1-REVISE LAYOUT, ADD ACCESSIBLE W/C, ADD FINISHESProposal for interior alterations to the 2nd floor of existing retail store for new personal service shop - "SFA Salon"
Jul 7, 2016 · 176 YONGE ST - Building permit16 144480Closed
Proposal for interior alterations to existing retail unit on the 3rd floor of the Eaton's Centre - "Dior Saks Toronto"
Jun 10, 2016 · 176 YONGE ST - Zoning review16 143810 LTOClosedApr 21, 2016 · 176 YONGE ST
- Zoning review16 125237 LTOClosedMar 9, 2016 · 176 YONGE ST
- Zoning review16 100954 ZMPClosedJan 5, 2016 · 176 YONGE ST
- Building permit15 123105Closed
REVISION 03 - modifies, alters, adds, deletes, clarifies, and corrects layout.
Nov 17, 2015 · 176 YONGE ST - Building permit15 246575Closed
Proposal for interior alterations to relocate the security office and expand the locker room located on the basement level - Hudson's Bay Company
Nov 10, 2015 · 176 YONGE ST - Building permit15 237494Closed
Interior alterations to portion of ground floor at Saks Queen St for Louis Vuitton.
Nov 6, 2015 · 176 YONGE ST - Building permit15 191279Closed
Interior alterations for a new restaurant in the basement, ground, and 2nd floor of Saks Fifth Ave. Tenant - "Oliver & Bonacini Restaurant".
Sep 30, 2015 · 176 YONGE ST - Zoning review15 210537 LTOClosedAug 21, 2015 · 176 YONGE ST
- Building permit15 155100Closed
Proposal to install additional structural support to existing TTC station entrance stairs within existing "The Bay" building.
May 28, 2015 · 176 YONGE ST - Building permit15 127584Closed
interior alterations to retail space within the Bay, "Nespresso" lower level adjacent to Seasonal department
Mar 30, 2015 · 176 YONGE ST - Building permit14 154189Closed
REV #1-REVISE SCOPE FOR 2ND & 5TH FLOORProposal for interior alterations to floors 2, 4, 5, 6 retail store - "The Bay"
Oct 15, 2014 · 176 YONGE ST - Building permit14 181376Closed
Proposal for interior alterations to the basement, first, and third for "The Bay" - Phase II, Phase II linked to 14-154189
Sep 10, 2014 · 176 YONGE ST - Building permit14 173911Closed
To erect and display one illuminated wall sign. Already approved by variance # 13-255826. **Hudson's Bay**
Jun 16, 2014 · 176 YONGE ST - Building permit14 145112Closed
Proposal to install a deck on the roof of existing multiple unit building.
May 8, 2014 · 176 YONGE ST - Building permit13 272771Closed
To complete interior alterations (5596 m2) to the 7th floor of the "The Bay" retail store.
Jan 21, 2014 · 176 YONGE ST - Zoning review13 255826 ZSVClosedOct 24, 2013 · 176 YONGE ST
- Building permit13 246243Closed
Proposal for interior demolition to the 7th floor of existing retail store - "The Bay"
Oct 18, 2013 · 176 YONGE ST - Zoning review13 233972 ZSVCancelledSep 11, 2013 · 176 YONGE ST
- Building permit13 159200Closed
To erect and display six illuminated wall signs, two on the northerly elevation, two on the easterly elevation and two on the southerly elevation of second storey of building, in conjunction with a commercial company. **Hudsons Bay**
May 24, 2013 · 176 YONGE ST - Building permit13 143813Closed
Proposal for interior alterations to the basement level - Tenant is "The Bay - U.S. Vision"
May 10, 2013 · 176 YONGE ST - Building permit13 118365Closed
HVAC - Proposal for interior alterations on the 6th floor and in part of the basement of existing multi-storey retail store (The Bay). The basement work will include HVAC. See 13-111487 WNP.
May 10, 2013 · 176 YONGE ST - Zoning review13 153817 ZSVClosedApr 19, 2013 · 176 YONGE ST
- Building permit13 123451Closed
HVAC - Proposal for interior alterations to the main, 2nd & 3rd floors of existing retail store - "The Bay"
Mar 15, 2013 · 176 YONGE ST - Zoning review13 126040 ZPRClosedFeb 27, 2013 · 176 YONGE ST
- Building permit12 123173Closed
Revision to include additional space on the 8th floor, in which existing use (Culinary School) area is to remain "Oliver & Bonancini" (275m2)
Nov 13, 2012 · 176 YONGE ST - Building permit12 156032Closed
permit for interior alterations to existing retail space - second and third floor
May 30, 2012 · 176 YONGE ST - Building permit12 115311Closed
permit for interior demolition of existing retail space - floors 2 and 3 - The BAy
Mar 9, 2012 · 176 YONGE ST - Building permit11 311497Closed
Interior alterations to existing commercial space on the Lower level (below grade) and convert from retail to restaurant. 158 seats. Tenant - "Foodwares". Hudson's Bay Centre (Queen & Yonge)
Dec 7, 2011 · 176 YONGE ST - Zoning review11 272489 LTOClosedSep 12, 2011 · 176 YONGE ST
- Zoning review11 271191 LTOClosedSep 8, 2011 · 176 YONGE ST
- Building permit11 233078Inspection
Proposal for interior alterations to a portion of the ground floor level of existing retail store "The Bay"
Jul 18, 2011 · 176 YONGE ST - Building permit11 185388Closed
Proposal for interior demolition to a portion of the basement level of existing retail store "The Bay"
May 31, 2011 · 176 YONGE ST - Building permit11 185399Closed
Proposal to install 1 floor drain in existing retail space in the basement of "The Bay'. See related building permit 11 185388 BLD
May 12, 2011 · 176 YONGE ST - Building permit10 286111Closed
Proposal for interior alterations on 2nd floor (menswear section) of existing retail store "The Bay" (149m2).
Nov 12, 2010 · 176 YONGE ST - Building permit10 276741Closed - Dormant
HVAC - This is for interior alterations to the North East corner of the ground floor for a new "COACH" store. This proposal includes HVAC.
Oct 27, 2010 · 176 YONGE ST - Building permit10 273624Closed
Plumbing - This is for interior alterations to the third(3rd) floor washrooms for "THE BAY".
Oct 21, 2010 · 176 YONGE ST - Building permit10 227244Closed
Proposal for interior alterations on second floor of existing retail store "Hudson's Bay Company" (385m2). No HVAC or plumbing alterations.
Jul 28, 2010 · 176 YONGE ST - Building permit10 176484Closed
HVAC - Permit for interior algterations to existing retail store - ground floor - South East Corner of Floor, (Yonge St Side)
May 25, 2010 · 176 YONGE ST - Building permit10 165983Inspection
Proposal to lower sprinkler heads in retail store (The Bay) to accomodate new suspended ceiling.
May 11, 2010 · 176 YONGE ST - Building permit10 111335Inspection
Proposal for interior alterations to the third floor retail space (The Bay)
Feb 4, 2010 · 176 YONGE ST - Building permit09 152390Closed
interior alterations to existing retail store - floor 3 - The Hudson Bay Company.
Sep 2, 2009 · 176 YONGE ST - Building permit09 135573Closed
Interior demo of existing partions on the 3rd floor of existing retail store. The Bay.
May 25, 2009 · 176 YONGE ST - Building permit08 141598Closed
Plumbing - interior alterations to existing retail store - ground floor - The Bay - Cosmetics.
Apr 2, 2008 · 176 YONGE ST - Building permit07 270566Closed
HVAC - Interior alterations to fit out new coffee/take out on Lower Level Concourse - The Bay
Oct 22, 2007 · 176 YONGE ST - Consent (lot split)B0070/07TEYApproved
To obtain consent to an Operating Agreement having the effect of granting rights to use existing underground loading facilities for a period in ecxess of 21 years. No chnages to buildings or property layout are being proposed.
Sep 19, 2007 · 176 YONGE ST - Zoning review06 195803 ZSVCancelledDec 5, 2006 · 176 YONGE ST
- Zoning review06 191544 ZPRClosedNov 15, 2006 · 176 YONGE ST
- Zoning review04 201344 LTOClosedDec 16, 2004 · 176 YONGE ST
- Zoning review04 196988 LTOClosedDec 1, 2004 · 176 YONGE ST
- Zoning review04 189280 LTOClosedNov 8, 2004 · 176 YONGE ST
- Building permit04 178155Closed
Make interior alters to existing department store restaurant on the 8th floor (former bar and grill area)
Sep 30, 2004 · 176 YONGE ST - Building permit04 140636Closed
New interior alterations to 4th floor for the bay.
Sep 17, 2004 · 176 YONGE ST - Building permit04 144285Inspection
Plumbing - Interior alterations and drywall and paint on existing retail basement lower level. - Interior Alterations
Sep 1, 2004 · 176 YONGE ST - Building permit04 144299Inspection
Plumbing - Interior alterations on the main floor for bay company. - Interior Alterations
Jul 29, 2004 · 176 YONGE ST - Building permit04 142154Closed
Remove abandoned escalaters and fill in opening on ground and 2nd floor.
Jul 21, 2004 · 176 YONGE ST - Building permit04 147863Closed
Make interior alterations to portion of the 5th floor.
Jun 22, 2004 · 176 YONGE ST - Building permit03 174550Closed
make interior alters to portion of main floor of existing retail store.
Oct 3, 2003 · 176 YONGE ST - Building permit03 123166Closed
removal and replacement of a section of the concrete suspended slab above the areaway beneath the north sidewalk at richmond st.w. at the corner of yonge st and extending approx. 25 metres west from yonge st.
Jun 6, 2003 · 176 YONGE ST - Zoning review03 103968 LTOClosedJan 23, 2003 · 176 YONGE ST
- Zoning review02 168774 LTOClosedAug 29, 2002 · 176 YONGE ST
- Building permit02 139367Closed
Make interior alterations to portion of the basement floor of existing department store (The Bay)
May 30, 2002 · 176 YONGE ST - Building permit02 111622Closed
Make interior alterations to portion of the first floor of existing department store (The Bay) for Clarens Canada.
Feb 21, 2002 · 176 YONGE ST - Building permit02 105734Closed
make interior alterations to portion of lower level tenant: cadbury's historical
Jan 31, 2002 · 176 YONGE ST - Building permit01 178527Closed
Interior alterations at ground floor level 30M2 in existing department store
Sep 20, 2001 · 176 YONGE ST - Building permit00 359170Closed - Dormant
Install h.v.a.c. system for proposed cooking school in the basement. Also install kitchen exhaust system. cost incl. 00 - 355523 for h.v.a.c. portion only. Kitchen exhaust system - $300.00 fee
Dec 21, 2000 · 176 YONGE ST - Building permit00 355580Closed
install fixtures in basement- 1 d.w., 2 grease interceptors, 2 2 -compt. k.s., 2 k.s., 1 .f.d, 2 h.d. see bp#00-355523
Dec 5, 2000 · 176 YONGE ST - Building permit00 355523Closed
make interior alterations to portion of basement level for cooking school. 'Historical'
Dec 5, 2000 · 176 YONGE ST - Building permit00 354221Closed
install fixtures in basement- 7 k.s., 3 2-compt. k.s., 1 d.w., 6 h.d., 1 grease interceptor. see bp#00-329547 Tenant: Hudson's Bay Company. (The Bay) Historical
Nov 20, 2000 · 176 YONGE ST - Building permit00 341281Closed
Make interior alterations to portion of the first floor (south-west area) for retail store purposes. "historical"
Nov 16, 2000 · 176 YONGE ST - Building permit00 341318Closed
Make alterations and install partitions on portion of the 2nd floor retail store.. "historical"
Nov 6, 2000 · 176 YONGE ST - Building permit00 347150Closed
Make interior alterations to portion of basement.
Oct 19, 2000 · 176 YONGE ST - Building permit00 347136Closed
Make interior alterations to portion of basement
Oct 19, 2000 · 176 YONGE ST - Building permit00 329547Closed
Make interior alterationss by building new display drywall partition walls in basement for retail area. Tenant: Hudson's Bay Company. (The Bay) Historical (w24)
Sep 5, 2000 · 176 YONGE ST - Zoning review00 035925 ZSVClosedAug 24, 2000 · 176 YONGE ST
- Zoning review00 327617 000ClosedAug 11, 2000 · 176 YONGE ST
- Zoning review00 012456 LTOClosedApr 25, 2000 · 176 YONGE ST
- Zoning review96 025421 LTOClosedAug 28, 1996 · 176 YONGE ST
- Zoning review95 024698 LTOClosedFeb 24, 1995 · 176 YONGE ST
- Zoning review95 024697 LTOClosedFeb 24, 1995 · 176 YONGE ST
- Zoning review92 025056 LTOClosedJan 13, 1992 · 176 YONGE ST
- Zoning review90 028850 LTOClosedSep 27, 1990 · 176 YONGE ST
- Zoning review87 029835 LTOClosedJan 28, 1987 · 176 YONGE ST
- Zoning review85 027061 LTOClosedNov 18, 1985 · 176 YONGE ST
Check before you build
Site-specific exception 900.11.10(1834)
Needs a closer look5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 366 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 276 of former City of Toronto By-law 438-86
- Older by-law E
On 401 Bay St., 160 Yonge St. and 176 Yonge St., former City of Toronto by-laws 998-88, 74-93, and 1994-0605 and City of Toronto by-law 460-2006.
Lot facts
- Area
- 7,218 m²
- Frontage
- 64.3 m
- Depth
- 113.3 m
- Street
- Yonge St
- Corner lot
- Yes, also on Richmond St W113.3 m along it
- Public lane
- None
- House footprint
- 2,804 m²
- Back yard
- 15.3 mhouse to rear lot line
- Side yards
- 0 m and 0.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 23house, garage, sheds
- Max height
- 76 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 224. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Queen Street West, Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 12.0 (c8.0; r11.7) SS1 (x1834) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%12 of 12 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 8
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 289 m away - Minor varianceApproved
To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.
141 ADELAIDE ST W · Jan 14, 2026 · 487 m away - Minor varianceApproved
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
89 CHURCH ST · Jan 15, 2025 · 394 m away - Minor varianceApproved
To permit a place of amusement (arcade) use on this subject lot.
247 YONGE ST · Jan 8, 2025 · 347 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.
71 KING ST E · Dec 11, 2024 · 447 m away
Latest activity nearby
- Building permit
Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor
40 KING ST W · Nov 23, 2026 · 267 m away - Building permit
Proposed interior fit-out for new tenant 'SMART & BIGGAR'.
40 KING ST W · Nov 20, 2026 · 267 m away - Building permit
Proposed interior alterations Building, plumbing and HVAC work to tenant space.
151 YONGE ST · Nov 20, 2026 · 120 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 262 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 255 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 267 m away - Building permit
PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.
40 KING ST W · Nov 18, 2026 · 267 m away - Building permit
PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING.
40 KING ST W · Nov 18, 2026 · 267 m away - Building permit
Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system
1 ADELAIDE ST E · Nov 18, 2026 · 228 m away - Building permit
Proposal for interior alterations in an existing office suite.
333 BAY ST · Nov 17, 2026 · 173 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station1 min walk
- Nearest TTC stop
- Richmond St West at Yonge St - Queen Station1 min walk
- Nearest cycling route
- Richmond St WCycle Track, 1 min walk
- Nearest traffic count
- 7,320 vehicles in 8 hQueen St W: Yonge St - James St, 50 m away, Dec 18, 2018
- Serious collisions within 500 m
- 162021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 2 with cyclists
- Parks
- Cloud Gardens1 min walk
- Trinity Square5 min walk
- Courthouse Square Park6 min walk
Schools within 1 km
- VICTORIA STREET LINC English Public 3 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.