Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 176 St Clarens Ave
176 St Clarens Ave is on a 7.3 m by 34.3 m lot on St Clarens Ave in Dufferin Grove. The zoning is R.
The City has 9 records on this lot since 2005. That is more than at 99% of Toronto houses. In 2017, a building permit was filed: "Proposal to convert existing 2 unit dwelling to a 4 unit dwelling - no interior contsruction. scope of work includes the addition of a rear fire escape to…". Status: closed. In 2011, a Committee of Adjustment application was filed: "To make interior alterations to increase the number of units in the existing converted dwelling from two to four, including the use of the basement". Status: closed. In 2009, a building permit was filed: "First revision to existing building permit - revision to alter windows on south elevation and doors at front - proposal to reconstruct portion of 3rd floor…". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open (the tallest up to 7 storeys). Lansdowne station is a 14-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention multiplexModerateFree check
- 1 by-law investigation closed in the last two yearsLow
- A garden suite may lack room for its fire access pathLowFree check
- 1 development application open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention multiplex
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Records mention multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-10-20 | By-law investigation25 242468 PRS 00 IR | Property Standards | Closed | |
| 2017-08-08 | Building permit16 135411 | Proposal to convert existing 2 unit dwelling to a 4 unit dwelling - no interior contsruction. Scope of work includes the addition of a rear fire escape to service the 2nd and 3rd floors. | Closed | |
| 2011-09-28 | Minor varianceA0494/11TEY | To make interior alterations to increase the number of units in the existing converted dwelling from two to four, including the use of the basement. | Approved | |
| 2011-04-14 | Zoning review11 175039 ZZC | No description on file | Closed | |
| 2009-07-16 | Building permit06 176145 | FIRST Revision to existing building permit - revision to alter windows on south elevation and doors at front - Proposal to reconstruct portion of 3rd floor roof to create more headroom.Ron Hatcher (owner) 416-530-0404 | Closed | |
| 2007-10-31 | Minor varianceA0136/08TEY | CLOSED FILE - JULY 3, 2009 - ISSUED REFUND FEE LESS$100 NO NOTICE MAILED - NO INSTRUCTION FROM APPLICANT | Pending | |
| 2007-10-15 | Zoning review07 269785 ZPR | No description on file | Closed | |
| 2007-03-30 | Zoning review07 130073 ZPR | No description on file | Closed | |
| 2005-03-02 | Building permit05 105353 | Recontruct a front veranda construct a new walk-out and a new rear deck plus interior alterations | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex
- Garden suite: needs a closer look
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
A garden suite may lack room for its fire access path
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 108 m²
- Back yard
- 15.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 7 storeys
- In the Lansdowne station area
- 38 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Assault: 1.9 times the Toronto median
- Theft over $5,000: 1.9 times the Toronto median
- Robbery: 1.6 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Dufferin Grove neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Lansdowne StationNearest station14 min walk
- College St at Lansdowne AveNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- Saint Frere Andre Secondary SchoolSchool3 min walk
- Toronto Ouest Secondary SchoolSchool3 min walk
- Brock Jr Public SchoolSchool3 min walk
- St Helen Catholic Elementary SchoolSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31224.5
- Robberycity median 69.5111.3
- Auto theftcity median 192.6111.3
- Theft over $5,000city median 46.187.5
- Break and entercity median 172.8270.3
- Theft from vehiclescity median 188.1278.3
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist