HousePrecheckCheck an address

176 Cherry StToronto · zoning, lot size and permit records

131.7 × 467.4 m54,416 m²on Cherry St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 251538 (EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027, 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
131.7 m frontage467.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (98% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 104324 (Proposal for a temporary air supported structure to be erect January 15, 2016 and remov..., 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (25% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 251538 (EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 251538Examiner's Notice Sent

    EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027.

    Oct 8, 2026 · 176 CHERRY ST
  • Zoning review25 238152 LTOClosed
    Oct 10, 2025 · 176 CHERRY ST
  • Zoning review25 224095 LPRApplication On Hold
    Sep 11, 2025 · 176 CHERRY ST
  • Zoning review25 192397 LPRCancelled
    Jul 11, 2025 · 176 CHERRY ST
  • Zoning review24 241161 LPRClosed
    Nov 20, 2024 · 176 CHERRY ST
  • Building permit16 142957Closed

    Revision to concrete foundations with reinforcements.Construct an elevated terrace to an existing outdoor entertainment facility. Tenant - "Cabana Pool Lounge". Also, refer to admin permit at 11 POLSON ST - 16 142968 BLD.

    Aug 8, 2017 · 176 CHERRY ST
  • Building permit14 253299Closed

    Construct a second storey accessory admin office building over existing womens's washroom facility to an existing outdoor entertainment facility. Tenant: Cabana Pool Lounge

    Oct 31, 2016 · 176 CHERRY ST
  • Building permit16 104324Inspection

    Proposal for a temporary air supported structure to be erect January 15, 2016 and removed June 16, 2016, Tenant: "Soccerworld @ The Docks"

    May 11, 2016 · 176 CHERRY ST
Show 10 older records
  • Zoning review14 216260 LPRClosed
    Sep 4, 2014 · 176 CHERRY ST
  • Building permit07 257000Closed

    addition to a temporary air supported structure

    Oct 4, 2007 · 176 CHERRY ST
  • Building permit05 165668Cancelled

    Construction of a temporary stage, erected date: Aug 11, 05 and dismount on August 15, 05

    Jul 28, 2005 · 176 CHERRY ST
  • Building permit04 101821Cancellednew building

    Erect an Temperory Air suppported structure approximately 61.5 x 36 x 11 m on existing concrete footings for all season use. Erected between October and April. APPLICANT TO SIGN RED NOTATIONS ON PLAN

    Jan 12, 2004 · 176 CHERRY ST
  • Zoning review01 124989 000Closed
    Apr 5, 2001 · 176 CHERRY ST
  • Building permit00 335708Closednew building

    Construct air supported structure for indoor volleyball. Temperory structure from October to April - see letter attached from applicant.

    Oct 6, 2000 · 176 CHERRY ST
  • Zoning review00 012194 LTOClosed
    Feb 22, 2000 · 176 CHERRY ST
  • Building permit99 108230Cancelled

    Erect 3 temporaty tents: 60'x300' push pole certification# 955007 , 80'x310' push pole certification# 9855003 and 98'x330' Hoecker certification# 9855013. To be erected October 30th, 1999, and dismantle October 31, 1999.

    Nov 8, 1999 · 176 CHERRY ST
  • Building permit98 016762Closed

    CONSTRUCT AN "H" SHAPED CONCRETE WALL FOR ROCK CLIMBING PURPOSES. (JC/PM FAMILIAR) INJUNCTION EDC

    Jun 5, 1998 · 176 CHERRY ST
  • Building permit98 014809Closed

    CONSTRCT 1 STOREY BUILDING ON NORTH-WEST ELEVATION FOR WASHROOMS AND CHANGE ROOM AREA. ALSO INSTALL TEMPORARY (SEASONAL) STRUCTURE (HAUNTED HOUSE). MAKE INTERIOR ALTERATIONS TO EXISTING GOLF CONTROL BUILDING. EDC/WS

    Apr 3, 1998 · 176 CHERRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
54,416 m²
Frontage
131.7 m
Depth
467.4 m
Street
Cherry St
Corner lot
No
Public lane
None
House footprint
4,324 m²roof up to 11.5 m
Back yard
10 mhouse to rear lot line
Side yards
7.4 m and 81.7 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new building which is to be used as a recreation centre (Basketball Courts).

      185 CHERRY ST · May 14, 2008 · 328 m away
    • Minor varianceApproved

      To permit the specific use of the Royal Canadian Yacht Club City Station on the subject property.

      130 CHERRY ST · Mar 19, 2008 · 328 m away

    Latest activity nearby

    • Zoning review

      Not Started

      55 POLSON ST · Nov 17, 2026 · 97 m away
    • Building permit

      1 Ground Sign***PORSHE***

      190 CHERRY ST · Nov 13, 2026 · 195 m away
    • Building permit

      1 Ground Sign****Porsche****

      190 CHERRY ST · Oct 19, 2026 · 195 m away
    • Building permit

      EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027.

      176 CHERRY ST · Oct 8, 2026 · 118 m away
    • Building permit

      Proposal to install one custom 15m*55m temporary tent [(1) 15m x 45m + (1) 15m x 10m] for a wedding reception from Oct 16 to Oct 20.

      11 POLSON ST · Sep 25, 2026 · 226 m away
    • Zoning review

      Notice Sent

      190 CHERRY ST · Sep 8, 2026 · 195 m away
    • Minor variancePending

      Proposal to reduce the parking requirement for the existing car dealership (Porsche)

      190 CHERRY ST · Sep 8, 2026 · 195 m away
    • Zoning review

      Closed

      190 CHERRY ST · May 19, 2026 · 195 m away
    • Building permit

      REVISION TO 25 249248 DST 00 DS - Change in ground sign locationA proposal to erect and display 3 wall signs and one ground sign, all displaying static copy.**PORSCH (DOWNTOWN TORONTO)

      190 CHERRY ST · Apr 9, 2026 · 195 m away
    • Building permit

      Installation of 3 eloctromagnetic locks on level 3 of the new motor vechicle dealership

      190 CHERRY ST · Apr 7, 2026 · 195 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station33 min walk
    Nearest TTC stop
    Commissioners St at Cherry St East Side7 min walk
    Nearest cycling route
    Martin Goodman / Waterfront TrlMulti-Use Trail, 3 min walk
    Nearest traffic count
    5,350 vehicles in 14 hPolson St / Cherry St / Martin Goodman Trl, 240 m away, Oct 6, 2026
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Biidaasige Park3 min walk
    Jennifer Kateryna Koval's'kyj Park4 min walk
    Cherry Beach Clarke Beach Park10 min walk

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.