HousePrecheckCheck an address

175 Moore AveToronto · zoning, lot size and permit records

Open space · OR98.2 × 176.3 m15,321 m²on Kingsmere Rdcorner, also on Moore Ave

Not a home

Moorevale Park - Prop A

The City of Toronto's real estate inventory lists Moorevale Park - Prop A here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 18 226727 (Proposal for interior alteration to existing Parks Clubhouse Building & Public washroom..., 2019, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
98.2 m frontage176.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 18 226727 (Proposal for interior alteration to existing Parks Clubhouse Building & Public washroom..., 2019, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit18 226727Inspection

    Proposal for interior alteration to existing Parks Clubhouse Building & Public washrooms. work includes replacment of washrooms and changerooms, make public washrooms accessible, new lawn bowling club area with kitchenette, waterproof basement, mechanical & electrical upgrades, replace doors & windows and new accessible exterior ramps.

    Feb 13, 2019 · 175 MOORE AVE

Lot facts

Area
15,321 m²
Frontage
98.2 m
Depth
176.3 m
Street
Kingsmere Rd
Corner lot
Yes, also on Moore Ave176.3 m along it
Public lane
None
House footprint
242 m²roof up to 12.5 m
Back yard
81.7 mhouse to rear lot line
Side yards
33.3 m and 47.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: oak, red (131 cm), elm, siberian (84 cm), maple, sugar (65 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%25 of 27 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    131 ROSE PARK DR · Nov 13, 2026 · 255 m away
  • Building permit

    Rear existing elevated deck caisson replacement

    195 HUDSON DR · Nov 9, 2026 · 196 m away
  • Building permitsecondary suite

    Proposed interior alterations to create a basement suite.

    325 MOUNT PLEASANT RD · Oct 2, 2026 · 299 m away
  • Building permit

    Admin partywall permit in conjunction with 26 183577 BLD, 323 Mount Pleasant Rd.

    325 MOUNT PLEASANT RD · Oct 2, 2026 · 299 m away
  • Minor varianceApproved

    To construct a new rear two-storey detached ancillary building (containing one garden suite) with basement, a side (west) cantilevered second storey, and a side (north) one-car carport structure. Also, to reconstruct the side (west) driveway, and demolish the existing carport (within City¿s Right-of-Way), abutting Mount Pleasant Road. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    112 ROSE PARK DR · May 6, 2026 · 247 m away
  • Building permit

    Install sanitary line backwater valve

    311 HEATH ST E · May 5, 2026 · 151 m away
  • Building permit

    Drain - Proposal for underpinning and interior alterations to finish basment

    152 MOORE AVE · Apr 27, 2026 · 121 m away
  • Building permit

    Revision 01: Revision to permit to include addition of utility sink

    127 ROSE PARK DR · Feb 26, 2026 · 259 m away
  • Building permit

    Proposal for rear addition and interior alterations.

    184 MOORE AVE · Feb 17, 2026 · 82 m away
  • Building permitmultiplex, secondary suite

    REV02: RevisionREV01: Proposed revision to layout change and windowsProposal for a rear ground floor addition, rear 2nd floor addition, rear deck, second floor balcony, and interior alterations to convert existing dwelling to 2 units, partial basement underpinning See also 24 102945 ZAP.

    298 ST CLAIR AVE E · Feb 11, 2026 · 295 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
St Clair Station17 min walk
Nearest TTC stop
Welland Ave at Heath St East2 min walk
Nearest cycling route
Moore AveSharrows - Wayfinding, 1 min walk
Nearest traffic count
8,733 vehicles in 8 hWelland Ave / Moore Ave / Moorevale Park Trl, 100 m away, Sep 21, 2017
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Moorevale Park1 min walk
Moore Park Ravine2 min walk
Loring - Wyle Parkette5 min walk

Schools within 1 km

  • SUNNYBROOK SCHOOL Private 9 min walk
  • OUR LADY OF PERPETUAL HELP CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • GREENWOOD COLLEGE SCHOOL Private 13 min walk
  • WHITNEY JR PUBLIC SCHOOL English Public 13 min walk
  • TORONTO PREP SCHOOL Private 14 min walk
  • HODGSON MIDDLE SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.