Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 175 Marion St
175 Marion St is on a 7.5 m by 39 m lot on Marion St in High Park-Swansea. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 8 records on this lot since 2008. That is more than at 98% of Toronto houses. In 2024, a building permit was filed: "Convert existing single family dwelling into 4 units". Status: refusal notice. In 2023, a Committee of Adjustment application was filed: "To convert the existing two-and-one-half-storey detached dwelling from a one-unit dwelling into a five-unit dwelling (1 primary unit and 4 secondary units)". Status: closed. In 2015, a building permit was filed: "Proposal to construct a third floor deck on existing two and a half storey house". Status: closed. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 51 minor variance applications in the last 10 years and approved 96%. The nearest TTC stop is Roncesvalles Ave at Marion St South Side, a 2-minute walk.
Summary
What the City's records show on this house
- 1 open order or by-law investigationSerious
- Records mention multiplex, second unitModerateFree check
- Zoning not in By-law 569-2013Moderate
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open order or by-law investigation
- Records mention multiplex, second unit
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
1 open order or by-law investigation
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Records mention multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-06-24 | Building permit24 169162 | Convert existing single family dwelling into 4 units | Refusal Notice | |
| 2023-01-11 | Minor varianceA1088/22TEY | To convert the existing two-and-one-half-storey detached dwelling from a one-unit dwelling into a five-unit dwelling (1 primary unit and 4 secondary units). | Approved | |
| 2022-04-13 | Zoning review22 134155 ZAP | No description on file | Closed | |
| 2020-10-30 | Zoning review20 213199 ZZC | No description on file | Cancelled | |
| 2017-03-08 | Building order17 126218 COU 00 VI | Order Issued Change of Use: Construction without a permit. Building addition units and kitchen and rooms. | Order Issued | |
| 2015-05-07 | Building permit15 150366 | Proposal to construct a third floor deck on existing two and a half storey house. | Closed | |
| 2014-12-05 | Building permit14 260875 | install MAINLINE FULLPORT backwater valve | Closed | |
| 2008-07-28 | Building permit08 182090 | Interior alterations to convert back to Single Family Dwelling status. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: second unit
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 133 m²
- Back yard
- 15.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 28 suite and multiplex permits within 300 m in 10 years
- 51 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 6 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
High Park-Swansea neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bloor GO StationNearest station29 min walk
- Roncesvalles Ave at Marion St South SideNearest TTC stop2 min walk
- Sunnyside AveNearest cycling route2 min walk
- Garden Avenue Jr Public SchoolSchool5 min walk
- Fern Avenue Jr & Sr Public SchoolSchool9 min walk
- Mary Mother of God SchoolSchool9 min walk
- St Vincent de Paul Catholic Elementary SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3465.8
- Robberycity median 69.546.6
- Shootingscity median 10.57.8
- Auto theftcity median 192.689.3
- Theft over $5,000city median 46.123.3
- Break and entercity median 172.8229
- Theft from vehiclescity median 188.1128.1
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist