HousePrecheckCheck an address

175 Alexmuir BlvdToronto · zoning, lot size and permit records

Also 195 Alexmuir Blvd, 201 Alexmuir Blvd

Residential multiple · RM (au269.0) (x390)≈ 280.5 × 186.3 m34,603 m²on Alexmuir Blvd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 3.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 280.5 m frontage≈ 186.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit19 126858Closed

      Proposal for post fire repairs to restore the dwelling to original conditions. Work includes replacement of fire damaged main floor joists

      Mar 22, 2019 · 175 ALEXMUIR BLVD

    Check before you build

    • Site-specific exception 900.6.10(390)

      Needs a closer look

      7 site-specific rules apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.6.10(390)Applies

    These parts of the exception apply to this lot's address.

    1. Rule A

      The minimum building setback from a lot line that abuts Alexmuir Blvd. is 12.0 metres

    2. Rule B

      The minimum building setback from a side lot line or rear lot line is: (i) 12.0 metres if the lot line abuts a lot in an RD, RS or RT zone; and (ii) 7.5 metres in other cases

    3. Rule C

      The maximum lot coverage is 30%

    4. Rule D

      A minimum of 50% of the lot must be used for soft landscaping

    5. Rule E

      Below grade structures are permitted in all required yards if they are not closer to a lot line that abuts a street than a distance equivalent to the vertical distance from the surface of the lowest floor of the structure to the average elevation of grade at the front lot line

    6. Rule F

      A building used for the storage of waste may be located in a yard that abuts a street , if it is a minimum of 1.5 metres from the lot line and the building is entirely enclosed

    7. Rule G

      These lands must comply with exception 900.6.10(473).

    By-law 569-2013, Chapter 900

    Lot facts

    Area
    34,603 m²
    Frontage
    280.5 mestimated, irregular lot
    Depth
    186.3 mestimated, irregular lot
    Street
    Alexmuir Blvd
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    33%
    • Zone RM (au269.0) (x390) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
    • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust shademaster (49 cm), honey locust shademaster (40 cm), honey locust shademaster (39 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Installation of new backwater valve

      51 HAVEN HILL SQ · Oct 29, 2026 · 248 m away
    • Building permit

      Proposal for interior alterations

      3 CLEADON RD · Jun 26, 2026 · 131 m away
    • Building permit

      Proposed interior alterationof load bearing wall removal

      12 LADY CHURCHILL CRT · Jan 5, 2026 · 245 m away
    • Building permit

      Full port main line back water valve

      220 ALEXMUIR BLVD · Oct 8, 2025 · 223 m away
    • Building permit

      Proposal to add a side ground floor entrance door and new side window on the second floor for this existing semi-detached SFD.

      116 HOMEDALE DR · Jun 12, 2025 · 228 m away
    • Building permit

      Repair of ventilation system & replacement of make-up air units.

      75 ALEXMUIR BLVD · Mar 20, 2024 · 221 m away
    • Building permit

      Proposed installation of Barrier free (Door hold-open device) & connection to fire alarm panel at 95 Alexmuir Boulevard (Alexmuir Jr. PS)

      95 ALEXMUIR BLVD · Feb 23, 2023 · 136 m away
    • Building permit

      bwv installation

      24 LADY CHURCHILL CRT · Aug 9, 2022 · 254 m away
    • Building permit

      Construct interior alterations to the individual washroom for the kindergarten room to conform to latest code requirements

      75 ALEXMUIR BLVD · Feb 3, 2022 · 221 m away
    • Building permit

      Installation of air conditioning in the gym - St. Marguerite Bourgeoys Catholic School

      75 ALEXMUIR BLVD · Jan 18, 2022 · 221 m away

    Neighbourhood: Agincourt North

    About the area around the lot, not the lot itself.

    Nearest station
    Agincourt GO Station48 min walk
    Nearest TTC stop
    Midland Ave at Kilcullen Castle Gate North Side7 min walk
    Nearest cycling route
    Finch Corridor TrlMulti-Use Trail, 7 min walk
    Nearest traffic count
    18,710 vehicles in 14 hMidland Ave / Kilcullen Castle Gt, 420 m away, Nov 16, 2024
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Alexmuir Park2 min walk
    Brimley Woods8 min walk
    Port Royal Park12 min walk

    Schools within 1 km

    • ALEXMUIR JR PUBLIC SCHOOL English Public 2 min walk
    • ST MARGUERITE BOURGEOYS CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
    • MIDLAND ADULT EDUCATION CENTRE English Separate 8 min walk
    • MILLIKEN PUBLIC SCHOOL English Public 12 min walk
    • ROYAL CROWN ACADEMIC SCHOOL Private 13 min walk
    • OUR LADY OF GRACE CATHOLIC ELEMENTARY SCHOOL English Public 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureAgincourt NorthMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home79%54%
    Population (2021)27,54016,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleAgincourt NorthCity median
    Assault276.9636.3
    Robbery106.869.5
    Shootings6.710.5
    Auto theft327192.6
    Theft over $5,00053.446.1
    Break and enter93.4172.8
    Theft from vehicles106.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.