HousePrecheckCheck an address

1730 Eglinton Ave EToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a1375) (x556)≈ 116.1 × 65.1 m5,109 m²on Eglinton Ave E

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: SloaneThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 116.1 m frontage≈ 65.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (24% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (17% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (5% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit10 147504Closed

    Installation of backflow preventor

    Apr 15, 2010 · 1730 EGLINTON AVE E
  • Zoning review05 102468 PLOClosed
    Jan 14, 2005 · 1730 EGLINTON AVE E
  • Building permit04 136473Closed

    SITE SERVICES

    May 31, 2004 · 1730 EGLINTON AVE E
  • Building permit03 132247Closednew building

    New 8 storey residential condo + 2 leveis of underground parking. for superstructure.

    Jan 20, 2004 · 1730 EGLINTON AVE E
  • Building permit03 132264Closed

    New foundation permit for 8 storey residential condo and 2 levels of under ground parking.

    Oct 23, 2003 · 1730 EGLINTON AVE E
  • Building permit03 170003Closed

    Underground Drains Original # 03 132 247

    Sep 11, 2003 · 1730 EGLINTON AVE E
  • Building permit03 132270Closed

    Shoring permit for 8 storey residential condo and 2 levels underground parking.

    Jul 18, 2003 · 1730 EGLINTON AVE E
  • Zoning review03 107956 PSPClosed
    Feb 12, 2003 · 1730 EGLINTON AVE E

Check before you build

  • Site-specific exception 900.7.10(556)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(556)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 64.20-A(50) of the City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
5,109 m²
Frontage
116.1 mestimated, irregular lot
Depth
65.1 mestimated, irregular lot
Street
Eglinton Ave E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
35%
  • Site and Area Specific Policy 064. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Sloane. The lot is inside the Sloane Major Transit Station Area approved by the Province (Site and Area Specific Policy 686). Source
  • Minimum frontage 30 m. Frontage is about 116.1 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 5,109 m²: meets the minimum. Source
  • Zone RA (f30.0; a1375) (x556) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
67%2 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitnew building

    Revision 01: Fire Alarm Drawing Revision for Maintenance Garage - Revision for Building Permit No. 24 155249 BLD 00 NBProposal to legalize existing multiple accessory buildings (temporary prefabricated structures) on the lot

    197 BERMONDSEY RD · Nov 17, 2026 · 283 m away
  • Building permit

    Proposal for building envelope repairs.

    1785 EGLINTON AVE E · Nov 10, 2026 · 262 m away
  • Zoning review

    Closed

    1700 EGLINTON AVE E · Nov 5, 2026 · 222 m away
  • Development application

    Site Plan Control Application proposes a six-storey residential apartment building containing28 rental units.

    40 SLOANE AVE · Oct 27, 2026 · 292 m away
  • Building permit

    install backwater valve

    57 HESKETH CRT · Aug 25, 2026 · 284 m away
  • Building permit

    Change of Use and interior alterations to basement to add sleeping/living room within building for proposed Place of Worship.

    95 JONESVILLE CRES · Aug 17, 2026 · 265 m away
  • Zoning review

    Notice Sent

    40 SLOANE AVE · Aug 6, 2026 · 280 m away
  • Minor varianceApproved

    To convert the existing building into a place of worship.

    95 JONESVILLE CRES · Jun 18, 2026 · 265 m away
  • Zoning review

    Closed

    75 JONESVILLE CRES · May 8, 2026 · 223 m away
  • Building permitsecondary suite

    Proposed interior alterations to existing basement for second suite.

    5 TINDER CRES · Mar 18, 2026 · 165 m away

Neighbourhood: Victoria Village

About the area around the lot, not the lot itself.

Nearest station
Sloane Station3 min walk
Nearest TTC stop
Sloane Station Eastbound Platform3 min walk
Nearest cycling route
Eglinton Ave EBike Lane, 1 min walk
Nearest traffic count
4,859 vehicles in 8 hSloane Ave / Trophy Dr / Tinder Cres, 220 m away, Feb 20, 2019
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Jonesville Allotment Gardens3 min walk
Warner Park4 min walk
Academy Soccer Field5 min walk

Schools within 1 km

  • SLOANE PUBLIC SCHOOL English Public 9 min walk
  • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureVictoria VillageMedian neighbourhood
Median household income (2020)$68,000$84,500
Households that own their home41%54%
Population (2021)17,36516,813
Homes built in 1960 or before29%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleVictoria VillageCity median
Assault591.2636.3
Robbery20.469.5
Auto theft285.4192.6
Theft over $5,00030.646.1
Break and enter208.9172.8
Theft from vehicles178.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.