Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
12 records on file: more than at 100% of Toronto houses (median 0).
- Building permit24 103349Closed
Proposal for interior alterations in Unit 400
Jan 19, 2024 · 171 JOHN ST - Building permit22 125852Closed
REV 01: proposal for new in-suite stairs added between the existing 2nd & 3rd floor levels.Proposal for interior alterations for a new office tenant in existing unit 200, located on the 2nd floor level. Scope of work is only for a portion of the 2nd floor level unit. (tenant - 'co:here')
Jun 6, 2022 · 171 JOHN ST - Building permit16 218280Closed
Interior alterations to existing office spaces on floors 3-5 (inclusive). Tenant - "Slack Corp".
Sep 15, 2016 · 171 JOHN ST - Building permit12 268663Closed
Proposal for interior alterations to existing 3rd and 4th floor of existing office building "Points International Ltd." (294m2)
Nov 1, 2012 · 171 JOHN ST - Building permit11 329459Closed
Extend office to entire Ground Floor - single tenant. Interior alterations to existing Law office on the ground floor. Tenant - "Addario Law Group".
Jun 25, 2012 · 171 JOHN ST - Building permit11 155455Closed
Interior alterations to existing commercial space on the 2nd floor for new salon/hair studio.
Apr 21, 2011 · 171 JOHN ST - Building permit10 127232Cancelled
Proposal to install a standpipe sytem in an existing 5 storey industrial building. See related building permit 09 194814 BLD.
Jun 30, 2010 · 171 JOHN ST - Building permit10 166824Cancelled
Sprinkler permit for 10 162513 BLD - permit for interior alterations to existing industrial space - floors 3, 4, 5 - Software Development Company - Points international
Jun 29, 2010 · 171 JOHN ST
Show 4 older records
- Building permit10 162513Closed
permit for interior alterations to existing industrial space - floors 3, 4, 5 - Software Development Company - Points international
May 5, 2010 · 171 JOHN ST - Building permit09 194814Closed
Proposal for interior alterations to all floors of an existing 5 storey industrial building. Building currently being used for software design and development.
Mar 5, 2010 · 171 JOHN ST - Building permit10 118294Closed
Alternative solution in connection with BLD 09 194814 in regards to some combustible building elements.
Feb 16, 2010 · 171 JOHN ST - Building permit03 184688Closed
Structural restoration to the complete building (5 floors). Existing and proposed: manufacturing
Nov 28, 2003 · 171 JOHN ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 882 m²
- Frontage
- 25.5 m
- Depth
- 35.2 m
- Street
- John St
- Corner lot
- No
- Public lane
- St Patricks Market, 25.1 m along it
- House footprint
- 733 m²roof up to 22.9 m
- Back yard
- 0.4 mhouse to rear lot line
- Side yards
- 0.2 m and 3.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%15 of 15 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 4
- Multiplex permits
- 5
- Development applications
- 19
Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit an entertainment facility-related use (interactive game show experience) located within a portion of the first storey of the existing four-storey building, in addition to the existing restaurant use (as approved under Building Permit 20 118020 BLD 00 BA) and existing recreational use (place of amusement, as approved under Minor Variance Decision A0903/23TEY). The existing office uses located on the second to fourth storeys will be maintained.
336 QUEEN ST W · Sep 2, 2026 · 360 m away - Minor varianceApproved
To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the west side.
34 SULLIVAN ST · Aug 12, 2026 · 326 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 663-2011), for an existing 36-storey mixed-use building, by enclosing the north side outdoor patio for the eating establishment (restaurant).
117 PETER ST · Jul 15, 2026 · 317 m away - Minor varianceApproved
To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.
333 QUEEN ST W · Apr 1, 2026 · 155 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).
52 PHOEBE ST · Mar 11, 2026 · 402 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
100 MCCAUL ST · Dec 16, 2026 · 254 m away - Zoning review
Closed
84 ST PATRICK ST · Nov 24, 2026 · 226 m away - Minor variancePending
In Process
165 JOHN ST · Nov 24, 2026 · 31 m away - Building permit
Interior Alteration of Existing Group D office- reconfigure existing office spaces, including dividing one room into two meeting rooms and opening another room to create an open workspace - 2nd Floor
190 SIMCOE ST · Nov 24, 2026 · 228 m away - Building permit
Proposed interior alterations of existing office for new model suite fit-out - UNIT 403
217 RICHMOND ST W · Nov 18, 2026 · 220 m away - Building permit
Proposed interior alterations of existing office to new model suite fit-out.
217 RICHMOND ST W · Nov 18, 2026 · 220 m away - Building permit
Proposal for interior alteration and adding new rear balcony and stairs to convert a single family semi detached dwelling to fourplex
14 SULLIVAN ST · Nov 16, 2026 · 281 m away - Zoning review
Closed
130 JOHN ST · Nov 10, 2026 · 245 m away - Building permit
1 wall sign.***NAWABS LEGENDARY BBQ***
228 QUEEN ST W · Nov 10, 2026 · 89 m away - Building permit
Proposal for interior alterations to convert existing retail store into a restaurant with greater than 30 seats.
241 QUEEN ST W · Nov 9, 2026 · 214 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- Osgoode Station5 min walk
- Nearest TTC stop
- Queen St West at John St1 min walk
- Nearest cycling route
- Stephanie StBike Lane - Contraflow, 1 min walk
- Nearest traffic count
- 11,836 vehicles in 14 hQueen St W / John St, 100 m away, Sep 9, 2025
- Serious collisions within 500 m
- 122021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 4 with cyclists
- Parks
- St. Patricks Square1 min walk
- Grange Park1 min walk
- Grasett Park6 min walk
Schools within 1 km
- OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 2 min walk
- OCAD UNIVERSITY - STUDENT CENTRE University 2 min walk
- OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 3 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 4 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 5 min walk
- OGDEN JR PUBLIC SCHOOL English Public 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.