HousePrecheckCheck an address

171 Erskine AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x912)30.4 × 57.0 m1,547 m²on Erskine Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 13 storeys, 47 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 264740 (Proposal to repair loose concrete for balcony slab edge and replace the guardrail surro..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
30.4 m frontage57.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 232916 PRS 00 IR (Property Standards, 2026); 26 170758 000 00 IR (Adequate Heat, 2026); 26 170757 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 264740 (Proposal to repair loose concrete for balcony slab edge and replace the guardrail surro..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (13 storeys, 47 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit26 264740Under Review

    Proposal to repair loose concrete for balcony slab edge and replace the guardrail surrounding the property.

    Nov 3, 2026 · 171 ERSKINE AVE
  • By-law investigation26 232916 PRS 00 IRClosed

    Property Standards

    Sep 4, 2026 · 171 ERSKINE AVE
  • By-law investigation26 170758 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 171 ERSKINE AVE
  • By-law investigation26 170757 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 171 ERSKINE AVE
  • Zoning review26 124495 LPRClosed
    Mar 4, 2026 · 171 ERSKINE AVE
  • Building permit11 143172Closed

    Backflow preventor

    Apr 12, 2011 · 171 ERSKINE AVE
  • Building permit00 158851Closed

    Balcony repairs and replacement of railings to all balconies at North and South elevation(50 balconies)

    Jun 15, 2000 · 171 ERSKINE AVE
  • Building permit00 143460Closed

    Alter openings and apply stucco facing to portion of the front elevation. Also apply stucco facing to a portion of South, East and West elevations.

    May 24, 2000 · 171 ERSKINE AVE

Check before you build

  • Site-specific exception 900.2.10(912)

    Needs a closer look

    1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(912)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law. [TO: 438-86; 12 (2) 193]

  2. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  4. Older by-law E

    On or between the odd numbered addresses of 133-141 Erskine Avenue, the odd numbered addresses of 165-171 Erskine Avenue, former City of Toronto by-law 20904

3 parts for other addresses
  • C On 107 Broadway Avenue, City of Toronto By-law 165-69
  • D On 15 Erskine Avenue, former City of Toronto by-law 195-67
  • F On the even numbered addresses of 140-144 Redpath Avenue, City of Toronto by-law 49-02.
By-law 569-2013, Chapter 900

Lot facts

Area
1,547 m²
Frontage
30.4 m
Depth
57 m
Street
Erskine Ave
Corner lot
No
Public lane
None
House footprint
378 m²roof up to 48.6 m
Back yard
20.7 mhouse to rear lot line
Side yards
6.8 m and 7.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
38 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x912) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: linden (57 cm), maple, norway (47 cm), maple, sugar (26 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
91%30 of 33 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
26

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 378 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 378 m away
  • Minor varianceApproved

    To alter the existing semi-detached dwelling by constructing a rear second storey addition.

    50 SHERWOOD AVE · May 21, 2026 · 457 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units.

    170 ROEHAMPTON AVE · Apr 1, 2026 · 354 m away
  • Minor varianceApproved

    To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.

    241 REDPATH AVE · Feb 19, 2026 · 159 m away

Latest activity nearby

  • Building permit

    Proposal to repair loose concrete for balcony slab edge and replace the guardrail surrounding the property.

    171 ERSKINE AVE · Nov 3, 2026 · 4 m away
  • Building permit

    Proposed to construct a new storage shed in the backyard

    121 SHERWOOD AVE · Oct 22, 2026 · 283 m away
  • Zoning review

    Notice Sent

    55 ELVINA GDNS · Oct 16, 2026 · 284 m away
  • Building permit

    Proposal to revert conditions to garage.

    304 KEEWATIN AVE · Oct 1, 2026 · 275 m away
  • Zoning review

    Closed

    282 KEEWATIN AVE · Sep 21, 2026 · 240 m away
  • Building permit

    Replace Domestic Hot and Cold Risers

    900 MOUNT PLEASANT RD · Sep 9, 2026 · 61 m away
  • Zoning review

    Closed

    894 MOUNT PLEASANT RD · Aug 21, 2026 · 127 m away
  • Zoning review

    Closed

    115 BROADWAY AVE · Aug 20, 2026 · 188 m away
  • Building permit

    Repair and rebuild front porch (same size) & roof alterations over existing den.

    304 KEEWATIN AVE · May 6, 2026 · 275 m away
  • Zoning review

    Closed

    241 REDPATH AVE · Apr 29, 2026 · 159 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station7 min walk
Nearest TTC stop
Mt Pleasant Rd at Erskine Ave1 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
23,967 vehicles in 14 hMount Pleasant Rd / Erskine Ave, 60 m away, Oct 30, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Broadway Avenue Parkette2 min walk
Redpath Avenue Parkette2 min walk
Dawn Redwood Park3 min walk

Schools within 1 km

  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 2 min walk
  • NORTHERN SECONDARY SCHOOL English Public 4 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 7 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 7 min walk
  • WILLOWDALE HIGH SCHOOL Private 8 min walk
  • EGLINTON JR PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.