HousePrecheckCheck an address

170 Attwell DrToronto · zoning, lot size and permit records

37.2 × 37.5 m1,316 m²on Dixon Rd

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 12 173182 (Installation of two electromagnetic locks, 2012, status Inspection); 00 160012 (Interior alterations to office building. HVAC and plumbing included. UNIT 620, 2000, status Inspection); 00 131862 (Interior alterations to existing office space '7th floor'. UNIT 460. HVAC and plumbing..., 2000, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
37.2 m frontage37.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2000

    Needs a closer look

    Still open in the City's records: 12 173182 (Installation of two electromagnetic locks, 2012, status Inspection); 00 160012 (Interior alterations to office building. HVAC and plumbing included. UNIT 620, 2000, status Inspection); 00 131862 (Interior alterations to existing office space '7th floor'. UNIT 460. HVAC and plumbing..., 2000, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 198484Closed

    Proposal for Interior Alteration - build a conference room, storage room, IT room, meeting room, 5 private offices and a staff room.

    Jul 28, 2025 · 170 ATTWELL DR
  • Building permit24 118722Closed

    INSTALL 2 NEW WALL SIGNS FOR REBRAND FROM HSBC TO RBC.****RBC****

    Mar 1, 2024 · 170 ATTWELL DR
  • Zoning review23 141101 LPRApplication On Hold
    May 3, 2023 · 170 ATTWELL DR
  • Building permit17 191749Closed

    Proposal to construct interior alterations to lobby and entrance of existing office

    Oct 13, 2017 · 170 ATTWELL DR
  • Building permit17 237523Cancelled

    To erect and display one illuminated ground sign displaying electronic static copy on the southerly property frontage, measuring 4.27 m by 1.52 m at a height of 3.96 m. **SKYWAY BUSINESS PARK**

    Sep 22, 2017 · 170 ATTWELL DR
  • Building permit17 191759Closed

    Maglock permit for entrance door

    Aug 2, 2017 · 170 ATTWELL DR
  • Building permit14 120153Closed

    To erect and display two illuminatred wall signs on the south-westerly & south-easterly elevation of building wall. **HSBC**

    Apr 16, 2014 · 170 ATTWELL DR
  • Building permit13 225264Cancelled

    NOTICE OF CANCELLATION - Interior alterations to an existing bank branch (HSBC Bank) and new exit door and stairs/ ramp.

    Aug 23, 2013 · 170 ATTWELL DR
Show 11 older records
  • Building permit12 173182Inspection

    Installation of two electromagnetic locks

    Jun 12, 2012 · 170 ATTWELL DR
  • Building permit11 323238Closed

    interior alterations to second floor for offices

    Feb 22, 2012 · 170 ATTWELL DR
  • Zoning review12 114164 LPRClosed
    Jan 30, 2012 · 170 ATTWELL DR
  • Building permit11 286166Closed

    Demolition of interior nonloadbearing / nonrated walls on second floor so as to create a future open floor office, Unit 200

    Oct 4, 2011 · 170 ATTWELL DR
  • Building permit05 163289Closed

    Interior alterations to an existing bank branch. **HSBC Bank**

    Sep 8, 2005 · 170 ATTWELL DR
  • Building permit01 205132Closed

    REVISION TO 01 205132(ADDITION OF 3 NEW OFFICES TO HSBC Bank Canada) HVAC INCLUDED IN THIS FOLDER

    Jul 30, 2002 · 170 ATTWELL DR
  • Building permit00 335136Closed

    Interior alterations to office building. HVAC & Plumbing included. UNIT 301

    Dec 13, 2000 · 170 ATTWELL DR
  • Building permit00 160012Inspection

    Interior alterations to office building. HVAC and plumbing included. UNIT 620

    Aug 10, 2000 · 170 ATTWELL DR
  • Building permit00 152312Closed

    Electromagnetic locks to office building.

    Jun 27, 2000 · 170 ATTWELL DR
  • Building permit00 131862Inspection

    Interior alterations to existing office space '7th floor'. UNIT 460. HVAC and plumbing included.

    May 5, 2000 · 170 ATTWELL DR
  • Building permit00 125610Closed

    Interior alterations to 2nd floor of office building. HVAC permit inlcuded. UNIT 200

    Feb 28, 2000 · 170 ATTWELL DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,316 m²
Frontage
37.2 m
Depth
37.5 m
Street
Dixon Rd
Corner lot
No
Public lane
None
House footprint
1,301 m²roof up to 30.1 m
Back yard
—house to rear lot line
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new 8-storey hotel.

      33 CARLSON CRT · Jan 15, 2026 · 452 m away
    • Minor varianceApproved

      To construct a one-storey rear addition and an above grade parking structure. The existing 12-storey hotel will be maintained.

      33 CARLSON CRT · Jan 15, 2026 · 452 m away
    • Minor varianceApproved

      To permit parking for the existing hotel on a different lot during phased construction of the proposed hotel, addition to the existing hotel, and above grade parking garage and a parking reduction. A Previous Committee of Adjustment application (A0243/19EYK) approved variances for the existing Crowne Plaza Hotel and new Hyatt Hotel relating to side yard setbacks, parking and loading spaces, and soft landscaping. An additional Committee of Adjustment application (A181/16EYK) approved a variance permitting a car rental in conjunction with a hotel use.

      33 CARLSON CRT · Jun 9, 2022 · 452 m away
    • Minor varianceApproved

      To legalize and maintain an existing parking lot.

      900 DIXON RD · Nov 7, 2019 · 382 m away
    • Minor varianceApproved

      To construct a one-storey front addition on the existing Crowne Plaza Hotel, a three-storey above grade parking lot and a new eight-storey hotel(Hyatt Hotel).

      33 CARLSON CRT · Jul 4, 2019 · 452 m away

    Latest activity nearby

    • Building permit

      1 Roof Sign****CANCOM*****

      190 ATTWELL DR · Oct 28, 2026 · 85 m away
    • Building permit

      Proposed interior alterations to convert existing two-storey office building to proposed 41-suite care facility with adult programs designed to serve individuals living with dementia.

      165 ATTWELL DR · Oct 21, 2026 · 179 m away
    • Development application

      Site Plan Control Application for an interior conversion of approximately 3,077 square metres, with no exterior building additions or additional Gross Floor Area, to a Medical Office, Wellness Centre, and Hotel which are permitted uses as per City of Toronto Zoning By-law 569-2013. Proposed 37 suite hotel with adult day program (aimed toward people with dementia).

      165 ATTWELL DR · Sep 3, 2026 · 162 m away
    • Building permit

      Proposal for conversion of existing vacant unit into new CRAFT Beer Market Restaurant. Changes to exterior rooflines, finishes & interior alterations.

      15 CARLSON CRT · Aug 25, 2026 · 286 m away
    • Building permit

      1 WALL SIGN**CANCOM**

      180 ATTWELL DR · Jul 30, 2026 · 100 m away
    • Zoning review

      Closed

      180 ATTWELL DR · Jun 24, 2026 · 100 m away
    • Zoning review

      Closed

      801 DIXON RD · Apr 28, 2026 · 192 m away
    • Building permit

      Proposed interior alterations to demolish back to base existing restaurant

      15 CARLSON CRT · Apr 9, 2026 · 286 m away
    • Building permit

      1 WALL SIGN**CANCOM** (located on mechanical penthouse)

      180 ATTWELL DR · Jan 26, 2026 · 100 m away
    • Building permit

      1 WALL SIGN **CANCOM**

      180 ATTWELL DR · Dec 16, 2025 · 100 m away

    Neighbourhood: West Humber-Clairville

    About the area around the lot, not the lot itself.

    Nearest station
    Viscount Station35 min walk
    Nearest TTC stop
    Dixon Rd at Skyway Ave2 min walk
    Nearest traffic count
    19,831 vehicles in 8 hDixon Rd / Skyway Ave / Attwell Dr, 150 m away, Nov 22, 2023
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Trca Lands ( 44)15 min walk

    2021 Census

    FigureWest Humber-ClairvilleMedian neighbourhood
    Median household income (2020)$92,000$84,500
    Households that own their home65%54%
    Population (2021)33,30016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWest Humber-ClairvilleCity median
    Assault933636.3
    Robbery152.469.5
    Homicide2.75.3
    Shootings26.710.5
    Auto theft1320.6192.6
    Theft over $5,000245.946.1
    Break and enter347.5172.8
    Theft from vehicles545.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.