Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 95 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 4,002 m²
- Frontage
- 83.4 mestimated, irregular lot
- Depth
- 138.9 mestimated, irregular lot
- Street
- Yonge St
- Corner lot
- Yes, also on Lake Shore Blvd W138.9 m along it
- Public lane
- None
- House footprint
- 2,263 m²
- Back yard
- 20.6 mhouse to rear lot line
- Side yards
- 0.4 m and 5 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%8 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 26
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.
7 YONGE ST · Sep 3, 2025 · 172 m away - Minor varianceApproved
To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.
7 YONGE ST · Apr 23, 2025 · 172 m away - Minor varianceApproved
To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.
20 BAY ST · Jan 15, 2025 · 219 m away - Minor varianceApproved
To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).
55 LAKE SHORE BLVD E · Oct 23, 2024 · 332 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.
100 QUEENS QUAY E · Apr 17, 2024 · 464 m away
Latest activity nearby
- Building permit
INTERIOR ALTERATIONS (BUILDING, PLUMBING AND HVAC) - TENANT FITOUT FOR LEVELS 26-30
141 BAY ST · Nov 23, 2026 · 271 m away - Building permit
Rev 01: Addition of fire alarm speakers and strobesINTERIOR ALTERATIONS TO EXISTING OFFICE SPACE - LEVEL 4
10-20 BAY ST · Nov 20, 2026 · 206 m away - Building permit
Interior alterations - new laundry area in existing storage room
40 BAY ST · Nov 17, 2026 · 189 m away - Building permit
Proposal for Interior Alterations to an existing tenant space.
81 BAY ST · Nov 16, 2026 · 158 m away - Building permit
Proposal for interior alterations on floor 9.
81 BAY ST · Nov 16, 2026 · 158 m away - Building permit
Proposal for interior alterations for a new layout for 2 office units
20 BAY ST · Nov 16, 2026 · 219 m away - Building permit
Alternative solution to provide specific design features engineered to protect and secure the building's floor openings and stairway.
1 YONGE ST · Nov 10, 2026 · 226 m away - Building permit
Proposed addition of fire detection devices and control relays for CSA B44 intelligentrecall capabilities (elevator modernization)
1 HARBOUR SQ · Nov 10, 2026 · 268 m away - Building permit
REVISION - HVAC REVISION AS PER SITE CONDITIONS AND INSPECTORS REQUESTHVAC - Proposal for interior alterations to existing offices on the third level.
100 HARBOUR ST · Nov 9, 2026 · 272 m away - Building permit
REMOVE AND REPLACE EXISTING FENCING/CAGING AROUND EXISTING STORAGES WITH1.5HR FIRE RATED WALLS AS REQUESTED BY THE FIRE INSPECTOR.EXISTING STORAGES ARE LOCATED WITHIN THE UNDERGROUND PARKING LEVEL P1
33 BAY ST · Nov 5, 2026 · 86 m away
Neighbourhood: St Lawrence-East Bayfront-The Islands
About the area around the lot, not the lot itself.
- Nearest station
- Queens Quay/Ferry Docks Station3 min walk
- Nearest TTC stop
- Bay St at Lake Shore Blvd W1 min walk
- Nearest cycling route
- Bay StBike Lane, 2 min walk
- Nearest traffic count
- 17,008 vehicles in 8 hBay St / Lake Shore Blvd W, 100 m away, Aug 22, 2012
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 2 with cyclists
- Parks
- Harbour Square Park Lands4 min walk
- 50 Queens Quay East Park4 min walk
- Love Park5 min walk
Schools within 1 km
- DOWNTOWN ALTERNATIVE SCHOOL English Public 12 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 13 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 13 min walk
- VICTORIA STREET LINC English Public 14 min walk
- GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | St Lawrence-East Bayfront-The Islands | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 31,285 | 16,813 |
| Homes built in 1960 or before | 3% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | St Lawrence-East Bayfront-The Islands | City median |
|---|---|---|
| Assault | 1059.7 | 636.3 |
| Robbery | 96.3 | 69.5 |
| Shootings | 4.5 | 10.5 |
| Auto theft | 24.6 | 192.6 |
| Theft over $5,000 | 78.4 | 46.1 |
| Break and enter | 163.5 | 172.8 |
| Theft from vehicles | 163.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.