HousePrecheckCheck an address

169 Viewmount AveToronto · zoning, lot size and permit records

Open space · OR≈ 291.4 × 228.4 m41,042 m²on Viewmount Ave

Not a home

Viewmount Park

The City of Toronto's real estate inventory lists Viewmount Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 2 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
≈ 291.4 m frontage≈ 228.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit97 089103Closed

    ADD, INT ALT

    Nov 14, 1997 · 169 VIEWMOUNT AVE

Lot facts

Area
41,042 m²
Frontage
291.4 mestimated, irregular lot
Depth
228.4 mestimated, irregular lot
Street
Viewmount Ave
Corner lot
No
Public lane
None
House footprint
268 m²roof up to 5.3 m
Back yard
155.4 mhouse to rear lot line
Side yards
98.5 m and 175.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: oak, white (81 cm), ash, european (44 cm), oak, red (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%24 of 28 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Latest activity nearby

  • Building permitdemolition

    Proposal to demolish existing single family dwelling in support of the construction of an OLT and council approved development project.See also 24-171220 NNY 08 OZ

    18 ROMAR CRES · Nov 24, 2026 · 278 m away
  • Zoning review

    Not Started

    78 RIDELLE AVE · Nov 17, 2026 · 250 m away
  • Zoning review

    Notice Sent

    78 RIDELLE AVE · Nov 6, 2026 · 250 m away
  • Building permitdemolition

    Proposal to demolish existing dwelling and construct a new single family detached dwelling with an integral garage.

    164 VIEWMOUNT AVE · Oct 26, 2026 · 175 m away
  • Building permitnew building, new house

    Proposal to demolish existing dwelling and construct a new single family detached dwelling with an integral garage.

    164 VIEWMOUNT AVE · Oct 26, 2026 · 175 m away
  • Minor varianceRefused

    To construct a new dwelling with covered front and rear porches.

    131 HILLMOUNT AVE · Oct 15, 2026 · 245 m away
  • Building permit

    Proposal to replace existing pressure treated stairs and landings with concrete porch with cold room beneath and elevated concrete stairs and landings wtih foundations and provide code compliant railings

    96 PRUE AVE · Oct 8, 2026 · 217 m away
  • Building permit

    Replace existing 6x6 Pressure Treated Stairs and landings with NEW 8" and 10" Concrete Block Foundations and NEW Concrete stairs. Provide NEW Railings to Code Storage below front porch contains floor drain and add linear drain at garage doors

    96 PRUE AVE · Sep 18, 2026 · 217 m away
  • Building permit

    Proposal for a side yard addition housing a mudroom and powder room (12.8sm).

    751 BRIAR HILL AVE · Aug 24, 2026 · 184 m away
  • Building permit

    Construct new concrete porch w storage beneath and stairs.. Provide Railings to Code

    96 PRUE AVE · Aug 12, 2026 · 217 m away

Neighbourhood: Englemount-Lawrence

About the area around the lot, not the lot itself.

Nearest station
Glencairn Station7 min walk
Nearest TTC stop
Glencairn Station - Southbound Platform4 min walk
Nearest cycling route
Viewmount Park TrlMulti-Use Trail - Existing Connector, 1 min walk
Nearest traffic count
659 vehicles in 8 hNewgate Rd / Briar Hill Ave, 160 m away, Oct 27, 2020
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Viewmount Park1 min walk
Newgate Parkette3 min walk
Benner Park3 min walk

Schools within 1 km

  • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • WEST PREPARATORY JR PUBLIC SCHOOL English Public 10 min walk
  • GLEN PARK PUBLIC SCHOOL English Public 11 min walk
  • TORAH EMETH JEWISH CENTRE & EITZ CHAIM HEBREW SCHOOL Private 13 min walk
  • EITZ CHAIM SCHOOL (BATHURST) Private 14 min walk
  • BIALIK HEBREW DAY SCHOOL Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEnglemount-LawrenceMedian neighbourhood
Median household income (2020)$78,000$84,500
Households that own their home43%54%
Population (2021)21,28516,813
Homes built in 1960 or before26%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEnglemount-LawrenceCity median
Assault539.9636.3
Robbery45.769.5
Homicide4.25.3
Shootings24.910.5
Auto theft149.5192.6
Theft over $5,00029.146.1
Break and enter137172.8
Theft from vehicles207.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.