HousePrecheckCheck an address

169 The Donway WToronto · zoning, lot size and permit records

84.4 × 112.4 m8,467 m²on The Donway Wcorner, also on Sanderling Pl

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 22 218694 NNY 16 SA (Proposal for a 28 storey mixed use tower and podium, a community space, a publicly acce..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 267035 PRS 00 IR (Property Standards, 2026, status Rescheduled).
N50 m
84.4 m frontage112.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 267035 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 218694 NNY 16 SA (Proposal for a 28 storey mixed use tower and podium, a community space, a publicly acce..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 267035 PRS 00 IRRescheduled

    Property Standards

    Nov 7, 2026 · 169 THE DONWAY W
  • By-law investigation26 211595 WST 00 IRClosed

    Waste

    Jul 30, 2026 · 169 THE DONWAY W
  • By-law investigation26 154024 GRA 00 IRClosed

    Graffiti

    May 2, 2026 · 169 THE DONWAY W
  • By-law investigation26 156906 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to water bottles, coffee cups, takeo

    Apr 30, 2026 · 169 THE DONWAY W
  • By-law investigation26 153217 WST 00 IRClosed

    Waste

    Apr 30, 2026 · 169 THE DONWAY W
  • Zoning review22 218694 PSPClosed
    Nov 26, 2022 · 169 THE DONWAY W
  • Development application22 218694 NNY 16 SAUnder Review

    Proposal for a 28 storey mixed use tower and podium, a community space, a publicly accessible open space and proposed park. The development will include 570 dwelling units. A total of 446 parking spaces will be provided, which includes 401residential spaces, 40 community space and residential visitor spaces and 5 car-share spaces. The residential GFA will be 40,896 m2and the non­residential GFA (community space) will be 1,780 m2.

    Oct 18, 2022 · 169 THE DONWAY W · City file
  • Zoning review15 227717 POZClosed
    Oct 28, 2015 · 169 THE DONWAY W
Show 1 older records
  • Building permit11 118658Closeddemolition

    Two storey post office building

    Feb 22, 2011 · 169 THE DONWAY W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,467 m²
Frontage
84.4 m
Depth
112.4 m
Street
The Donway W
Corner lot
Yes, also on Sanderling Pl112.4 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: planetree, london (32 cm), ginkgo (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing one and a half storey dwelling by constructing a one-storey rear addition, and rear deck.

    20 PAPERBIRCH DR · Feb 19, 2026 · 334 m away
  • Minor varianceApproved

    To construct a new front porch, and convert existing porch into an enclosed mud room/entrance.

    7 VEERY PL · Sep 25, 2025 · 418 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached by constructing a covered porch.

    20 LANGBOURNE PL · Sep 11, 2025 · 391 m away
  • Minor varianceApproved

    To construct a new two-storey duplex dwelling with integrated garage.

    7 LANGBOURNE PL · Jun 12, 2025 · 301 m away
  • Minor varianceApproved

    To construct a second storey above existing main floor footprint of the main house and construct a garden suite on top of the existing garage.

    1 PAPERBIRCH DR · Jun 12, 2025 · 270 m away

Latest activity nearby

  • Building permit

    Proposal to install a flat roof mounted Solar PV System.

    20 SANDERLING PL · Nov 13, 2026 · 158 m away
  • Building permit

    Structural snow damage restoration.

    63 PAPERBIRCH DR · Oct 29, 2026 · 250 m away
  • Building permit

    1 GROUND SIGN WITH ELECTRONIC MOVING AND READOGRAPH COPY**BETTERLIVING COMMUNITY CENTRE**

    1 OVERLAND DR · Sep 28, 2026 · 248 m away
  • Building permit

    Proposed interior altrerations to unit 201, existing office.

    8 SAMPSON MEWS · Jul 3, 2026 · 255 m away
  • Building permit

    LOCALIZED PARKING GARAGE CONCRETE REPAIRS, EXPANSION JOINT REPAIRS, DRAIN REPLACEMENT AND WATERPROOFING REPAIRS

    75 THE DONWAY W · Jun 19, 2026 · 249 m away
  • Building permitgarden suite

    Proposed construction of a second-storey garden suite above the existing detached garage, within the existing building footprint. See also 24 244102 ZAP.

    1 PAPERBIRCH DR · Apr 30, 2026 · 270 m away
  • Zoning review

    Closed

    170 THE DONWAY W · Apr 20, 2026 · 102 m away
  • Zoning review

    Closed

    895 LAWRENCE AVE E · Apr 9, 2026 · 123 m away
  • Building permit

    Proposal for Gazebo.

    31 SANDERLING PL · Dec 31, 2025 · 165 m away
  • Building permit

    Proposal to construct a storage/shed in rear yard.

    31 SANDERLING PL · Dec 17, 2025 · 165 m away

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Don Valley Station27 min walk
Nearest TTC stop
The Donway West at Sanderling Pl South Side1 min walk
Nearest cycling route
Duncairn Park TrlMulti-Use Trail, 6 min walk
Nearest traffic count
7,373 vehicles in 8 hMarie Labatte Rd / The Donway W, 80 m away, Apr 16, 2019
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Paperbirch Walkway3 min walk
Don Mills Local Park4 min walk
Duncairn Park6 min walk

Schools within 1 km

  • SENECA HILL PRIVATE SCHOOL Private 5 min walk
  • OVERLAND LEARNING CENTRE English Public 5 min walk
  • NORMAN INGRAM PUBLIC SCHOOL English Public 10 min walk
  • DON MILLS MDL SCHOOL English Public 10 min walk
  • DON MILLS COLLEGIATE INSTITUTE English Public 11 min walk
  • GREENLAND PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.