HousePrecheckCheck an address

1650 Yonge StToronto · zoning, lot size and permit records

Also 1646 Yonge St, 1648 Yonge St, 1652 Yonge St

19.3 × 27.9 m468 m²on Yonge St

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.0 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelStill open in the City's records: 16 204396 (Proposal to install a 2 inch backflow prevention device, 2016, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 43 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N10 m
19.3 m frontage27.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 204396 (Proposal to install a 2 inch backflow prevention device, 2016, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 43 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 163613 GRA 00 IRClosed

    Graffiti

    May 20, 2026 · 1650 YONGE ST
  • Zoning review18 238017 LTOClosed
    Oct 5, 2018 · 1650 YONGE ST
  • Building permit16 204396Permit Issued

    Proposal to install a 2 inch backflow prevention device.

    Sep 9, 2016 · 1650 YONGE ST
  • Zoning review16 140149 LTOClosed
    Apr 14, 2016 · 1650 YONGE ST
  • Zoning review02 192234 LTOClosed
    Nov 27, 2002 · 1650 YONGE ST
  • Zoning review84 026420 LTOClosed
    May 11, 1984 · 1650 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
468 m²
Frontage
19.3 m
Depth
27.9 m
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
401 m²roof up to 14.8 m
Back yard
1 mhouse to rear lot line
Side yards
0.2 m and 1.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    91%39 of 43 decisions
    Garden suite permits
    2
    Laneway suite permits
    0
    Multiplex permits
    6
    Development applications
    6

    Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing two-and-one-half-storey detached dwelling by constructing a new front porch with canopy, a rear two-storey addition (with a rear second storey balcony), and a rear third storey rooftop deck. A rear portion of the existing third storey will be demolished.

      57 GORMLEY AVE · Nov 4, 2026 · 413 m away
    • Minor varianceApproved

      To permit additional uses within the existing two-storey non-residential detached building.

      8 LAWTON BLVD · Sep 9, 2026 · 108 m away
    • Minor varianceRefused

      To alter the existing three-storey detached dwelling (basement level is considered the first storey) by constructing a three-storey east side addition with a seven-car integral garage (four spaces on the basement level, and three spaces on the main level), a rear widened ground floor deck with stairs, a rear second floor covered balcony, and a new widened driveway. The existing driveway will be replaced with sod.

      85 GORMLEY AVE · Aug 12, 2026 · 491 m away
    • Minor varianceApproved

      To alter the existing three-storey detached dwelling by reconstructing the rear first floor deck (balcony) with stairs, and to construct a rear at-grade stone patio.

      48 HEATH ST E · Jul 15, 2026 · 274 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition (above existing garage located at the basement level), and to replace the existing rear deck with a new covered deck and stairs (including new stairs for the basement walkout).

      23 LONSDALE RD · Jun 10, 2026 · 141 m away

    Latest activity nearby

    • Zoning review

      Not Started

      1 HEATH ST E · Nov 9, 2026 · 229 m away
    • Building permit

      Proposed Renovations to an Existing Driveway and Front Yard Landscaping to an Existing Single Family Dwelling

      42 WALMSLEY BLVD · Oct 21, 2026 · 257 m away
    • Zoning review

      Closed

      1560 YONGE ST · Oct 19, 2026 · 241 m away
    • Building permitnew building, new house, secondary suite

      REV01: EXISTING WEST SIDE FOUNDATION WALL TO REMAIN AND BE UNDERPINNED. ALL CHANGES HAVE BEEN BUBBLED AND ONLY REVISED PAGES HAVE BEEN INCLUDED.NEW 3 STOREY SFD W/ SECOND SUITE, NEW COVERED FRONT PORCH AND REAR DECK.SEE ALSO 26 178464 DEM and 26 152683 ZAP

      38 WALMSLEY BLVD · Oct 16, 2026 · 252 m away
    • Building permitdemolition

      Proposal to demolish the existing 2 storey SFD-detached dwelling.

      38 WALMSLEY BLVD · Oct 16, 2026 · 252 m away
    • Building permit

      Proposed interior alterations for interior cosmetic upgrades including washer/ dryer addition.No changes to existing HVAC system - no HVA permit required

      111 LAWTON BLVD · Oct 8, 2026 · 270 m away
    • Zoning review

      Closed

      1590 YONGE ST · Oct 6, 2026 · 126 m away
    • Building permit

      Reivison Proposed construction of a second-storey addition over the existing garage.

      23 LONSDALE RD · Sep 29, 2026 · 141 m away
    • Development application

      Proposed four storey community centre with a gross floor area of 6,166sqm.

      1566 YONGE ST · Sep 25, 2026 · 207 m away · City file
    • Building permit

      Rev 01 - addition of landscape stairs to original permit # 26-131632 BLD 00 SR New Porch in existing location

      5 DUGGAN AVE · Sep 16, 2026 · 242 m away

    Neighbourhood: Yonge-St.Clair

    About the area around the lot, not the lot itself.

    Nearest station
    St. Clair Station7 min walk
    Nearest TTC stop
    Yonge St at Heath St West3 min walk
    Nearest cycling route
    Yonge StCycle Track, 1 min walk
    Nearest traffic count
    1,559 vehicles in 8 hLonsdale Rd / Lawton Blvd, 50 m away, Sep 29, 2003
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 2 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Lawton Parkette1 min walk
    Yorkminster Park Baptist Church Park1 min walk
    Kay Gardner Beltline Park7 min walk

    Schools within 1 km

    • THE YORK SCHOOL - JR CAMPUS Private 1 min walk
    • DEER PARK JR & SR PUBLIC SCHOOL English Public 7 min walk
    • UPPER CANADA COLLEGE SCHOOL Private 9 min walk
    • THE LINDEN SCHOOL Private 10 min walk
    • UPPER CANADA PREP SCHOOL Private 12 min walk
    • DAVISVILLE & SPECTRUM SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-St.ClairMedian neighbourhood
    Median household income (2020)$94,000$84,500
    Households that own their home40%54%
    Population (2021)12,90516,813
    Homes built in 1960 or before45%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-St.ClairCity median
    Assault270.8636.3
    Robbery25.869.5
    Auto theft64.5192.6
    Theft over $5,00032.246.1
    Break and enter374172.8
    Theft from vehicles116.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.