HousePrecheckCheck an address

164 Grange AveToronto · zoning, lot size and permit records

Also 168 Grange Ave

Residential · R (d1.0) (x853)24.4 × 27.8 m673 m²on Augusta Avecorner, also on Grange Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 24 rental units, built 1970More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 10 282435 (underpinning a corner section of the building which has expierenced differential settle..., 2010, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • 4 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 150839 PRS 00 IV (Order Issued Property Standards: Dwelling unit window that is capable of being opened h..., 2026, status Order Issued); 26 150761 PRS 00 IV (Order Issued Property Standards: A separate and secure mail box or mail receptacle has..., 2026, status Order Issued); 26 122924 PRS 00 IR (Property Standards, 2026, status Order Issued); and 1 more.
  • City upkeep score: 71 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Queen-SpadinaThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
24.4 m frontage27.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 150839 PRS 00 IV (Order Issued Property Standards: Dwelling unit window that is capable of being opened h..., 2026, status Order Issued); 26 150761 PRS 00 IV (Order Issued Property Standards: A separate and secure mail box or mail receptacle has..., 2026, status Order Issued); 26 122924 PRS 00 IR (Property Standards, 2026, status Order Issued); and 1 more.

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2010

    Needs a closer look

    Still open in the City's records: 10 282435 (underpinning a corner section of the building which has expierenced differential settle..., 2010, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 10 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Zoning): 26 179545 PRS 00 IR (Property Standards, 2026); 26 169457 PRS 00 IR (Property Standards, 2026); 26 129750 PRS 00 IR (Property Standards, 2026); and 7 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 71 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 24 units, built 1970).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 265562 WST 00 IRClosed

    Waste

    Nov 4, 2026 · 164 GRANGE AVE
  • By-law investigation26 179545 PRS 00 IRClosed

    Property Standards

    Jun 7, 2026 · 164 GRANGE AVE
  • By-law investigation26 169457 PRS 00 IRClosed

    Property Standards

    May 28, 2026 · 164 GRANGE AVE
  • By-law investigation26 129750 PRS 00 IRClosed

    Property Standards

    Mar 15, 2026 · 164 GRANGE AVE
  • By-law investigation26 129748 PRS 00 IRClosed

    Property Standards

    Mar 15, 2026 · 164 GRANGE AVE
  • By-law investigation26 126268 GRA 00 IRClosed

    Graffiti

    Mar 7, 2026 · 164 GRANGE AVE
  • By-law investigation26 150839 PRS 00 IVOrder Issued

    Order Issued Property Standards: Dwelling unit window that is capable of being opened has screen that is not maintained in good repair and free from defects or missing components.Namely, dwelli; Exterior door is not maintained in good repair.Namely, all doors and frames throughout the courtyard are not in a good state of repair.; Exterior landing not maintained.Namely, the exteior landings throughout the stairs is the courtyard is not in a good state of repair.; Exterior walkway not maintained.Namely, the walkway throughout the courtyard of the building is not in a good state of repair.; Exterior walkway not maintained.The walkway located on the west side of the front of the building is not in a good state of good repair.; Exterior window(s) with broken/cracked glass.Namely, there are broken/cracked windows throughout the exterior of all buildings.; The accessory building is not constructed and/or maintained in good repair.Namely, the walkway in the storage shed in the courtyard is not in a good state of re; The electrical receptacle are not maintained in good working order.Namely, the electrical receptacles are not maintained clean.; The exterior walls and their components are not being maintained in good repair.Namely, the siding throughout the front of all buildings is not in a good state ; The exterior walls and their components are not being maintained in good repair.Namely, the walls throughout the courtyard are not in a good state of repair.; The foundation wall(s) of the building or structure are not being maintained in good repair.Namely, the foundation walls throughout all the buildings is not in ; The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely, there are bricks throughout the exterior of the buildi; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not being maintained free f; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa; The (verandah, porch, deck, loading dock, ramp, balcony, fire escape or other similar structure, and/or other appurtenant attachment) and/or the supporting stru; The window(s) that is capable of being opened has defective hardware. Namely, windows throughout the unit are missing window guards.

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 150761 PRS 00 IVOrder Issued

    Order Issued Property Standards: A separate and secure mail box or mail receptacle has not been provided for each dwelling unit.Namely, the mailboxes throughout all buildings are not in a good ; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the ceiling in the laundry room is not in a good state of repair.; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the ceilings on all floors throughout all buildings are not in a good s; Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair.Namely, dwelling unit doors and frames throughout all buildings are no; Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair.Namely, the door in the stairwell exiting the laundry room is not in a; Lighting in a laundry room is provided at less than 200 lux.Namely, the lighting in the laundry room is provided at less than 200 lux.; Previously finished wall(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements.Namely, the walls throughout all floors in all ; The electrical fixtures are not maintained in good working order.Namely, light fixtures throughout all buildings are missing a cover.; The electrical fixtures are not maintained in good working order.Namely, the electrical fixtures in the laundry room, and stairwell leading to laundry room are ; The electrical fixtures are not maintained in good working order.Namely, the electrical fixtures throughout all buildings are not maintained clean.; The electrical fixtures are not maintained in good working order.Namely, the face plate on the electrical fixture is not in a good state of repair.; The floor and every appurtenance, surface cover and finish is not maintained. Namely, the floor in the laundry room/ and floor leading to the stairwell is not i; The floor and every appurtenance, surface cover and finish is not maintained. Namely, the floors throughout all buildings are not in a good state of repair.; The floor and every appurtenance, surface cover and finish is not maintained. Namely, there are broken floor tiles in all entrances throughout all buildings.; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the walls in the laundry room, including the stairwell leading to the l; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the wall tiles in all entrances of all buildings are not in a good stat

    Mar 1, 2026 · 164 GRANGE AVE
Show 13 older records
  • By-law investigation26 122927 ZON 00 IRClosed

    Zoning

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122926 PRS 00 IRClosed

    Property Standards

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122925 PRS 00 IRClosed

    Property Standards

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122924 PRS 00 IROrder Issued

    Property Standards

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122923 PRS 00 IROrder Issued

    Property Standards

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122922 FEN 00 IRClosed

    Fence

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 122921 WST 00 IRClosed

    Waste

    Mar 1, 2026 · 164 GRANGE AVE
  • By-law investigation26 119455 HEA 00 IRClosed

    Adequate Heat

    Feb 20, 2026 · 164 GRANGE AVE
  • By-law investigation26 119146 HEA 00 IRClosed

    Adequate Heat

    Feb 20, 2026 · 164 GRANGE AVE
  • By-law investigation26 118788 PRS 00 IRClosed

    Property Standards

    Feb 19, 2026 · 164 GRANGE AVE
  • By-law investigation26 106791 WST 00 IRClosed

    Waste

    Jan 20, 2026 · 164 GRANGE AVE
  • Building permit10 282435Inspection

    underpinning a corner section of the building which has expierenced differential settlement.(address includes 168 Grange Av.-convenience address)

    Dec 9, 2010 · 164 GRANGE AVE
  • Building permit00 166666Closed

    carry out remedial work to comply retrofit provisions of the fire code (ont. reg. 388/97)

    Jul 21, 2000 · 164 GRANGE AVE

Check before you build

  • Site-specific exception 900.2.10(853)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(853)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Older by-law A

    Section 12(2) 208 of former City of Toronto By-law 438-86

5 parts for other addresses
  • B On 25 Augusta Ave.: (i) a religious residence may be combined with other permitted uses on the lot ; (ii) a rooming house with no more than 16 rooms providing …
  • B On 91 Augusta Ave., former City of Toronto by-law 60-67
  • C On 165 Grange Ave., former City of Toronto by-law 164-71
  • D On 77 Ryerson Ave., former City of Toronto by-law 163-71
  • E On 20 Vanauley St., former City of Toronto by-law 680-83.
By-law 569-2013, Chapter 900

Lot facts

Area
673 m²
Frontage
24.4 m
Depth
27.8 m
Street
Augusta Ave
Corner lot
Yes, also on Grange Ave27.8 m along it
Public lane
None
House footprint
568 m²roof up to 21 m
Back yard
0.1 mhouse to rear lot line
Side yards
0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen-Spadina. The lot is inside the Queen-Spadina Major Transit Station Area approved by the Province (Site and Area Specific Policy 762). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x853) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, silver (77 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
75%21 of 28 decisions
Garden suite permits
1
Laneway suite permits
7
Multiplex permits
10
Development applications
11

Within 300 m, last 10 years. 18 suite and multiplex permits: more than at 86% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 222 m away
  • Minor varianceRefused

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the basement and two-short-term bicycle parking spaces in the front yard. Also, there will be a total of twelve residential dwelling units on this lot (nine units within the main dwelling and three units in the ancillary building).

    74 MARKHAM ST · Oct 14, 2026 · 474 m away
  • Minor varianceApproved

    To alter the existing rear two-storey detached ancillary building (containing one laneway suite and a two-car garage, abutting the laneway) by constructing a one-storey addition (patio enclosure) on the south side of this building. There is a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

    122 D'ARCY ST · Jul 15, 2026 · 482 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front basement walkout, a front covered porch with stairs, front second and third storey bay windows, a rear ground floor deck with stairs, and a rear third storey rooftop patio. Also, to construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot.

    104 MARKHAM ST · Apr 15, 2026 · 469 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).

    52 PHOEBE ST · Mar 11, 2026 · 430 m away

Latest activity nearby

  • Minor variancePending

    To permit and to maintain the conversion of two three-bedroom dwelling units into two-bedroom dwelling units by removing one bedroom from the ground floor of each unit within the existing mixed-use residential development.

    115 DENISON AVE · Dec 16, 2026 · 63 m away
  • Building permitsecondary suite

    REV 01: REVISION TO LAYOUT as bubbledProposal for interior alterations to relocate kitchens from the Basement and 2nd Floor to the Ground Floor and 3rd Floor, and to add additional plumbing fixtures.

    5 KENSINGTON AVE · Nov 13, 2026 · 203 m away
  • Zoning review

    Application On Hold

    77 GRANGE AVE · Nov 6, 2026 · 234 m away
  • Building permitmultiplex, secondary suite

    Proposed interior alteration, proposed secondary suite in the basement (total two units).

    8 CASIMIR ST · Nov 6, 2026 · 255 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 222 m away
  • Building permitmultiplex

    Order to comply remediation. Small scale basement demo, main floor renovation, second floor minor alterations. See cover letter for detail.

    658 DUNDAS ST W · Oct 29, 2026 · 182 m away
  • Building permit

    REVISION - revised sprinklersProposal to replace the sprinkler alarm valve, install new backflow on sprinkler line, replace underground fire standpipe line, replace fire pump

    674 DUNDAS ST W · Oct 22, 2026 · 212 m away
  • Building permit

    Repair of the existing detached wood-frame garage at the rear of the lot (32 Augusta Avenue), replacing deteriorated wall studs, plates, roof joists, roof deck, roofing, cladding and lane doors in kind. No addition, no demolition, no change of use, no change to the footprint or height.

    32 AUGUSTA AVE · Oct 19, 2026 · 254 m away
  • Zoning review

    Closed

    222 SPADINA AVE · Oct 12, 2026 · 277 m away
  • Zoning review

    Closed

    222 SPADINA AVE · Sep 2, 2026 · 277 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
St Patrick Station19 min walk
Nearest TTC stop
Dundas St West at Denison Ave2 min walk
Nearest cycling route
Denison AveBike Lane - Contraflow, 1 min walk
Nearest traffic count
13,917 vehicles in 14 hDundas St W / Augusta Ave, 110 m away, May 5, 2026
Serious collisions within 500 m
142021–2026, killed or seriously injured: 1 fatal, 8 with pedestrians, 1 with cyclists
Parks
Randy Padmore Park3 min walk
Alexandra Park3 min walk
Bellevue Square Park4 min walk

Schools within 1 km

  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 2 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 8 min walk
  • WESTSIDE MONTESSORI ELEMENTARY SCHOOL Private 10 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 11 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • KENSINGTON COMMUNITY SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.