Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 25 243336 (Revision 01: proposal to reduce scope - proposed work on the second floor is removed fr..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0010/14TEY (To construct a two-storey addition to the four-storey office building, 2014).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
14 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 243336Revision Issued
Revision 01: proposal to reduce scope - proposed work on the second floor is removed from the previously issued permit. Proposed interior alterations of an existing commercial office building to update the existing office layout. New offices, therapeutic rooms, shared work spaces, and some electrical work on the partial second and third floors only. No exterior, structural, or mechanical work.
May 8, 2026 · 163 QUEEN ST E - Zoning review22 227734 ZZUCancelledNov 9, 2022 · 163 QUEEN ST E
- Building permit18 201785Closed
Proposal to construct interior alterations to existing unit #101
Aug 21, 2018 · 163 QUEEN ST E - Minor varianceA0010/14TEYApproved
To construct a two-storey addition to the four-storey office building.
Mar 5, 2014 · 163 QUEEN ST E - Zoning review13 139860 ZPRClosedMar 25, 2013 · 163 QUEEN ST E
- Zoning review13 112930 ZPRClosedJan 29, 2013 · 163 QUEEN ST E
- Building permit09 157959Closed
Proposal to install 1 backflow prevention device to the existing water line.
Sep 1, 2009 · 163 QUEEN ST E - Building permit09 111573Closed
Proposal for interior alterations to the third floor office space. Tenant is Health Force Ontario. See also 08 150801 BLD for previous interior alterations to the third floor.
Mar 5, 2009 · 163 QUEEN ST E
Show 6 older records
- Building permit08 222345Closed
Proposal for interior alterations on fourth floor (single tenant occupancy) for existing tenant "HeathForceToronto, Marketing and Recruitment Agency" (231m2).
Nov 26, 2008 · 163 QUEEN ST E - Building permit08 161346Closed
Interior alterations to existing office space on the ground floor.
Jun 12, 2008 · 163 QUEEN ST E - Building permit08 150801Closed
Proposed interior alterations to second, third and fourth floors of existing office building - single tenant floors.
May 23, 2008 · 163 QUEEN ST E - Building permit07 161543Closed
HVAC - Interior alterations to expand existing GF Office across lobby. Multi tenant floor.
May 9, 2007 · 163 QUEEN ST E - Building permit01 131033Closed
make interior alterations in existing retail store on ground floor to change use for office. tenant: shaftsbury films inc.
May 10, 2001 · 163 QUEEN ST E - Building permit00 328751Closed
make interior altertions to portion on 4th floor existing office. tenant: yolles partnership edc
Aug 29, 2000 · 163 QUEEN ST E
Check before you build
Site-specific exception 900.11.10(333)
Needs a closer look7 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In the CR zone, a drive-through facility is not permitted.
- Rule B
On 163 Queen Street East, 351 Queen Street East and 167 Parliament Street, 363, 371 and 373 Queen Street East, a seniors community house or an emergency shelter is not a permitted use; [TO: 438-86; 12 (2) 98]
- Rule E
These premises must comply with Exception 900.11.10(2)
- Rule F
Despite regulation 40.5.40.10(4), equipment and structures on the roof of a building may not exceed the permitted maximum height
- Rule G
On a lot with a lot line that abuts Britain Street, no building or structure may penetrate a 45 degree angular plane projected over the lot along the lot line abutting Britain Street, starting at a height of 16 metres above the average elevation of the ground at the front lot line of abutting lots fronting Queen Street East.
- Rule H
If a lot with a building is identified as a heritage site, any portion of a building or structure that exceeds the height of the conserved heritage building , whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres.
- Rule I
Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less than 3.7 metres.
- Older by-law A
Section 12 (2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12 (2) 270 (a) of former City of Toronto By-law 438-86
2 parts for other addresses
- C On even numbered addresses of 8-34 Britain Street, 120-122 Sherbourne Street and 155 George Street, despite regulation 40.10.20.40 (1), dwelling units are …
- D On odd numbered addresses of 315-321 Queen Street East and 145 Berkeley Street, no building or structure is to exceed a height of 12.0 metres within a distance …
Lot facts
- Area
- 1,233 m²
- Frontage
- 31.1 m
- Depth
- 40 m
- Street
- George St
- Corner lot
- Yes, also on Queen St E40 m along it
- Public lane
- None
- House footprint
- 961 m²
- Back yard
- 0.1 mhouse to rear lot line
- Side yards
- 0 m and 6.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 25 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
- King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Queen Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.5 (c2.0; r4.0) SS2 (x333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, freeman autumn blaze (22 cm), maple, freeman autumn blaze (16 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 96%22 of 23 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 12
- Development applications
- 36
Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.
53 ONTARIO ST · Sep 23, 2026 · 492 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 460 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 344 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 141 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 288 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 270 m away - Building permit
1 wall sign**PHARMASAVE**
213 A QUEEN ST E · Nov 23, 2026 · 161 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 207 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Nov 12, 2026 · 178 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 182 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Oct 26, 2026 · 178 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 183 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 263 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 179 m away - Zoning review
Closed
88 QUEEN ST E · Oct 14, 2026 · 202 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station9 min walk
- Nearest TTC stop
- Queen St East at Jarvis St1 min walk
- Nearest cycling route
- Richmond St ECycle Track, 2 min walk
- Nearest traffic count
- 5,481 vehicles in 8 hQueen St E / George St / Moss Park Trl, 40 m away, Oct 18, 2022
- Serious collisions within 500 m
- 152021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 1 with cyclists
- Parks
- Moss Park1 min walk
- St. James Park4 min walk
- 45 Dalhousie St Park4 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 5 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.