HousePrecheckCheck an address

161 The East MallToronto · zoning, lot size and permit records

Employment · E 1.0≈ 182.1 × 114.5 m12,291 m²on The East Mall

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N50 m
≈ 182.1 m frontage≈ 114.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    12,291 m²
    Frontage
    182.1 mestimated, irregular lot
    Depth
    114.5 mestimated, irregular lot
    Street
    The East Mall
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
    • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: oak, red (8 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a parking deficiency.

      120 THE EAST MALL · Aug 12, 2021 · 361 m away
    • Minor varianceApproved

      To construct a one-storey north side addition.

      106 NORTH QUEEN ST · Mar 23, 2021 · 356 m away
    • Minor varianceApproved

      To construct a one-storey rear addition.

      18 MEDULLA AVE · Aug 29, 2019 · 282 m away
    • Minor varianceApproved

      To maintain the north portion of the existing industrial building.

      35 CORONET RD · Apr 14, 2016 · 239 m away
    • Minor varianceApproved

      To maintain the south portion of the existing industrial building.

      35 CORONET RD · Apr 14, 2016 · 239 m away

    Latest activity nearby

    • Building permit

      LOCALIZED REPAIRS TO EXTERIOR WALL FOLLOWING VEHICLE IMPACTConvenience address is 27 Coronet Rd

      25 CORONET RD · Oct 6, 2026 · 231 m away
    • Building permit

      Updating the existing infrastructure to bring the building in line with net-zero energy design criteria.

      146 THE EAST MALL · Sep 15, 2025 · 137 m away
    • Zoning review

      Closed

      27 CORONET RD · Jun 27, 2025 · 230 m away
    • Building permit

      Proposal to install new sprinkler system.

      136 THE EAST MALL · May 16, 2025 · 266 m away
    • Building permit

      REVISION - address owner¿s loading dock requirementsProposed existing warehouse facility will be renovated for new tenant including a new loading dock and 2 storey shipping office addition.

      136 THE EAST MALL · Apr 16, 2025 · 266 m away
    • Zoning review

      Closed

      136 THE EAST MALL · Dec 28, 2023 · 266 m away
    • Building permit

      Repair and reinforce concrete block masonry wall

      63 MEDULLA AVE · Jul 26, 2023 · 182 m away
    • Building permit

      City of Toronto NCP # SR3787065442/ WS3790506297.Installation design of the residential washer & dryer, purchased by the Toronto Fire Services for FireHall in accordance with Provincial and City requirements.

      155 THE EAST MALL · Mar 20, 2023 · 140 m away
    • Building permit

      City of Toronto NCP # SR3787065442/ WS3790506297.Installation design of the residential washer & dryer, purchased by the Toronto Fire Services for FireHall in accordance with Provincial and City requirements.

      155 THE EAST MALL · Mar 20, 2023 · 140 m away
    • Building permit

      Localized reinforcing of 10 impact damaged steel columns throughout the warehouse area.

      75 MEDULLA AVE · Dec 5, 2022 · 246 m away

    Neighbourhood: Etobicoke City Centre

    About the area around the lot, not the lot itself.

    Nearest station
    Kipling Station29 min walk
    Nearest TTC stop
    North Queen St at The East Mall7 min walk
    Nearest traffic count
    9,849 vehicles in 8 hMedulla Ave / North Queen St, 450 m away, Jun 27, 2023
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Silverhill Park15 min walk
    Cloverdale Park16 min walk

    2021 Census

    FigureEtobicoke City CentreMedian neighbourhood
    Median household income (2020)$83,000$84,500
    Households that own their home50%54%
    Population (2021)23,60016,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEtobicoke City CentreCity median
    Assault844.4636.3
    Robbery187.769.5
    Shootings16.210.5
    Auto theft601.8192.6
    Theft over $5,000200.646.1
    Break and enter210.3172.8
    Theft from vehicles278.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.