Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register4 building permits open, the oldest since 2022
Needs a closer lookStill open in the City's records: 22 136259 (demolish existing building for future residential development, 2022, status Permit Issued); 22 136258 (demolish existing building for future residential development, 2022, status Inspection); 22 136243 (demolish existing building for future residential development, 2022, status Permit Issued); and 1 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 178700 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 22 195546 (Building Alterations permit to accomodate the heritage retention and restoration of 234..., 2026); 22 148063 (Full building demolition front retention and backfill to grade, 2026); 22 147899 (Full building demolition front retention and backfill to grade, 2026); and 6 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
56 records on file: more than at 100% of Toronto houses (median 0).
- Building permit22 195546Permit Issued
Building Alterations permit to accomodate the heritage retention and restoration of 234-236, 240 and 242 King Street East in line with the approved heritage conservation plan (related to permit No.21 248807 NB, 22 136259 DM)
Nov 23, 2026 · 250 KING ST E - Building permit22 148063Permit Issued
Full building demolition front retention and backfill to grade
Nov 19, 2026 · 242 KING ST E - Building permit22 147899Permit Issued
Full building demolition front retention and backfill to grade
Nov 19, 2026 · 240 KING ST E - Building permit22 147863Permit Issued
Full building demolition front retention and backfill to grade
Nov 19, 2026 · 234 KING ST E - Building permit25 248807Open
Deferred Fees from folder 21 248807 (RSN-5037464) ZoningProcess RSN 71825329
Nov 27, 2025 · 250 KING ST E - By-law investigation25 178700 PRS 00 IRClosed
Property Standards
Jun 17, 2025 · 240 KING ST E - By-law investigation25 200137 WST 00 IVClosed
Notice Issued Waste
Jun 11, 2025 · 240 KING ST E - Building permit25 148155Application Received
A residential public corridor make-up air system forming a high-rise smoke control system that would qualify for exemption to waive smoke dampers at the residential public corridor air transfer openings for the proposed mixed use building to be located at 250 King Street East in Toronto, Ontario
Apr 23, 2025 · 250 KING ST E
Show 48 older records
- Building permit25 147353Approved
Proposal for the proposed removal of smoke dampers.
Apr 22, 2025 · 250 KING ST E - Building permit24 229576Cancelled
2 wall signs**ALLURE**
Oct 22, 2024 · 250 KING ST E - Building permit24 226136Cancelled
2 wall signs**ALLURE**
Oct 15, 2024 · 250 KING ST E - Building permit24 213343Cancelled
2 Wall Sign
Sep 16, 2024 · 250 KING ST E - Building permit24 208987Approved
Alternative solution proposal for standpipe.
Sep 6, 2024 · 250 KING ST E - Development application22 215914 STE 13 OZClosed
Application to Lift the 'H' from Zoning By-law
Oct 12, 2022 · 236 KING ST E · City file - Zoning review21 176715 PSPClosedOct 6, 2022 · 250 KING ST E
- Building permit22 136259Permit Issued
demolish existing building for future residential development
Aug 25, 2022 · 248 KING ST E - Building permit22 136258Inspection
demolish existing building for future residential development
Aug 3, 2022 · 246 KING ST E - Building permit22 136243Permit Issued
demolish existing building for future residential development
Aug 3, 2022 · 244 KING ST E - Building permit22 147931Permit Issued
Full buildng demolition front retention and backfill to grade
Jul 13, 2022 · 238 KING ST E - Zoning review20 233160 PRZClosedJun 10, 2022 · 236 KING ST E
- Building permit21 248807Under Review
Proposal to retain the facade of the existing building and construct a new 43 storey mixed-use building with 509 residential units; retail at grade and 4 levels of underground parking garage.22-143245 PB
Dec 15, 2021 · 250 KING ST E - Development application21 228810 STE 13 CDDraft Plan Approved
Draft Plan of Condominium for 488 units.
Oct 21, 2021 · 250 KING ST E · City file - Development application21 176715 STE 13 SANOAC Issued
Site Plan application for a 40-storey mixed-use building with 537 square metres of non-residential gross floor area, 33507 square metres of residential gross floor area, and a total of 514 dwelling units.
Jun 28, 2021 · 250 KING ST E · City file - Development application20 233160 STE 13 OZClosed
The City has received an application to amend the Zoning By-law to allow a 40-storey (123.1 metres plus a 9.75-metre mechanical penthouse) mixed-use building with ground level retail.
Dec 22, 2020 · 234 KING ST E · City file - Building permit20 226672Cancelled
To erect and display two wall signs and one projecting sign, all illuminated.****TOKYO SMOKE****
Dec 8, 2020 · 250 KING ST E - Building permit20 186039Closed
PROPOSAL FOR: 1-INTERIOR RENO FOR A NEW RETAIL STORE TENANT (CANNABIS), 2-HVAC PLAN, 3-PLUMBING-ADD 4 FIXTURES
Oct 15, 2020 · 244 KING ST E - Building permit20 183364Closed
Proposal for interior alterations to construct a new retail space (Cannabis store - 'Tokyo Smoke') in an existing building owned by one owner on two separate lots (248 & 250 King St E). Scope of work incl. demo. of exist. walls, build new office & storage area. [Tied to permit #20 166988 BLD 00 BA for 250 King St E] [Permit #'s 13 278588 BLD 00 BA & 13 278583 BLD 00 BA to combine the floors & bring 248 & 250 King St W back to base building condition for the previous tenant.]
Sep 9, 2020 · 248 KING ST E - Building permit20 166988Closed
Proposal for interior alterations to construct a new retail space (Cannabis store - 'Tokyo Smoke') in an existing building owned by one owner on two separate lots (248 & 250 King St E). Scope of work incl. demo. of exist. walls, build new office & storage area. [Tied to permit #20 183364 BLD 00 BA for 248 King St E] [Permit #'s 13 278588 BLD 00 BA & 13 278583 BLD 00 BA to combine the floors & bring 248 & 250 King St W back to base building condition for the previous tenant.]
Sep 9, 2020 · 250 KING ST E - Building permit17 146409Closed
install 1 backflow preventer
May 15, 2017 · 238 KING ST E - Building permit16 248694Closed
Proposal to install a backflow preventor in existing mixed use building.
Dec 6, 2016 · 240 KING ST E - Building permit16 200522Closed
Proposal to install a 1 1/4 inch backflow prevention device.
Aug 24, 2016 · 236 KING ST E - Zoning review15 192564 LTOClosedJul 17, 2015 · 248 KING ST E
- Building permit14 209087Closed
Maintain recording studio on 2nd and 3rd floors. Build rooftop patio; build stair and rooftop stair enclosure to roof.
Oct 23, 2014 · 236 KING ST E - Building permit14 224204Closed
To erect and display two wall signs and one projecting sign, all illuminated and displaying static copy and in conjunction with a coffee shop. One of the proposed wall signs to be erected on the southerly facing building elevation is to be 5.49 metres in length by 0.45 metres in width at a height of 3.40 metres. One of the proposed wall signs to be erected on the easterly facing building elevation is to be 4.02 metres in length by 0.45 metres in width at a height of 3.40 metres. The projecting sign is to be erected on the southerly facing building elevation and is to be 0.61 metres in length by 0.61 metres in width at a height of 4.06 metres. **Aroma Espresso Bar**
Oct 15, 2014 · 250 KING ST E - Building permit13 278588Closed
REVISION # 01 - TO PERMIT - 2 STOREY COMMERCIAL SHELL - STRUCTURAL ALTERATIONS & ADD HVAC SHAFTS & STRUCTURAL SUPPORT FOR ROOFTOP UNITS (tenant to be responsible for HVAC permit) - June 25, 2014 MS.
Jul 28, 2014 · 250 KING ST E - Building permit13 278583Closed
REVISION #01 - TO PERMIT - 2 STOREY COMMERCIAL SHELL - STRUCTURAL ALTERATIONS & ADD HVAC SHAFTS & STRUCTURAL SUPPORT FOR ROOFTOP UNITS (tenant to be responsible for HVAC permit) - June 25, 2014 MS.
Jul 28, 2014 · 248 KING ST E - Building permit14 145401Closed
Proposal for interior alterations to ground and basement floor of existing building for "Aroma Cafe" with 30 seats. Proposal includes HVAC, PLB and an outdoor patio with 20 seats.
Jul 23, 2014 · 250 KING ST E - Building permit10 289885Closed
Permit for backflow valve in basement of existing restaurant under 30 seats
Nov 18, 2010 · 246 KING ST E - Zoning review09 141041 LTOClosedMay 25, 2009 · 250 KING ST E
- Building permit08 200932Closed
Proposal to install fire escape from 2nd flor to grade at rear of existing non-residential building.
Oct 30, 2008 · 246 KING ST E - Building permit08 118892Closed
Kitchen exhaust hood for existing restaurant.
Apr 22, 2008 · 246 KING ST E - Zoning review07 282685 ZALClosedNov 28, 2007 · 236 KING ST E
- Zoning review07 247757 LPRClosedJul 26, 2007 · 246 KING ST E
- Building permit05 112477Closed
Revision to increase occupant load from 66 seats to 141 persons and patio 32 persons. 234 king st e
Dec 14, 2005 · 236 KING ST E - Zoning review05 202715 LTOClosedNov 15, 2005 · 236 KING ST E
- Building permit05 178339Closed
FSU to include sprinklers and fire alarm system.
Oct 4, 2005 · 236 KING ST E - Building permit05 135914Cancelled
To provide shop drawing for sprinkler system in connection with bld permit 05-
May 26, 2005 · 236 KING ST E - Building permit02 166345Closed
Make interior alterations to 3rd floor office for communications and broadcasting establishment. "historical" PERMIT MAILED 12/03/02
Nov 28, 2002 · 236 KING ST E - Zoning review01 012660 LTOClosedMay 10, 2001 · 240 KING ST E
- Building permit00 344004Closed
install h.v.a.c. system to 1st, floor for office use-- cost incl. under file #00-341519 tenant: Hicks, Block, Adams
Oct 23, 2000 · 238 KING ST E - Building permit00 341519Closed
make interior alterations to 1st, 2nd and 3rd floors for office use. tenant: Hicks, Block, Adams
Oct 4, 2000 · 238 KING ST E - Zoning review98 025533 LTOClosedJan 16, 1998 · 244 KING ST E
- Zoning review91 026853 LTOClosedAug 29, 1991 · 238 KING ST E
- Zoning review91 026279 LTOClosedApr 5, 1991 · 250 KING ST E
- Zoning review90 028103 LTOClosedJan 25, 1990 · 236 KING ST E
- Zoning review83 026186 LTOClosedAug 18, 1983 · 240 KING ST E
Check before you build
Site-specific exception 900.11.10(779)
Needs a closer look17 site-specific rules and 17 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 234-250 King Street East and 162 Princess Street, if the requirements of By-law 1151-2022(OLT) are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations
- Rule B
to (P) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum of 82.5 metres and the elevation of the highest point of the building or structure
- Rule C
Despite Regulation 40.10.40.10(1), the permitted maximum height of a building or structure is the number in metres following the letters "HT" as shown on Diagram 3 of By-law 1151-2022(OLT)
- Rule D
Despite Regulation 40.10.40.10(7), the permitted maximum number of storeys in a building is the number following the letters "ST" as shown on Diagram 3 of By-law 1151-2022(OLT); and (i) for the purpose of this exception, a mezzanine does not constitute a storey
- Rule E
Despite Regulations 40.5.40.10(3) to (8) and (C) above, the following equipment and structures may project beyond the permitted maximum height shown on Diagram 3 of By-law 1151-2022(OLT): (i) mechanical penthouse, by a maximum of 2.0 metres; (ii) window washing equipment, by a maximum of 6.0 metres; (iii) glass feature strips and associated structures for support, mechanical equipment, lightning rods, wind screens, elevator overruns, chimneys, vents, pergolas, eaves, screens, stairs, stair enclosures, and elements or structures on the roof used for open air recreation, safety and wind protection purposes, by a maximum of 3.0 metres; (iv) fences and safety railings, trellises, privacy screens, balcony and terrace dividers, roof access hatches, by a maximum of 3.0 metres; (v) balustrades, guard rails, parapets, awnings, railings, green roof elements, and dividers, pergolas, eaves, screens, stairs, stair enclosures, roof drainage, window sills, chimneys, vents, terraces, light fixtures, landscaping , by a maximum of 3.0 metres
- Rule F
Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area of all buildings and structures on the lot is 34,500 square metres, of which: (i) the permitted maximum gross floor area for residential uses is 33,900 square metres; (ii) the permitted maximum gross floor area for non-residential uses is 600 square metres
- Rule G
Despite Regulation 40.10.40.50(1)(A) and (B) and 40.10.40.50(2), amenity space must be provided at a minimum rate of 3.3 square metres per dwelling unit , of which: (i) at least 1.6 square metres for each dwelling unit is indoor amenity space ;`
- Rule H
Despite Regulation 40.10.40.70(1), the required minimum building setbacks are as shown in metres on Diagram 3 of By-law 1151-2022(OLT)
- Rule I
Despite Regulation 40.10.40.80(1), the required separation of main walls are as shown in metres on Diagram 3 of By-law 1151-2022(OLT)
- Rule J
Despite Clause 40.10.40.60 and (H) and (I) above, the following elements may encroach into the required minimum building setbacks and main wall separation distances as follows: (i) terraces and balconies, by a maximum of 2.0 metres; (ii) despite (i) above, balconies above a height of 24.3 metres (Canadian Geodetic Datum of 106.8 metres) may only project within the areas illustrated as "Balcony Projection Zone" as shown on Diagram 3; (iii) ornamental elements, parapets, pillars, trellises, eaves, and window sills, by a maximum of 1.0 metres; (iv) cornices, light fixtures, landscape features, patios, decks, planters, ventilation shafts, guardrails, balustrades, railings, stairs, stair enclosures, doors, wheelchair ramps, fences, screens, site servicing features, awnings and canopies, and underground garage ramps and associated structures , by a maximum of 1.5 metres
- Rule K
Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided in accordance with the following: (i) a minimum of 0.17 residential occupant parking spaces for each dwelling unit ; (ii) a minimum of 0.06 parking spaces for each dwelling unit for the use of residential visitors or public parking ; and (iii) no parking spaces are required for non-residential uses
- Rule L
Despite Regulation 200.15.1(4), accessible parking spaces may be located at any location on any level of the underground parking garage
- Rule M
Despite Clause 220.5.10.1, one (1) Type "G" and one (1) Type "C" loading space must be provided and maintained on the lot
- Rule N
Despite Regulation 230.5.1.10(10), both "short-term" and "long-term" bicycle parking spaces may also be located in a stacked bicycle parking space
- Rule O
Despite Regulations 230.5.10.1(1)(3) and (5) and Table 230.5.10.1(1), bicycle parking spaces must be provided in accordance with the following minimum rates: (i) 0.9 "long-term" bicycle parking spaces for each dwelling unit ; (ii) 0.1 "short-term bicycle parking spaces for each dwelling unit ; (iii) no "long term" bicycle parking spaces are required for non-residential uses; (iv) three (3) "short-term" bicycle parking spaces for all non-residential uses
- Rule P
Of the total number of dwelling units provided on the lot : (i) a minimum of ten percent must be three-bedroom dwelling units ; and (ii) in addition to the number of three-bedroom dwelling units required in (i) above, a minimum of fifteen percent of the total number of dwelling units must contain two bedrooms or more.
- Rule Q
A building or structure not constructed, used or enlarged in compliance with Regulations (B) to (P) above, must comply with Regulation 900.11.10(339). Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
On 234-250 King Street East and 162 Princess Street, if the requirements of By-law 1151-2022(OLT) are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations
- Older by-law B
to (P) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum of 82.5 metres and the elevation of the highest point of the building or structure
- Older by-law C
Despite Regulation 40.10.40.10(1), the permitted maximum height of a building or structure is the number in metres following the letters "HT" as shown on Diagram 3 of By-law 1151-2022(OLT)
- Older by-law D
Despite Regulation 40.10.40.10(7), the permitted maximum number of storeys in a building is the number following the letters "ST" as shown on Diagram 3 of By-law 1151-2022(OLT); and (i) for the purpose of this exception, a mezzanine does not constitute a storey
- Older by-law E
Despite Regulations 40.5.40.10(3) to (8) and (C) above, the following equipment and structures may project beyond the permitted maximum height shown on Diagram 3 of By-law 1151-2022(OLT): (i) mechanical penthouse, by a maximum of 2.0 metres; (ii) window washing equipment, by a maximum of 6.0 metres; (iii) glass feature strips and associated structures for support, mechanical equipment, lightning rods, wind screens, elevator overruns, chimneys, vents, pergolas, eaves, screens, stairs, stair enclosures, and elements or structures on the roof used for open air recreation, safety and wind protection purposes, by a maximum of 3.0 metres; (iv) fences and safety railings, trellises, privacy screens, balcony and terrace dividers, roof access hatches, by a maximum of 3.0 metres; (v) balustrades, guard rails, parapets, awnings, railings, green roof elements, and dividers, pergolas, eaves, screens, stairs, stair enclosures, roof drainage, window sills, chimneys, vents, terraces, light fixtures, landscaping , by a maximum of 3.0 metres
- Older by-law F
Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area of all buildings and structures on the lot is 34,500 square metres, of which: (i) the permitted maximum gross floor area for residential uses is 33,900 square metres; (ii) the permitted maximum gross floor area for non-residential uses is 600 square metres
- Older by-law G
Despite Regulation 40.10.40.50(1)(A) and (B) and 40.10.40.50(2), amenity space must be provided at a minimum rate of 3.3 square metres per dwelling unit , of which: (i) at least 1.6 square metres for each dwelling unit is indoor amenity space ;`
- Older by-law H
Despite Regulation 40.10.40.70(1), the required minimum building setbacks are as shown in metres on Diagram 3 of By-law 1151-2022(OLT)
- Older by-law I
Despite Regulation 40.10.40.80(1), the required separation of main walls are as shown in metres on Diagram 3 of By-law 1151-2022(OLT)
- Older by-law J
Despite Clause 40.10.40.60 and (H) and (I) above, the following elements may encroach into the required minimum building setbacks and main wall separation distances as follows: (i) terraces and balconies, by a maximum of 2.0 metres; (ii) despite (i) above, balconies above a height of 24.3 metres (Canadian Geodetic Datum of 106.8 metres) may only project within the areas illustrated as "Balcony Projection Zone" as shown on Diagram 3; (iii) ornamental elements, parapets, pillars, trellises, eaves, and window sills, by a maximum of 1.0 metres; (iv) cornices, light fixtures, landscape features, patios, decks, planters, ventilation shafts, guardrails, balustrades, railings, stairs, stair enclosures, doors, wheelchair ramps, fences, screens, site servicing features, awnings and canopies, and underground garage ramps and associated structures , by a maximum of 1.5 metres
- Older by-law K
Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided in accordance with the following: (i) a minimum of 0.17 residential occupant parking spaces for each dwelling unit ; (ii) a minimum of 0.06 parking spaces for each dwelling unit for the use of residential visitors or public parking ; and (iii) no parking spaces are required for non-residential uses
- Older by-law L
Despite Regulation 200.15.1(4), accessible parking spaces may be located at any location on any level of the underground parking garage
- Older by-law M
Despite Clause 220.5.10.1, one (1) Type "G" and one (1) Type "C" loading space must be provided and maintained on the lot
- Older by-law N
Despite Regulation 230.5.1.10(10), both "short-term" and "long-term" bicycle parking spaces may also be located in a stacked bicycle parking space
- Older by-law O
Despite Regulations 230.5.10.1(1)(3) and (5) and Table 230.5.10.1(1), bicycle parking spaces must be provided in accordance with the following minimum rates: (i) 0.9 "long-term" bicycle parking spaces for each dwelling unit ; (ii) 0.1 "short-term bicycle parking spaces for each dwelling unit ; (iii) no "long term" bicycle parking spaces are required for non-residential uses; (iv) three (3) "short-term" bicycle parking spaces for all non-residential uses
- Older by-law P
Of the total number of dwelling units provided on the lot : (i) a minimum of ten percent must be three-bedroom dwelling units ; and (ii) in addition to the number of three-bedroom dwelling units required in (i) above, a minimum of fifteen percent of the total number of dwelling units must contain two bedrooms or more.
- Older by-law Q
A building or structure not constructed, used or enlarged in compliance with Regulations (B) to (P) above, must comply with Regulation 900.11.10(339). Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 1,919 m²
- Frontage
- 40.8 m
- Depth
- 53 m
- Street
- Princess St
- Corner lot
- Yes, also on King St E53 m along it
- Public lane
- Duke Mews, 53.7 m along it
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- 90 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
- King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: King Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR SS1 (x779) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: elm (10 cm), honey locust (10 cm), elm (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%15 of 15 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 38
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.
53 ONTARIO ST · Sep 23, 2026 · 221 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 368 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 1299-2023) for a mixed-use building (45 and 49-storeys), by increasing the total building height, the height of the podium, and mechanical penthouse vertical projections, equipment, structures and screening, and cladding encroachments of Building A. Also, to reduce the number of bicycle parking spaces and to alter the bicycle parking locations. A related Site Plan Approval application (under File Number 21 148154 STE 13 SA) is currently under review and consideration. There will be a total of 1,227 residential dwelling units (including approximately 245 affordable housing units) on this lot.
49 ONTARIO ST · Aug 13, 2025 · 200 m away - Minor varianceApproved
To alter the existing 25-storey mixed-use building by constructing a partial mezzanine (46.83 m2) above the ground floor unit (Unit 104) for a new dental office.
57 ONTARIO ST · Mar 26, 2025 · 233 m away - Minor varianceApproved
To alter part of a mixed-use development (Buildings B and C) comprised of two apartment towers (total of 795 residential units), 6,997 m² of retail space, 7,715 m² of office space, and a 1400 m² public park, approved under Site Specific By-laws 226-2023(OLT) and 227-2023(OLT), by converting approximately 7,715 m² of office area within Building C into 64 residential units (of which 21 of the units will be Live-Work units). Also, by permitting and altering the type of personal service shop uses within dwelling units, permitting a home occupation to be located within a dwelling unit in Building B or C for music or dance instruction and training, and reducing the number of non-residential parking spaces.
261 QUEEN ST E · Jun 5, 2024 · 333 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots (Building B and Building C) and to create new reciprocal stratified easements/rights-of-way.
90 ONTARIO ST · Nov 4, 2027 · 289 m away - Building permit
Building Alterations permit to accomodate the heritage retention and restoration of 234-236, 240 and 242 King Street East in line with the approved heritage conservation plan (related to permit No.21 248807 NB, 22 136259 DM)
250 KING ST E · Nov 23, 2026 · 24 m away - Building permit
Interior alterations to units 101 & 102 for building 204 King St E.
214 KING ST E · Nov 19, 2026 · 109 m away - Building permit
Full building demolition front retention and backfill to grade
242 KING ST E · Nov 19, 2026 · 1 m away - Building permit
Full building demolition front retention and backfill to grade
240 KING ST E · Nov 19, 2026 · 11 m away - Building permit
Full building demolition front retention and backfill to grade
234 KING ST E · Nov 19, 2026 · 25 m away - Building permit
Proposal for mag lock installations on lobby doors Level 2 to Level 8.
25 ONTARIO ST · Nov 17, 2026 · 144 m away - Zoning review
Cancelled
180 FRONT ST E · Nov 5, 2026 · 114 m away - Zoning review
Closed
178 FRONT ST E · Nov 5, 2026 · 118 m away - Zoning review
Cancelled
201 FREDERICK ST · Nov 3, 2026 · 157 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- King Station14 min walk
- Nearest TTC stop
- King St East at Sherbourne St1 min walk
- Nearest cycling route
- Sherbourne StCycle Track, 1 min walk
- Nearest traffic count
- 4,459 vehicles in 8 hKing St E / Princess St, 50 m away, Jul 12, 2016
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 2 with cyclists
- Parks
- David Crombie Park5 min walk
- Parliament Square Park6 min walk
- Moss Park6 min walk
Schools within 1 km
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 4 min walk
- MARKET LANE JR & SR PUBLIC SCHOOL English Public 5 min walk
- LIBERTY PREP SCHOOL Private 7 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk
- ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.