Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2015
Needs a closer lookStill open in the City's records: 15 143982 (Revision to fuel oil piping system and controls, 2015, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 172201 000 00 IR (Adequate Heat, 2026); 26 172200 000 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 61 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 98 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 98 units, built 2009).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 172201 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 160 JARVIS ST - By-law investigation26 172200 000 00 IRClosed
Property Standards
Jun 1, 2026 · 160 JARVIS ST - Building permit22 198949Closed
Installation of magnetic locks and card readers on two interior doors.
Sep 27, 2022 · 160 JARVIS ST - Building permit15 143982Permit Issued
Revision to fuel oil piping system and controls
Apr 22, 2015 · 160 JARVIS ST - Building permit11 191419Closed
To erect and display one illuminated wall sign, containing electronic readograph copy, on the easterly facing building wall in conjunction with a charitable organization located on the premises. **The Salvation Army**
Jun 28, 2011 · 160 JARVIS ST - Building permit10 261272Closed
To erect and display one wall sign at the sixth storey of the easterly building elevation in conjunction with an existing office building. **Salvation Army**
Sep 22, 2010 · 160 JARVIS ST - Building permit10 186311Closed
Proposal to install 1 illuminated first party overhanging structure sign on the east face of existing "Salvation Army" building.
Jul 21, 2010 · 160 JARVIS ST - Zoning review10 222059 ZSVClosedJul 16, 2010 · 160 JARVIS ST
Show 2 older records
- Zoning review10 186329 ZPRClosedJun 1, 2010 · 160 JARVIS ST
- Building permit09 189805Closed
Installation of 36 maglocks from the ground floor through tot he 7th floor.
Dec 3, 2009 · 160 JARVIS ST
Lot facts
- Area
- 2,975 m²
- Frontage
- 31.4 m
- Depth
- 96.5 m
- Street
- Shuter St
- Corner lot
- Yes, also on Jarvis St96.5 m along it
- Public lane
- Harbour Light Lane, 103.6 m along it
- House footprint
- 1,767 m²
- Back yard
- 2.9 mhouse to rear lot line
- Side yards
- 0 m and 4.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 11house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, silver (18 cm), elm, accolade (15 cm), elm (13 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%32 of 32 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 13
- Development applications
- 42
Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 330 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 452 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 59 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 95 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 103 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 207 m away - Building permit
1 wall sign**PHARMASAVE**
213 A QUEEN ST E · Nov 23, 2026 · 296 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 191 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 270 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 168 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 177 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 112 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 59 m away - Zoning review
Closed
88 QUEEN ST E · Oct 14, 2026 · 154 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 242 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station8 min walk
- Nearest TTC stop
- Queen St East at Jarvis St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 10,663 vehicles in 8 hJarvis St / Shuter St, 60 m away, Dec 3, 2022
- Serious collisions within 500 m
- 202021–2026, killed or seriously injured: 3 fatal, 14 with pedestrians, 0 with cyclists
- Parks
- 45 Dalhousie St Park2 min walk
- Arena Gardens2 min walk
- Moss Park2 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.