Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register2 building permits open, the oldest since 2015
Needs a closer lookStill open in the City's records: 19 157510 (Proposal for interior alterations to corridors and common areas of an existing apartmen..., 2019, status Inspection); 15 147156 (Fire Alarm control panel replacement and audibility upgrade, 2015, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 172664 000 00 IR (Adequate Heat, 2026); 26 172663 000 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 24 151933 (REV 01 - Roof reinforcement / replacement, new HVAC system with new heaters and new plu..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A347/01TO (Maintain an increase in the number of dwelling units in the existing apartment building..., 2001).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 98 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (5 storeys, 69 units, built 1805).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
20 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 172664 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 160 HURON ST - By-law investigation26 172663 000 00 IRClosed
Property Standards
Jun 1, 2026 · 160 HURON ST - By-law investigation26 173841 000 00 IRRequest Received
Waste
May 29, 2026 · 160 HURON ST - Building permit24 151933Revision Issued
REV 01 - Roof reinforcement / replacement, new HVAC system with new heaters and new plumbing system for new layoutVerify existing framing in the course of construction, infill gasps in decking and edge of diaphragm where directed, install struts to tie rafters to tie ends to floor diaphragm, add fasteners at connection to trimmer joists, install face-mount hangers at valley to ridge intersection, install new rafter ties throughout, sheathe interior load-bearing cable stud wall where directed, install load-bearing knee-wall extension/column extensions where directed, reinforce ridge beams and valley beams where stated.
Jul 18, 2025 · 160 HURON ST - Building permit24 151894Closed
Verify existing framing in the course of construction, infill gasps in decking and edge of diaphragm where directed, install struts to tie rafters to tie ends to floor diaphragm, add fasteners at connection to trimmer joists, install face-mount hangers at valley to ridge intersection, install new rafter ties throughout, sheathe interior load-bearing cable stud wall where directed, install load-bearing knee-wall extension/column extensions where directed, reinforce ridge beams and valley beams where stated.
Jun 25, 2024 · 160 HURON ST - Building permit23 110655Closed
Installation of a new premise isolation back flow preventer (DCVA) on the domestic service to replace an old un repairable one.
Mar 6, 2023 · 160 HURON ST - Building permit20 180731Closed
Proposal for interior alterations to apartment Unit 210.
Oct 7, 2020 · 160 HURON ST - Zoning review20 192276 ZZCCancelledSep 11, 2020 · 160 HURON ST
Show 12 older records
- Building permit19 157510Inspection
Proposal for interior alterations to corridors and common areas of an existing apartment building.
Jul 26, 2019 · 160 HURON ST - Building permit19 125083Closed
Interior alterations to unit 404
May 24, 2019 · 160 HURON ST - Building permit17 237225Closed
Proposal to install an electrically supervised sprinkler system in an existing apartment building as per the measures approved by Toronto Fire Services.
Oct 26, 2017 · 160 HURON ST - Building permit15 147156Inspection
Fire Alarm control panel replacement and audibility upgrade
May 22, 2015 · 160 HURON ST - Building permit14 191858Closed
Actual scope of work: Partition in service room and rebuilding partial slab.Electrical works not to be included in review.
Aug 19, 2014 · 160 HURON ST - Building permit13 264051Cancelled
To re-roof (492 m2) the rooftop of the existing five storey apartment building.
Nov 12, 2013 · 160 HURON ST - Building permit13 225413Closed
Revision to rebuild 36 balconies in existing apartment building.
Sep 13, 2013 · 160 HURON ST - Building permit09 164156Closed
Proposal to install one backflow prevention device (BFP to be installed on Sprinkler system)
Oct 1, 2009 · 160 HURON ST - Building permit09 163185Closed
Proposal to install one backflow prevetion device
Oct 1, 2009 · 160 HURON ST - Zoning review06 150052 ZPUCancelledJun 23, 2006 · 160 HURON ST
- Building permit00 357353Closed
alterations to penthouse roof and walls: insulation and cladding ADDITION OF 5TH FLOOR FOR 1 ADDITIONAL UNIT & NEW DWELLING UNIT IN THE BASEMENT
Sep 7, 2001 · 160 HURON ST - Minor varianceA347/01TOApproved
Maintain an increase in the number of dwelling units in the existing apartment building and coach house, from 67 to 69, by maintaining one dwelling unit in the basement and one in the existing rooftop penthouse.
Jun 26, 2001 · 160 HURON ST
Check before you build
Site-specific exception 900.2.10(835)
Needs a closer look1 site-specific rule and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4).
- Older by-law A
Section 12(1) 116 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 233 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 256 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(5)(h) of former City of Toronto By-law 438-86
7 parts for other addresses
- E On or between the even numbered addresses of 40-42 Baldwin St., the odd numbered addresses of 181-201A Beverley St., the odd numbered addresses of 201-203 …
- F On the lands municipally known as 136 Beverley St. in 1988, Section 12(2) 77 of former City of Toronto By-law 438-86
- G On 206 Beverley St., former City of Toronto by-law 20-72
- H On 38 Cecil St., former City of Toronto by-law 699-82
- I On the even numbered addresses of 30-36 D'Arcy St., former City of Toronto by-law 82-93
- J On 6 Henry St., former City of Toronto by-law 42-76
- K On 125 Huron St., former City of Toronto by-law 9420.
Lot facts
- Area
- 1,138 m²
- Frontage
- 18.7 m
- Depth
- 61.4 m
- Street
- Huron St
- Corner lot
- No
- Public lane
- Ln S College W Huron, 69.6 m along it
- House footprint
- 360 m²roof up to 16.6 m
- Back yard
- 22.6 mhouse to rear lot line
- Side yards
- 2.2 m and 3.2 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- 13 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Queens Park. The lot is inside the Queens Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 611). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Minimum frontage 4.5 m. Frontage is about 18.7 m: meets the zone minimum. Source
- Zone R (f4.5; d1.0) (x835) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, silver queen (27 cm), maple, silver (4 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 95%18 of 19 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 4
- Multiplex permits
- 20
- Development applications
- 12
Within 300 m, last 10 years. 26 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing rear two-storey detached ancillary building (containing one laneway suite and a two-car garage, abutting the laneway) by constructing a one-storey addition (patio enclosure) on the south side of this building. There is a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).
122 D'ARCY ST · Jul 15, 2026 · 305 m away - Minor varianceApproved
To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).
23 ROSS ST · Apr 1, 2026 · 165 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
150 BEVERLEY ST · Nov 19, 2025 · 411 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing rear additions on the first and third levels.
32 E OXFORD ST · Sep 3, 2025 · 247 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.
28 D'ARCY ST · Feb 26, 2025 · 463 m away
Latest activity nearby
- Zoning review
Not Started
462 SPADINA AVE · Nov 23, 2026 · 169 m away - Minor variancePending
Accepted
77 BALDWIN ST · Nov 17, 2026 · 273 m away - Building permit
Proposal for interior alterations for a restaurant
285 COLLEGE ST · Nov 17, 2026 · 225 m away - Building permit
Revision 01: interior alterations and a 3 storey addition at rear yard. Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR
221 BEVERLEY ST · Nov 12, 2026 · 254 m away - Building permit
Proposal for repair and reinstate a portion of the dwelling due to vehicle impact damage
196 BEVERLEY ST · Nov 10, 2026 · 252 m away - Building permit
Interior alteration to existing apartment 1&2 (first floor) of existing 3 storey Multi Tennant Residential detached dwelling. Replacement of existing basement stair enclosure.
198 BEVERLEY ST · Nov 9, 2026 · 246 m away - Building permit
HVAC permit for as built heating and cooling system, relocation of existing heat pump.
160 BALDWIN ST · Nov 5, 2026 · 256 m away - Building permit
Proposal for sprinkler modification and fire alarm audible device relocation in the fitness room.
251 COLLEGE ST · Nov 4, 2026 · 104 m away - Building permit
Proposed interior alterations, 3rd floor addition, and basement walk-out in front yard.
77 BALDWIN ST · Oct 28, 2026 · 273 m away - Zoning review
Notice Sent
78 BALDWIN ST · Oct 22, 2026 · 229 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- Queen's Park Station11 min walk
- Nearest TTC stop
- Spadina Ave at College St South Side2 min walk
- Nearest cycling route
- College StCycle Track, 2 min walk
- Nearest traffic count
- 1,732 vehicles in 8 hCecil St / Huron St, 90 m away, Mar 28, 2013
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 5 with cyclists
- Parks
- Glasgow Street Parkette1 min walk
- Lillian H. Smith Park1 min walk
- Julius Deutsch Park1 min walk
Schools within 1 km
- BRAEMAR COLLEGE PRIVATE SECONDARY SCHOOL Private 2 min walk
- BEVERLEY & SUBWAY ACADEMY TWO English Public 4 min walk
- CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 6 min walk
- LORD LANSDOWNE JR SR & DA VINCI English Public 6 min walk
- HEYDON PARK SECONDARY SCHOOL English Public 6 min walk
- RONALD MCDONALD HOUSE Private 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.