Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 265625 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 Committee of Adjustment files on this lot
Good to know2 approved. A0498/23TEY (To construct a new 14-storey building (the 15th storey will be used for mechanical equi..., 2023); B0054/11TEY (To obtain consent to sever the property into two lots, 2011).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
14 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 265625 PRS 00 IRClosed
Property Standards
Nov 5, 2026 · 202 JARVIS ST - By-law investigation26 168704 GRA 00 IRNotice Issued
Graffiti
May 27, 2026 · 202 JARVIS ST - By-law investigation25 105578 GRA 00 IVClosed
Notice Issued Graffiti
Jan 6, 2025 · 202 JARVIS ST - By-law investigation25 101578 GRA 00 IRClosed
Graffiti
Jan 6, 2025 · 202 JARVIS ST - Minor varianceA0498/23TEYApproved
To construct a new 14-storey building (the 15th storey will be used for mechanical equipment) with a front third storey roof terrace, east and west side roof terraces on the third, fifth and seventh storey, a rear seventh storey roof terrace, and a complete roof terrace on the roof level. The mixed-use building will contain classroom spaces, faculty offices, and common areas for academic purposes.
Aug 9, 2023 · 202 JARVIS ST - Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 202 JARVIS ST · City file - Zoning review22 206596 ZAPNotice SentSep 21, 2022 · 202 JARVIS ST
- Zoning review18 271373 POZClosedMar 25, 2021 · 202 JARVIS ST
Show 6 older records
- Zoning review20 198309 PSPClosedOct 16, 2020 · 202 JARVIS ST
- Development application18 271373 STE 13 OZClosed
Official Plan and Zoning By-law Amendment to permit a 44-storey mixed-use building consisting of a 13-storey base component for institutional and retail use, and a 31-storey tower component for student residences. The proposal includes 57,525 square metres of gross floor area, of which 36,784 square metres is institutional, 17,599 square metres is residential, and 181 square metres of retail
Dec 21, 2018 · 166 DUNDAS ST E · City file - Building permit17 185058Closed
Temporary tent from June 23 - June 26, 2017 in parking lot for Ryerson
Jun 26, 2017 · 202 JARVIS ST - Zoning review13 273348 LPRClosedDec 3, 2013 · 202 JARVIS ST
- Zoning review13 151996 LPRClosedApr 17, 2013 · 202 JARVIS ST
- Consent (lot split)B0054/11TEYApproved
To obtain consent to sever the property into two lots.
Sep 14, 2011 · 202 JARVIS ST
Check before you build
Site-specific exception 900.11.10(307)
Needs a closer look24 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands municipally known as 202 Jarvis Street and 160-166 Dundas Street East, in the year 2021, if the requirements of Section 6. and Schedule A of By-law 897-2021 are complied with, a building or structure containing a post-secondary school , student residence and non-residential uses, including uses ancillary to the foregoing uses, may be erected and used on the lot if in compliance with Regulations
- Rule B
to (DD); (B) The lands to which this Exception applies comprise all the lands shown on Diagram 1 of By-law 897-2021
- Rule C
Despite Regulation 40.10.40.40, the maximum permitted gross floor area on the lot is 58,000.0 square metres, of which a maximum of 19,500 square metres may be used for the purposes of a student residence
- Rule D
In addition to the provisions of Regulation 40.5.40.40(3) the gross floor area of a mixed-use building is also reduced by the area of a building used for the purpose of a greenhouse
- Rule E
The combined number of bed-sitting rooms and dwelling units must not exceed 625
- Rule F
Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 90.0 metres (GVCD 1928 - Pre 1978) and the highest point of the building or structure
- Rule G
Despite Regulations 40.5.40.10 (3), (4), (5), (6), (7) and (8) and 40.10.40.10(1), for those portions of the building above the finished ground surface, the permitted maximum height of each portion of a building or structure , is the height in metres as specified by the numbers following the HT symbol as shown on Diagram 3 of By-law 897-2021, with the exception of the following projections: (i) The structures and elements listed in (J) below; (ii) Parapets, structures for a green roof and sky lights to a maximum of 3.0 metres above the maximum permitted building height; (iii) Window washing equipment and structures for safety noise or wind attenuation purposes to a maximum of 3.5 metres above the maximum permitted building height; (iv) Lightning rods, antennae, aircraft warning lights, chimneys, ducts, vents, stacks and flues, mechanical screens and architectural screens to a maximum of 7.0 metres above the maximum permitted building height; (v) Despite iii. above, chimneys, vents, stacks, flues and air craft warning lights on the roof of that portion of the building subject to a height limit of 173.7 shown on Diagram 3 of By-law 897-2021 to a maximum of 9.5 metres above the maximum permitted building height; and (vi) Structures on a portion of the building subject to permitted building height of 74.9 metres or less, used for outdoor amenity space , open air recreation and greenhouse purposes, to a maximum of 5.5 metres above the maximum permitted building height
- Rule H
For the purpose of this Exception the term established grade is the Canadian Geodetic Datum elevation of 90.0 metres (GVCD 1928 - Pre 1978)
- Rule I
Despite Regulation 40.10.40.70 the minimum required building setbacks for the portion of a building or structure above the finished ground surface are shown on Diagram 3 of By-law 897-2021
- Rule J
Despite Regulations 5.10.40.70(1), 40.5.40.60 and 40.10.40.60 and (I) above, the following elements of a building may encroach within a required building setback : (i) lighting fixtures, cornices, sills, eaves to a maximum projection of 0.5 metres into a required building setback ; (ii) elements located at or below a height of 8.0 metres above established grade : (a) Canopies and awnings to a maximum projection of 4.5 metres into a required building setback ; (b) planters, bollards, stairs, railings, safety railings, guards and guardrails, retaining walls, walls, bicycle parking facilities, light standards, lighting fixtures, wheel chair ramps, landscape features and art installations; and (iii) Structures , and elements permitted by (G) above
- Rule K
The permitted maximum number of storeys in a building is the numerical value following the letters "ST" on Diagram 3 of By-law 897-2021 and the portion of a building used for the purpose of a greenhouse is not a storey
- Rule L
The permitted maximum gross floor area of a storey located more than 76.0 metres above established grade is 750.0 square metres
- Rule M
Despite Clause 40.10.40.50, amenity space is only required as follows: (i) a minimum of 2.0 square metres of indoor amenity space per bed-sitting room and per dwelling unit must be provided on the lot
- Rule N
Despite Clause 200.5.10.1, Table 200.5.10.1 and Section 200.15 a minimum of 3 parking spaces must be provided on the lot and must comply with the following requirements for an accessible parking space : (i) An accessible parking space must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.4 metres; and (c) vertical clearance of 2.1 metres; (ii) The entire length of an accessible parking space must be adjacent to a 1.5 metres wide accessible barrier free aisle or path as shown on Diagram 1 and Diagram 2 of By-law 579-2017
- Rule O
Regulation 40.10.40.1(1) does not apply with respect to the location of residential use portions of the building
- Rule P
Regulation 40.10.40.1(2) does not apply with respect to the floor level of the first storey
- Rule Q
Regulations 40.10.90.40(1) and (3) do not apply with respect to access to a loading space
- Rule R
Regulation 40.10.100.10(1) does not apply with respect to vehicle access
- Rule S
Regulation 200.5.1.10(12)(C) does not apply with respect to a vehicle entrance from the lot line
- Rule T
Section 600.10 with respect to Building Setback Overlay District Map does not apply
- Rule U
Section 600.20 with respect to Priority Retail Streets Overlay Map does not apply
- Rule V
A mixed-use building also includes a building with a student residence and a non-residential use
- Rule W
The provisions of this Exception respecting the height of any building or structure , including permitted exceptions, are subject to any further limitations as may be set out in a by-law passed under an agreement pursuant to Section 5.81 of the Aeronautics Act, R.S.C. 1985, c. A-2
- Rule X
Despite any existing or future severance, partition or division of the lands shown on Diagram 1 of By-law 897-2021, the provisions of this Exception and By-law 569-2013, as amended, apply to the lands as one lot , as if no severance, partition or division occurred.
Lot facts
- Area
- 1,593 m²
- Frontage
- 35 mestimated, irregular lot
- Depth
- 72.2 mestimated, irregular lot
- Street
- Mutual St
- Corner lot
- Yes, also on Dundas St E72.2 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Dundas Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x307) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%24 of 25 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 16
- Development applications
- 43
Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 151 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 335 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 191 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 188 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 154 m away
Latest activity nearby
- Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 238 m away - Building permit
Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.
231 DUNDAS ST E · Nov 19, 2026 · 191 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 149 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 185 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 82 m away - Building permit
Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors.
65 DUNDAS ST E · Oct 6, 2026 · 298 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Oct 2, 2026 · 81 m away - Building permit
Proposal to replace roof top mounted mechanical units.
311 JARVIS ST · Oct 1, 2026 · 242 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 78 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Sep 16, 2026 · 81 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 4 min walk
- Nearest traffic count
- 11,150 vehicles in 8 hDundas St E / Jarvis St, 40 m away, Dec 3, 2022
- Serious collisions within 500 m
- 242021–2026, killed or seriously injured: 3 fatal, 18 with pedestrians, 2 with cyclists
- Parks
- Arena Gardens2 min walk
- Moss Park4 min walk
- 45 Dalhousie St Park4 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.